1. Safety Information
1.1 General Safety Precautions
This document is intended for qualified persons and operators. Only qualified persons are allowed to perform activities marked with a warning symbol and the caption "Qualified person" in this document. Qualified persons must have the following skills:
- Knowledge of how lithium iron phosphate batteries work and are operated.
- Knowledge of how an energy storage system (including PV/battery/hybrid inverter, MPPT, Meter, Distribution box etc.) works and is operated.
- Knowledge of local applicable connection requirements, standards, and directives.
- Training in the installation and commissioning of electrical devices and batteries.
- Training in how to deal with the dangers and risks associated with installing, repairing and using electrical devices and batteries.
DANGER: Indicates a hazardous situation which, if not avoided, will result in death or serious injury.
WARNING: Indicates a potentially dangerous condition which could result in injury or death.
CAUTION: Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury or product permanent damage.
NOTICE: Indicates a situation which, if not avoided, can result in property damage or product not working or accelerated product damage.
1.2 Specific Safety Precautions for Battery Handling
- Do not impact the battery with heavy objects.
- Do not squeeze or pierce the battery pack.
- Do not throw the battery pack into the fire.
- Do not connect the battery in series.
- Do not expose the battery pack to conditions over 80°C.
- Do not put the battery near a heat source, such as a fireplace.
- Do not expose the battery pack to direct sunlight or rain.
- Do not allow non-qualified persons to disassemble the battery pack.
- Do not touch the battery pack with wet hands.
- Do not expose the battery pack to moisture or liquid environments.
- Do not short-circuit or reverse connect the battery.
- Do not use chargers or charging devices unapproved by the manufacturer to charge the battery.
- Do not mix batteries from different manufacturers or different types or brands.
- For safety, it is not recommended to use the battery near the ocean.
1.3 Required Safety Gear
When installing and handling the battery pack, wear the following safety gear:
- Insulated gloves
- Safety Glasses
- Safety Shoes
1.4 Emergency Safety Measures
Water Invasion: Cut off the AC power supply of the system first and then disconnect all switches under the premise of ensuring safety.
Electrolyte or Gas Leakage: If the battery pack leaks electrolyte, avoid contact with the leaking liquid or gas. If exposed, immediately perform the following actions:
- Gas Inhalation: Evacuate people from the contaminated area and seek medical aid immediately.
- Eye Contact: Flush eyes with clean and flowing water for 15 minutes, then seek medical aid immediately.
- Skin Contact: Thoroughly rinse the exposed area with soap and water to ensure no chemical or soap residue. Seek medical aid immediately.
- Ingestion: Induce vomiting and seek medical help immediately.
WARNING: In case of fire, use a carbon dioxide fire extinguisher rather than liquid to put out fires.
1.5 Environmental Considerations for Installation
- Do not expose the battery to direct sunlight, rain, and snow.
- Do not place the battery within children/pet touchable areas.
- Do not place the battery near heat sources or flammable material.
- Do not place the battery in a closed place where ventilation is not available.
- Do not drop, deform, impact, cut, or spear with a sharp object.
- Do not put heavy things on the battery.
- No conductive dust and water or other liquid should contact the battery.
2. Product Overview
The Datouboss 3U Rack LiFePO4 battery is designed for residential applications, serving as a storage unit in photovoltaic systems. It is a 48V Li-ion battery storage system with a built-in Battery Management System (BMS). It can operate in on-grid, back-up, and off-grid modes with compatible inverters.
2.1 Key Features
- High Safety: Made from LiFePO4 chemistry, complying with international safety and transport standards.
- Modular & Flexible: Supports up to 15 batteries connected in parallel.
- Built-in Pre-charge Circuit: Avoids rush current when connecting with different inverters/chargers.
- Dynamic Addressing: Automatic dynamic addressing function when connecting multiple batteries.
- High DOD: Supports a maximum of 96% Depth of Discharge (DOD) under off-grid and back-up applications.
- Built-in BMS: Provides warning and protection functions including over-discharging, over-charging, over-current, short-circuit, and low/high temperature.
- Automatic Balancing: LiFePO4 is equipped with automatic balancing function to meet long cycle life. New batteries need to go through multiple charge-discharge cycles (approximately 10 times) to reach their maximum capacity.
- Compact Size: Lightweight design for easy installation and maintenance.
- Communication Ports: CAN/RS485 port for external communication.





3. Specifications
3.1 General Parameters
| Item | Specification (MF-3U-48V 100A-A) |
|---|---|
| Rated voltage | 51.2V |
| Max. voltage range | 40~58.4V |
| Charge voltage | 58.4V |
| Low voltage cut-off | 40.0V |
| Nominal energy | 5.12kWh |
| Usable energy | 5.12kWh |
| Nominal capacity | 100Ah |
| Dimension (L*W*H) | 56.1*48.3*13.3cm (22.09*19.02*5.24in) |
| Weight | 43kg (94.8lb) |
| Standard charge current | ≤50A |
| Max. charge current | 100A |
| Standard discharge current | ≤50A |
| Max. discharge current | 100A (initial temp. ≤35°C) |
| Communication port | RS485/CAN/RS232 |
| Max. parallel number | 15pcs |
| Operating temperature (Charge) | 0~55°C |
| Operating temperature (Discharge) | -20~55°C |
| Storage temperature (Less than 1 year) | -20~25°C |
| Storage temperature (Less than 3 months) | 20~40°C |
| Environment at shipment state | 60±25%R.H. |
3.2 BMS Parameters
| Charge | Spec | Delay | Recovery |
|---|---|---|---|
| Cell Voltage Protection | 3600mV | 3000mS | 3400mV |
| Module Voltage Protection | 58.4V | 3000mS | 54.4V |
| Charge Over Current 1 | 105A | 2000mS | |
| Charge Over Current 2 | 120A | 2000mS | |
| Temperature Protection | <32°F/0°C or >149°F/65°C |
| Discharge | Spec | Delay | Recovery |
|---|---|---|---|
| Cell Voltage Protection | 2500mV | 3000mS | 3000mV |
| Module Voltage Protection | 40.0V | 3000mS | 48.0V |
| Discharge Over Current 1 | 105A | 2000mS | |
| Discharge Over Current 2 | 120A | 2000mS | |
| Short Circuit | 1200A | 400uS | |
| Temperature Protection | <-4°F/-20°C or >149°F/65°C |
| BMS | Parameter | Condition |
|---|---|---|
| PCB Temperature Protection | >221°F/105°C | |
| Cell Balance | 60mV charging equalization | |
| Temperature Accuracy | ±3°C | |
| Cell Voltage Accuracy | ±10mV | For Cells |
| Current Accuracy | ±2% | |
| SOC | 5% | |
| Power Consumption (Off Mode) | ≤20uA | Storage/Transport |
| Power Consumption (Sleep Mode) | ≤200uA | Sleeping |
| Power Consumption (Operating Mode) | ≤60mA | Charging/Discharging |
| Communication Ports | RS485, CAN, RS232 | |
| Bluetooth&Wifi Signal Distance | ≥49 feet/15m |

4. Installation
4.1 Preparation
The system installation must be performed by qualified personnel. Strictly follow local safety regulations and operating procedures.
4.1.1 Pre-installation Checklist
- Check if there is enough space for installation and if the rack/cabinet load-bearing capacity meets weight requirements.
- Verify that the power cable pair(s) used meet the maximum current requirement.
- Ensure the overall layout of power supply equipment and batteries is reasonable.
- Confirm the installer is wearing an anti-static wristband.
- Ensure two people are on site for installation work.
- Check for potential environmental risks at the installation site (e.g., flooding, sun exposure, corrosion, salt spray).
4.1.2 Required Tools
| Tool | Purpose |
|---|---|
| Screwdriver (slot, cross) | General fastening |
| Wrench | Tightening connections |
| Diagonal pliers | Cutting wires |
| Needle nose pliers | Handling small components |
| Clamping pliers | Securing connections |
| Wire stripper | Preparing wires |
| Multi-meter | Electrical measurements |
| Clamp meters | Measuring current |
| Insulating tape | Insulation |
| Thermometer | Observing installation environment temperature |
| Anti-static bracelet | Preventing electrostatic discharge |
| Cable ties | Cable management |
4.1.3 Package Inspection
- Load and unload the equipment according to specified requirements to prevent sun and rain damage.
- Check and confirm the goods (quantity, appearance, etc.) against the "scope of delivery" before unpacking.
- Handle with care during unpacking to protect the surface coating.
- If the inner packing is damaged, record and contact the manufacturer.
4.1.4 Included Materials
- Battery Pack (1 pc)
- User Manual (1 pc)
- Communication Cable (1 pc)
4.1.5 Optional Materials (Purchased Separately)
- Battery to Battery Communication Cable (1 pc)
- Parallel Cables (2AWG 200mm RED for positive, 2AWG 200mm BLACK for negative) (1 pc each)
- Grounding Cable (1 pc)
- Battery to Inverter positive cable (2/0AWG 2000mm RED)
- Battery to Inverter negative cable (2/0AWG 2000mm BLACK)
NOTICE: Keep unused cable pins NULL to avoid affecting closed-loop communication. A ground connection of communication cable may be required for some inverters; follow inverter manufacturer's rules.
4.2 Installation Procedures
CAUTION: Injuries may result if the product is lifted incorrectly or dropped. Wear suitable personal protective equipment. Ensure no lines are laid in the wall where drilling occurs.
4.2.1 Insert the Battery into the Rack Slot
Carefully slide the battery into the designated rack slot. For other installations, avoid direct contact with the ground and areas of high salinity/humidity to prevent rusting and corrosion.

4.2.2 Connect Batteries in Parallel (if applicable)
WARNING: Before connecting, ensure the air switch is in the OFF position and the POWER switch is OFF.
- Use the grounding wire included in the packaging to connect the casings of all batteries in series.
- Use the 2AWG terminal 200mm battery parallel wires (included) to connect the batteries in parallel.
- Connect the batteries with the battery communication wires. Connect from the OUT port of the host battery to the IN port of the slave battery.

4.2.3 Connect the Battery to the Inverter
NOTICE: Confirm inverter AC input and PV input are disconnected before wiring. The DC signal switch of the inverter/charger must be in the OFF status.
- Battery-Inverter Power Connection: Use the cables required by the inverter to connect the battery pack to the BAT input terminal of the inverter.
- Battery-Inverter Communication Connection: Use a standard Ethernet cable to connect the battery's RS485-1 or CAN port to the BMS communication port of the inverter.

CAUTION: The maximum tolerance current of each power cable and terminal is 125A, and 100A for continuous operation is suggested. Use corresponding number of power cable pairs according to field configuration and local connection requirements, standards, and directives.
NOTICE: The maximum communication cable length should be less than 15m between inverter/charger and battery. The maximum power cable length is suggested to be less than 10m.
5. Operation
5.1 Panel Interface

| NO. | Item | Usage Description |
|---|---|---|
| A | Handles | For handling, installation and disassembly of battery |
| B | Grounding | Used to connect battery with ground |
| C | Negative terminal | Used to connect the inverter/charger |
| D | Positive terminal | Used to connect the inverter/charger |
| E | 125A breaker | Over-current protection |
| F | Power switch | Used to Power on/off battery |
| G | ON/OFF indicator | Indicates whether the battery is turned on or off |
| H | Reset | Used to reset the BMS |
| I | ADS | Used to set the address of the battery in the battery pack |
| J | RUN | Used to show battery is in running status when lighting or flashing |
| K | ALM | Used to show battery Alarm/Protection status |
| L | Dry contact | 2 channels output signal, 1 channel input signal (Pin1 on the left) |
| M | SOC | Used to show battery real-time SOC |
| N | RS485-1 | Connect to host computer/inverter |
| O | CAN | Connect to inverter |
| P | RS232 | Connect to host computer/inverter |
| Q | RS485 IN / RS485 OUT | For communication between batteries |
| R | Mounting ear | Used to fix with rack |
5.2 Setting Inverter Communication Protocol (DIP Switch)
To distinguish different battery packs in a parallel system, set the address using the DIP switches on the BMS. Avoid setting the same address for multiple packs. The system supports a maximum of 15 parallel machines.
| ADD (Binary) | 1 | 2 | 3 | 4 | Function |
|---|---|---|---|---|---|
| 0000(0) | OFF | OFF | OFF | OFF | Single Battery |
| 0001(1) | ON | OFF | OFF | OFF | SET TO PACK1(MAIN) |
| 0010(2) | OFF | ON | OFF | OFF | SET TO PACK2 |
| 0011(3) | ON | ON | OFF | OFF | SET TO PACK3 |
| 0100(4) | OFF | OFF | ON | OFF | SET TO PACK4 |
| 0101(5) | ON | OFF | ON | OFF | SET TO PACK5 |
| 0110(6) | OFF | ON | ON | OFF | SET TO PACK6 |
| 0111(7) | ON | ON | ON | OFF | SET TO PACK7 |
| 1000(8) | OFF | OFF | OFF | ON | SET TO PACK8 |
| 1001(9) | ON | OFF | OFF | ON | SET TO PACK9 |
| 1010(10) | OFF | ON | OFF | ON | SET TO PACK10 |
| 1011(11) | ON | ON | OFF | ON | SET TO PACK11 |
| 1100(12) | OFF | OFF | ON | ON | SET TO PACK12 |
| 1101(13) | ON | OFF | ON | ON | SET TO PACK13 |
| 1110(14) | OFF | ON | ON | ON | SET TO PACK14 |
| 1111(15) | ON | ON | ON | ON | SET TO PACK15 |
NOTICE: Failure to follow the DIP switch setting will cause communication faults. For detailed settings with different inverter/charger, contact your supplier.
5.3 Communication Interface Pin Diagram
The battery supports RS485, CAN, and RS232 communication protocols. Refer to the table below for pin descriptions and supported devices.
| Port | Functional Description | PIN | Description |
|---|---|---|---|
| RS485-1 | Connect to host computer/inverter | 1,8 | RS485-B1 |
| 2,7 | RS485-A1 | ||
| 4 | NC | ||
| 5 | NC | ||
| CAN | Connect to host computer/inverter | 1,8 | NC |
| 2,7 | NC | ||
| 4 | CANH1 | ||
| 5 | CANL1 | ||
| RS232 | Connect to host computer | 3 | TX |
| 4 | RX | ||
| 5 | GND | ||
| RS485-2 | Parallel communication | 1,8 | RS485-B2 |
| 2,7 | RS485-A2 | ||
| 4,5 | NC | ||
| 6 | IN(L)/OUT(R) | ||
| 3,6 | GND |
5.4 LED Indicator Light Description
The battery features LED indicators for ON/OFF, RUN, ALM, and State of Charge (SOC).
5.4.1 LED Indicator Light Colors
| Indicator | Color |
|---|---|
| ON/OFF | Green |
| RUN | Green |
| ALM | Red |
| SOC (LED1~6) | Green |
5.4.2 LED Indicator Light Status Display
| Status | Description |
|---|---|
| On | The light stays on continuously. |
| Off | The light stays off continuously. |
| Slow Flash | The indicator turns on for 0.25S and off for 3.75S. |
| Fast Flash | The indicator turns on for 0.5S and off for 0.5S. |
| Medium Flash | The indicator turns on for 0.5S and off for 1.5S. |
5.4.3 SOC Indicator Status (Battery Level)
| SOC | Charging State Indicator Logic | Discharging State Indicator Logic | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LED1 | LED2 | LED3 | LED4 | LED5 | LED6 | LED1 | LED2 | LED3 | LED4 | LED5 | LED6 | |
| 0~16.6% | Off | Off | Off | Off | Off | Fast Flash | Off | Off | Off | Off | Off | On |
| 16.6~33.2% | Off | Off | Off | Off | Fast Flash | On | Off | Off | Off | On | On | On |
| 33.2~49.8% | Off | Off | Off | Fast Flash | On | On | Off | Off | On | On | On | On |
| 49.8~66.4% | Off | Off | Fast Flash | On | On | On | Off | Off | On | On | On | On |
| 66.4~83.0% | Off | Fast Flash | On | On | On | On | Off | On | On | On | On | On |
| 83.0~100% | Fast Flash | On | On | On | On | On | On | On | On | On | On | On |
| RUN | On | Medium Flash | ||||||||||
5.5 Mobile App Monitoring
The battery supports monitoring via a mobile application (JBD BMS) through WiFi and Bluetooth. This allows real-time monitoring of battery status, voltage, current, temperature, and other parameters.
- Scan the QR code in the manual to download the JBD BMS software.
- Open the software and search for nearby devices. Turn on Bluetooth on your phone and grant Bluetooth permissions.
- Modify the Inverter Protocol on the Parameter page (refer to APP-Quick Start for more detailed information).
6. Maintenance
6.1 Storage Guidelines
- Store the battery in a dry, clean, dark, and well-ventilated indoor environment.
- The recommended long-term storage temperature range is 15~30°C.
- Ensure no harmful gases, flammable or explosive products, or corrosive chemical substances are present in the storage location.
- Store and transport batteries at approximately 50% State of Charge (SOC). Do not store over 80% SOC for long periods.
- If the battery is not used for a long time, it needs to be charged every 6 months.
- Do not drop the battery, pile up more than 6 layers, and always keep it face up.
6.2 General Maintenance Tips
- Regularly inspect the product for any defects such as swelling. Contact your supplier for replacement if any issues are found.
- Do not disassemble batteries and components. Unauthorized disassembly voids warranty and may cause damage.
- Ensure the battery is safely grounded before use for safe and normal operation.
- Verify that the electrical parameters of all connected devices are mutually compatible.
- Consider environmental factors to ensure the system operates in suitable conditions, as environment and storage methods impact service life and reliability.
7. Troubleshooting
If you encounter any issues, refer to the table below for common problems and solutions. If the problem persists after following these steps, contact your supplier.
| Item | Solution | Measure |
|---|---|---|
| Unable to start | 1. Switch on battery and press RESET for 6s to observe whether the battery can be started. 2. Charge the battery with a charger or inverter to provide 54~57.6V voltage and observe whether it can be started. | If the abnormal status is still active after these steps, contact your supplier. |
| Unable to charge | 1. Check whether the cable connection between the battery and the inverter/charger is correct. 2. Check whether the inverter/charger setting is correct. 3. Check whether the battery is in charge protection mode; if yes, try to discharge the battery. | |
| Unable to discharge | 1. Check whether the cable connection between the battery and the inverter/charger is correct. 2. Check whether the battery occurs short circuit, reverse connection, pre-charge failure during connection inverter etc. 3. Check whether the battery is in discharge protection mode; if yes, try to charge the battery. | |
| High/Low temperature | 1. Stop the battery system for a while, and check whether the installation location temperature meets the requirement. 2. Avoid continuous full charging and discharging. | If there is any other situation(s) excluding in this table, turn off the faulty battery, and contact your supplier. |
| High current | Check whether the configuration and parameters setting on the inverter/charger is correct. | |
| ALM ON | Turn off all the batteries, and remove the fault battery from the system. | |
| Communication fail | 1. Check whether the communication cable type is correct and is contacted well. 2. Check whether the DIP switch setting is correct. 3. Check whether the inverter protocol related setting is correct. 4. Check whether both battery and inverter are working properly. |
NOTICE: Please restart after software is upgraded.
8. User Tips
- Optimal Performance: For best results, ensure the battery operates within the optimal temperature range of 15°C to 30°C. Extreme temperatures can affect performance and cycle life.
- Initial Setup: After installation, allow the battery to go through several full charge-discharge cycles (around 10) to help the automatic balancing function optimize cell capacity.
- App Monitoring: Utilize the mobile app for real-time monitoring of battery status. This can help in early detection of potential issues and optimize system performance.
- Parallel Configuration: When connecting multiple batteries in parallel, double-check the DIP switch settings for each battery to ensure correct addressing and communication.
- Cable Management: Use appropriate cable lengths and ensure all connections are secure and properly insulated to prevent energy loss and ensure safety.
9. Support & Warranty
For technical problems or if you cannot find a solution in this manual, please contact your supplier or MFUZOP support:
- Email: Manager@xdatou.com
- Website: www.xdatou.com
- Phone/Wechat/Whatsapp/LINE: +8613783531376
WARNING: Manually short-circuiting or reverse connecting the battery will void the warranty.
NOTICE: If any product failure happens, contact your supplier within 24 hours.
10. Disposal of Battery
Disposal of the battery must comply with local applicable disposal regulations for electronic waste and used batteries. Please review your local battery recycling or management regulations or contact ECO-WORTHY for more information.