DATOUBOSS DT4811B

Contents

DATOUBOSS 48V 11kW Hybrid Solar Inverter User Manual

Model: DT4811B

1. Introduction

This manual provides detailed instructions for the assembly, installation, operation, and troubleshooting of the DATOUBOSS 48V 11kW Hybrid Solar Inverter. Please read this manual carefully before installation and operation, and keep it for future reference.

1.1 Key Features

  • Pure sine wave inverter
  • Configurable input voltage range for home appliances and personal computers via LCD setting
  • Configurable battery charging current based on applications via LCD setting
  • Configurable AC/Solar Charger priority via LCD setting
  • Compatible with mains voltage or generator power
  • Auto restart while AC is recovering
  • Overload/Over temperature/short circuit protection
  • Smart battery charger design for optimized battery performance
  • Cold start function
  • Support parallel connection of inverters, up to 9 inverters can be parallelized
  • Support WiFi connection monitoring
  • Built-in dual MPPT, support dual PV inputs
  • Support timer switch on/off and timer charging of battery
  • Support power generation statistics function
  • With lithium battery activation function
  • With diesel generator dry node

1.2 Product Overview

Diagram of the inverter's front and rear panels with labeled ports and controls.
Figure 1: Inverter Appearance Description (Front and Rear Panels)

This diagram illustrates the various components and connection points on the inverter. The front panel features an LCD display, charging indicator, status indicator, fault indicator, and control buttons (ESC, UP, DOWN, ENTER). The rear panel includes PV inputs (PV1, PV2), AC input, Main Output, Second Output, RS232 and BMS/RS485 communication ports, Parallel Connection terminals, Dry Contact, DC Input, Battery Input, and a Power ON/OFF Switch.

2. Safety Instructions

WARNING: This chapter contains important safety and operating instructions. Read and keep this manual for future reference.

  • Before using the unit, read all instructions and cautionary markings on the unit, the batteries and all appropriate sections of this manual.
  • CAUTION: To reduce risk of injury, charge only deep-cycle lead acid type rechargeable batteries. Other types of batteries may burst, causing personal injury and damage.
  • Do not disassemble the unit. Take it to a qualified service center when service or repair is required. Incorrect re-assembly may result in a risk of electric shock or fire.
  • To reduce risk of electric shock, disconnect all wirings before attempting any maintenance or cleaning. Turning off the unit will not reduce this risk.
  • CAUTION: Only qualified personnel can install this device with battery.
  • NEVER charge a frozen battery.
  • For optimum operation of this inverter/charger, please follow required specifications to select appropriate cable size. It's very important to correctly operate this inverter/charger.
  • Be very cautious when working with metal tools on or around batteries. A potential risk exists to drop a tool to spark or short circuit batteries or other electrical parts and could cause an explosion.
  • Please strictly follow installation procedure when you want to disconnect AC or DC terminals. Please refer to the INSTALLATION section of this manual for the details.
  • One piece of 150A fuse is provided as over-current protection for the battery supply.
  • GROUNDING INSTRUCTIONS: This inverter/charger should be connected to a permanent grounder wiring system. Be sure to comply with local requirements and regulation to install this inverter.
  • NEVER cause AC output and DC input short circuited. Do NOT connect to the mains when DC input short circuits.
  • Warning!! Only qualified service persons are able to service this device. If errors still persist after following troubleshooting table, please send this inverter/charger back to local dealer or service center for maintenance.

3. Setup

3.1 Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package:

  • Inverter main unit x 1
  • User manual x 1
  • Parallel Cable x 1 (if applicable)
  • RS232 cable
  • MC4 connectors
  • Battery cables
  • Mounting hardware
Image showing the inverter and its included accessories.
Figure 2: Inverter and Accessories

The package includes the main inverter unit, user manual, RS232 cable, MC4 connectors, battery cables, and mounting hardware.

Play video
Watch video online

Video 1: Product Unboxing and Overview of Ports. This video demonstrates the unboxing process, highlights the included accessories, and provides a visual tour of the inverter's various connection ports and controls.

3.2 Preparation

Before connecting any wires, remove the bottom cover by unscrewing the two screws as shown in the manual.

3.3 Mounting the Unit

Consider the following points when selecting a mounting location:

  • Do not mount the inverter on flammable construction materials.
  • Mount on a solid surface.
  • Install this inverter at eye level to allow the LCD display to be read at all times.
  • For proper air circulation to dissipate heat, allow a clearance of approximately 20 cm to the side and approximately 50 cm above and below the unit.
  • The ambient temperature should be between 0°C and 55°C to ensure optimal operation.
  • The recommended installation position is to be adhered to the wall vertically.
  • Be sure to keep other objects and surfaces clear to guarantee sufficient heat dissipation and to have enough space for removing wires.

SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.

To install the unit, use the M6*80mm expansion bolts to secure it by screwing two screws.

3.4 Battery Connection

CAUTION: For safety operation and regulation compliance, it's requested to install a separate DC over-current protector or disconnect device between battery and inverter. It may not be requested to have a disconnect device in some applications, however, it's still requested to have over-current protection installed. Please refer to typical amperage in the table below for required fuse or breaker size.

WARNING! All wiring must be performed by qualified personnel.

WARNING! It's very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable and terminal size as below.

Follow these steps to implement battery connection:

  1. Assemble battery ring terminal based on recommended battery cable and terminal size.
  2. Insert the battery wires flatly into battery connectors of inverter and make sure the bolts are tightened with a torque of 2 Nm in clockwise direction. Make sure polarity at both the battery and the inverter/charger is correctly connected and conductors are tightly screwed into the battery terminals. Recommended tool: #2 Pozi Screwdriver.
Model Typical Amperage Battery Capacity Wire Size Cable (mm²) Ring Terminal Dimensions L(mm) Ring Terminal Dimensions D(mm) Torque Value
1KVA/2KVA 44A/88A 100AH 1*6AWG 14 33.2 6.4 2-3 Nm
2*10AWG 6 23.8 6.4
3KVA 132A 100AH 1*4AWG 22 33.2 6.4 2-3 Nm
200AH 2*8AWG 9 29.2 6.4
5KVA 109A 200AH 1*2AWG 38 39.2 6.4 2-3 Nm
2*6AWG 28 33.2 6.4

3.5 AC Input/Output Connection

CAUTION!! Before connecting to AC input power source, please install a separate AC breaker between inverter and AC input power source. This will ensure the Inverter can be disconnected during maintenance and fully protected from over current of AC input. The recommended spec of breaker is 32A for 3KW and 50A for 5KW.

CAUTION!! There are two terminal blocks with " IN " and " OUT" markings. Please do NOT mis-connect input and output connectors.

WARNING! All wiring must be performed by qualified personnel.

WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC input connection. To reduce risk of injury, please use the proper recommended cable size as below.

Follow these steps to implement AC input/output connection:

  1. Before making AC input/output connection, be sure to open DC protector or disconnector first.
  2. Remove insulation sleeve 10mm for six conductors. And shorten phase L and neutral conductor N3 mm.
  3. Insert AC input wires according to polarities indicated on the terminal block and tighten the terminal screws. Be sure to connect PE protective conductor (yellow-green) first.
  4. Make sure the wires are securely connected.

Suggested Cable Requirement for AC Wires:

Model Gauge Torque Value
1KVA 16AWG 0.5~0.6Nm
2KVA 14AWG 0.8-1.0Nm
3KVA 12AWG 1.2-1.6Nm
5KVA 8AWG 1.4-1.6Nm

3.6 PV Connection (Only for models with solar charger)

CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules.

WARNING! All wiring must be performed by a qualified personnel.

WARNING! It's very important for system safety and efficient operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the proper recommended cable size as below.

Follow these steps to implement PV module connection:

  1. Remove insulation sleeve 10 mm for positive and negative conductors.
  2. Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool.
  3. Fix wire cover to the inverter with supplied screws as shown in the diagram.
  4. Check correct polarity of wire from PV modules and PV input connectors. Then, connect positive pole(+) of connection wire to positive pole(+) of PV input connector. Connect negative pole (-)of connection wire to negative pole(-) of PV input connector. Screw two wires tightly in clockwise direction. Recommended tool: 4mm blade screwdriver.
Typical Amperage Gauge Torque Value
10A 12AWG 1.4-1.6Nm

PV Module Selection:

When choosing the right PV module, be sure to first consider the following requirements:

  • The open circuit voltage (Voc) of the PV modules does not exceed the maximum PV array open circuit voltage of the inverter.
  • The maximum supply voltage of the PV modules should be close to the optimal PV access voltage range of the inverter for best performance.
  • If one PV module cannot meet this requirement, it is necessary to connect multiple PV modules in series.
Detailed wiring diagram for the hybrid solar inverter system.
Figure 3: Wiring and Technical Specifications Diagram

This diagram illustrates the connections for PV power (11000W, 500VDC max open circuit voltage, 150A max PV charging current, recommended 10 AWG/6mm² cable), Mains Power (AC input 220/230/240V, 160A charging current, 10 AWG/6mm² cable, 63A breaker), Generator, 48V Battery (Lead-Acid, AGM, Flooded, Lithium, 2 AWG/25mm² cable, 150A fuse), and 230V Electrical appliances/household loads (AC output 11000W, 220/230/240V, 10 AWG/6mm² cable, 63A breaker).

3.7 Final Assembly

After connecting all wirings, please put the bottom cover back by screwing the two screws.

4. Operating Instructions

4.1 Power ON/OFF

Once the unit has been properly installed and the batteries are connected well, simply press the On/Off switch (located on the bottom of the case) to turn on the unit.

Steps to Start Up:

  • Connect the battery that meets the requirements (battery voltage needs to be beyond 23V) or AC (AC needs to confirm the suitable input range depending on the output mode), then you can start up the inverter.
  • Mains power on: Connect to normal AC power, press the switch, the system will automatically turn on. If you set AC output power priority, after waiting for a period of time, the panel will display AC mode that represents turn on the machine successfully, then will enter the AC mode.
  • Battery boot: Connect to battery, press the power-on button to establish a working power source. The system will automatically turn on, after waiting for a period of time, the panel will display battery mode that represents turn on the machine successfully, then will enter the battery mode.

Shutdown Steps:

When the system is in battery mode or AC mode output, press the switch again, then the system will be turned off.

4.2 Operation and Display Panel

The operation and display panel, shown in Figure 1, is on the front panel of the inverter. It includes three indicators, four function keys, and an LCD display, indicating the operating status and input/output power information.

Function Keys:

Function Key Description
ESC To exit setting mode
UP To go to previous selection
DOWN To go to next selection
ENTER To confirm the selection in setting mode or enter setting mode

LED Indicator:

LED Indicator Color State Messages
AC/INV Green Solid On Output is powered by utility in Line mode.
Flashing Output is powered by battery or PV in battery mode.
CHG Green Solid On Battery is fully charged.
Flashing Battery is charging.
FAULT Red Solid On Fault occurs in the inverter.
Flashing Warning condition occurs in the inverter.

4.3 LCD Setting

After pressing and holding the ENTER button for 3 seconds, the unit will enter setting mode. Press the "UP" or "DOWN" button to select setting programs. Then, press the "ENTER" button to confirm the selection or "ESC" button to exit.

Setting Programs:

Program Description Selectable Option
00 Exit setting mode ESC
01 Output source priority: To configure load power source priority
  • Utility first (U56): Utility will provide power to the loads as first priority. Solar and battery energy will provide power to the loads only when utility power is not available.
  • Solar first (S06): Solar energy provides power to the loads as first priority. If solar energy is not sufficient to power all connected loads, Utility energy will supply power to the loads at the same time.
  • BU priority (S60): Solar energy provides power to the loads as first priority. If solar energy is not sufficient to power all connected loads, battery energy will supply power to the loads at the same time. Utility provides power to the loads only when battery voltage drops to either low-level warning voltage or the setting point in program 12.
02 Maximum charging current: To configure total charging current for solar and utility chargers. (Max. charging current = utility charging current + solar charging current) 60A (default). Setting range is from 10A to 100A. Increment of each click is 10A.
03 AC input voltage range
  • Appliances (APL): If selected, acceptable AC input voltage range will be within 90-280VAC.
  • UPS: If selected, acceptable AC input voltage range will be within 170-280VAC.
05 Battery type
  • AGM (AGn): Default.
  • Flooded (FLd):
  • User-Defined (USE): If "User-Defined" is selected, battery charge voltage and low DC cut-off voltage can be set up in program 26, 27 and 29.
23 Overload bypass: When enabled, the unit will transfer to line mode if overload occurs in battery mode. Bypass disable (default) / Bypass enable
25 Record Fault code Record enable (default) / Record disable
26 Bulk charging voltage (C.V voltage) 3KVA default: 28.2V, 5KVA default: 56.4V. Setting range is from 25.0V to 31.5V for 3KVA model and 48.0V to 61.0V for 5KVA model. Increment of each click is 0.1V.
27 Floating charging voltage 3KVA default: 27.0V, 5KVA default: 54.0V.
28 Reset factory setting Default.
29 Low DC cut-off voltage: If battery power is only power source available, inverter will shut down. If PV energy and battery power are available, inverter will charge battery without AC output. 3KVA default: 21.0V to 24.0V, 5KVA default: 42.0V to 48.0V. Setting range is from 21.0V to 24.0V for 3KVA model and 42.0V to 48.0V for 5KVA model. Increment of each click is 0.1V.
30 Battery equalization Battery equalization disable (default). If "Flooded" or "User Defined" is selected in program 05, this program can be set up.
31 Battery equalization voltage 3KVA default: 29.2V, 5KVA default: 58.4V. Setting range is from 25.0V to 31.5V for 3KVA model and 48.0V to 61.0V for 5KVA model. Increment of each click is 0.1V.
33 Battery equalized time 60min (default). Setting range is from 5min to 900min. Increment of each click is 5min.
34 Battery equalized timeout 120min (default). Setting range is from 5min to 900min. Increment of each click is 5min.
35 Equalization interval 30days (default). Setting range is from 0 to 90 days. Increment of each click is 1 day.
36 Equalization activated immediately Enable / Disable (default). If "Enable" is selected, it activates battery equalization immediately. If "Disable" is selected, it will cancel equalization until the next activated equalization time.
37 BMS Function Switch Off (default) / On. Whether to enable the BMS communication function.
38 Bat Soc Under Lock BMS low voltage SOC value. If the BMS SOC value is lower than the set value, the inverter will shut down to protect the battery.
39 Bat Soc Turn To Ac When the working mode of the inverter is set to the battery priority mode, the inverter will be forced to enter the mains charging when the SOC of the BMS is lower than the set value.
40 Bat Soc Turn To Dc When the working mode of the inverter is set to the battery priority mode, the inverter resumes the DC working mode when the SOC of the BMS is higher than the set value.
41 Bat Restart Soc When the inverter is turned on, the SOC must be higher than the set value to work normally.

4.4 Working Modes

The inverter supports multiple working modes to optimize power usage and ensure continuous supply.

Diagram illustrating the four charging modes and three charge output working modes of the inverter.
Figure 4: Inverter Charging and Output Working Modes

This diagram details the inverter's operational modes. It includes four charging modes: Priority of the mains power supply (mains charges battery if available), Solar priority (solar charges battery first), Mixed loading (solar and mains charge battery simultaneously), and Solar only (battery charged only by solar). It also shows three charge output working modes: Net (mains current has priority over load), Solar (solar > battery > grid power consumer), and SBU (solar > battery (below undervoltage vapor point) > grid current, in order of priority).

Battery-Free Operation:

The inverter can power loads through photovoltaic power generation and connection to the utility grid without the need to connect batteries. This feature is supported for various battery types including AGM, GEL, FLD, LI, and SLD. An optional BMS (Battery Management System) can be added to monitor battery status, prevent overcharging and over-discharging, and extend battery life.

Diagram showing battery-free operation and supported battery types with BMS.
Figure 5: Battery-Free Operation and BMS Support

This image illustrates the inverter's capability to operate without batteries, drawing power directly from PV and the utility grid. It also highlights compatibility with various battery types (AGM, GEL, FLD, LI, SLD, USER) when a BMS is integrated to manage battery health.

4.5 Battery Equalization

The equalization function is added to the charge controller to reverse the buildup of negative chemical effects like stratification and to remove sulfate crystals that might have built up on the plates. Equalization helps maintain battery capacity and is recommended periodically.

How to Apply Equalization Function:

You must enable the battery equalization function in monitoring LCD setting program 30 first. Then, you may apply this function in the device by either one of the following methods:

  1. Setting equalization interval in program 35.
  2. Active equalization immediately in program 36.

When to Equalize:

When the set equalization interval (battery equalization cycle) is reached, or equalization is activated immediately, the controller will enter the Equalize stage.

Equalize Charging Time and Timeout:

In the Equalize stage, the controller will supply power to charge the battery as much as possible until the battery voltage raises to the battery equalization voltage. Then, constant-voltage regulation is applied to maintain the battery voltage at the battery equalization voltage. The battery will remain in the Equalize stage until the set battery equalized time is reached.

However, if the battery equalized time expires and the battery voltage doesn't rise to the battery equalization voltage point, the charge controller will extend the battery equalized time until the battery voltage achieves the battery equalization voltage. If the battery voltage is still lower than the battery equalization voltage when the battery equalized timeout setting is over, the charge controller will stop equalization and return to the float stage.

5. Maintenance

Regular maintenance ensures the longevity and optimal performance of your DATOUBOSS Hybrid Solar Inverter. Always disconnect all power sources (PV, AC, and Battery) before performing any maintenance.

  • Cleaning: Periodically clean the exterior of the inverter, especially the ventilation openings, to prevent dust and debris buildup. Ensure that the air flow is not blocked to maintain proper cooling.
  • Connection Checks: Regularly inspect all electrical connections (PV, AC, Battery) for tightness and signs of corrosion. Loose connections can lead to poor performance or safety hazards.
  • Battery Health: If using batteries, monitor their health and perform battery equalization as described in Section 4.5 to prevent stratification and sulfation, especially for lead-acid batteries.
  • Environmental Check: Ensure the inverter's operating environment remains within the specified temperature and humidity ranges.
  • Firmware Updates: Check with the manufacturer or authorized service center for any available firmware updates that may improve performance or add new features.

6. Troubleshooting

This section provides guidance on common issues and their solutions. For persistent problems, contact qualified service personnel or the repair center.

6.1 Fault Codes and Warning Events

Fault: The inverter enters the fault mode, the red LED light is always on and the LCD displays the fault code.

Alarm: The red LED flashes, and the LCD displays an alarm code, the inverter does not enter the failure mode.

Warning Indicator:

Warning Code Warning Event Audible Alarm
01 Fan is locked when inverter is on. Beep three times every second
02 Over temperature None
03 Battery is over-charged Beep once every second
04 Low battery Beep once every second
07 Overload Beep once every 0.5 second
10 Output power derating Beep twice every 3 seconds
15 PV energy is low. Beep twice every 3 seconds
16 High AC input (>280VAC) during BUS soft start None
49 Battery equalization None
6P Battery is not connected None

Fault Reference Code:

Fault Code Fault Event
01 Fan is locked when inverter is off.
02 Over temperature or NTC is not connected well.
03 Battery voltage is too high.
04 Battery voltage is too low.
05 Output short circuited or over temperature is detected by internal converter components.
06 Output voltage is too high.
07 Over load time out.
08 Bus voltage is too high
09 Bus soft start failed
51 Over currents or surge
52 Bus voltage is too low
53 Inverter soft start failed
55 Over DC voltage in AC output
57 Current sensor failed
58 Output voltage is too low
59 PV voltage is over limitation

6.2 Common Troubleshooting Steps

Problem Explanation/Possible Cause What to Do
Unit shuts down automatically during startup process. The battery voltage is too low (<1.91V/Cell). 1. Re-charge battery. 2. Replace battery.
No response after power on. 1. The battery voltage is far too low (<1.4V/Cell). 2. Internal fuse tripped. 1. Contact repair center for replacing the fuse. 2. Re-charge battery.
Mains exist but the unit works in battery mode. Insufficient quality of AC power. (Shore or Generator) 1. Check if AC wires are too thin and/or too long. 2. Check if generator (if applied) is working well or if input voltage range setting is correct. (UP-->appliance).
When the unit is turned on, internal relay is switched on and off repeatedly. Battery is disconnected. Check if battery wires are connected well.
Buzzer beeps continuously and red LED is on. Overload error. The inverter is overload 105% and time is up. Reduce the connected load by switching off some equipment.
If PV input voltage is higher than specification, the output power will be derated. At this time, if connected loads is higher than derated output power, it will cause overload. Reduce the number of PV modules in series or the connected load.
Output short circuited. Check if wiring is connected well and remove abnormal load.
Internal temperature of inverter component is over 100°C. Check whether the air flow of the unit is blocked or whether the ambient temperature is too high.
The battery voltage is too high. Check if spec and quantity of batteries meet requirements.
Fan fault Replace the fan.
Output abnormal (Inverter voltage below than 190Vac or is higher than 260Vac) 1. Reduce the connected load. 2. Return to repair center.
Internal components failed. Return to repair center.
Over current or surge. Restart the unit, if the error happens again, please return to repair center.
Bus voltage is too low. Restart the unit, if the error happens again, please return to repair center.
Output voltage is unbalanced. Restart the unit, if the error happens again, please return to repair center.
PV input voltage is beyond the specification. Reduce the number of PV modules in series.

7. Specifications

The following table provides detailed technical specifications for the DATOUBOSS 48V 11kW Hybrid Solar Inverter (Model DT4811B).

Table of detailed technical specifications for the DT4811B inverter.
Figure 6: DT4811B Inverter Technical Specifications

This table provides comprehensive specifications including input sources, rated input voltage, frequency, rated capacity, output voltage, waveform, transfer time, peak power, overload ability, peak efficiency, battery voltage, charging voltages, PV charging mode, max PV input power, MPPT tracking range, best voltage, max PV input voltage, max PV charging current, max AC charging current, max charging current, display type, communication ports, parallel connect interface, operating temperature, humidity, storage temperature, altitude, and noise level.

7.1 General Specifications (Model DT4811B)

  • Capacity: 11000VA / 11000W
  • Operating Temperature Range: -10 to 50°C
  • Protection Degree: IP21
  • Size: 70.80 x 57.00 x 24.10 cm (27.87 x 22.44 x 9.49 inches)
  • Weight: 21.94 kg (48.37 lbs)
  • Certification: CE

7.2 Inverter Mode

  • DC Input: 48VDC, 254.6A
  • AC Output: 230VAC, 50/60Hz, 47.8A, 1Φ
  • Waveform: Pure Sine Wave

7.3 AC Charger

  • AC Input: 230VAC, 50/60Hz, 60A, 1Φ
  • AC Charger: 54VDC, 150A

7.4 Solar Mode

  • Solar Panel Power: 2 x 5500W (Total 11000W)
  • Max. Charging Current: 150A
  • Solar Voltage Range (Vmp): 90-500VDC
  • Best Voltage Range (Vmp): 300-400VDC
  • Max. Solar Voltage: 500VDC

8. Warranty and Support

For warranty information, please refer to the terms and conditions provided by your seller at the time of purchase. Keep your proof of purchase for any warranty claims.

If you encounter any issues that cannot be resolved using the troubleshooting guide, please contact your seller or an authorized service center for assistance. Ensure to provide the product model (DT4811B) and serial number (found on the product label) when seeking support.

Note: Only qualified service persons are able to service this device. Attempting repairs by unauthorized personnel may void your warranty and pose safety risks.

A user manual in PDF format is available for download: User manual (PDF)

9. User Tips

  • Manual Availability: The user manual is available in PDF format. Some users have found it helpful to download it for easy access.
  • Package Inspection: Upon receiving your inverter, carefully inspect the package for any signs of damage or tampering. Verify that all accessories listed in the "Unpacking and Inspection" section are present. If anything is missing or damaged, contact your seller immediately.
  • Battery-Free Operation: This inverter supports operation without batteries, drawing power directly from solar PV and the utility grid. This can be a useful feature for certain setups.
  • Single-Phase Operation: The inverter is designed for single-phase operation.
Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.