1. Introduction and Overview
This manual provides essential information for the assembly, installation, operation, and troubleshooting of your DATOUBOSS 4862S Hybrid Solar Inverter. Please read it carefully before installation and operation, and keep it for future reference.
The DATOUBOSS 4862S is a multi-function inverter/charger that combines the capabilities of an inverter, solar charger, and battery charger. It delivers uninterruptible power support with a compact design. Its comprehensive LCD display allows for user-configurable and easily accessible button operations, including battery charging current, AC/solar charger priority, and acceptable input voltage based on different applications.
Key Features:
- Pure sine wave output (220/230/240VAC ± 5%) compatible with all household and commercial appliances.
- 48V 6200W rated power with MPPT PV charging, Max PV input 8500W, tracking range 60-500Vdc, and conversion efficiency up to 98%.
- Wide input voltage range: 90-280VAC (APL mode) / 170-280VAC (UPS mode), auto 50/60Hz, grid feed-in 100-280VAC.
- Smart battery management: Compatible with lead-acid (AGM/Flooded) and lithium (3rd-party) batteries, with customizable charging voltage and built-in battery equalization.
- UPS-grade seamless switching: ≤ 10ms (UPS) / ≤ 20ms (APL) for uninterrupted power.
- Strong load capacity: Graded overload protection in battery mode, with unlimited load capability when equipped with a CT sensor.
- Multiple working modes: Solar/Utility/Battery priority, Grid Feed-in (SUF), and Local Consumption (PEC), customizable via LCD.
- Dual PV & utility charging, Max AC charging 100A, customizable charging priority.
- All-round protection: Includes overload, over-temperature, short circuit, and overvoltage protection, with auto fault alarm and real-time fault codes displayed on the LCD.


2. Safety Instructions
WARNING: This chapter contains important safety and operating instructions. Read and keep this manual for future reference.
- Before using the unit, read all instructions and cautionary markings on the unit, the batteries, and all appropriate sections of this manual.
- CAUTION: To reduce the risk of injury, charge only deep-cycle lead-acid type rechargeable batteries. Other types of batteries may burst, causing personal injury and damage.
- Do not disassemble the unit. Take it to a qualified service center when service or repair is required. Incorrect re-assembly may result in a risk of electric shock or fire.
- To reduce the risk of electric shock, disconnect all wirings before attempting any maintenance or cleaning. Turning off the unit will not reduce this risk.
- CAUTION: Only qualified personnel can install this device with battery.
- NEVER charge a frozen battery.
- Be very cautious when working with metal tools on or around batteries. A potential risk exists to drop a tool to spark or short circuit batteries or other electrical parts and could cause an explosion.
- Please strictly follow the installation procedure when you want to disconnect AC or DC terminals.
- A 150A fuse is provided as over-current protection for the battery supply.
- GROUNDING INSTRUCTIONS: This inverter/charger should be connected to a permanent grounded wiring system. Be sure to comply with local requirements and regulations to install this inverter.
- NEVER cause AC output and DC input to be short-circuited. Do NOT connect to the mains when DC input is short-circuited.
- Warning: Only qualified service persons are able to service this device. If errors still persist after following the troubleshooting table, please send this inverter/charger back to a local dealer or service center for maintenance.
3. Installation
3.1 Unpacking and Inspection
Before installation, please inspect the unit. Ensure that nothing inside the package is damaged. You should have received the inverter unit and a user manual. A detailed user manual is available in PDF format: DATOUBOSS 4862S User Manual (PDF).
3.2 Preparation
Before connecting any wiring, remove the bottom cover by unscrewing two screws.
3.3 Mounting the Unit
Consider the following points when selecting where to install the inverter:
- Do not mount the inverter on flammable construction materials.
- Mount on a solid surface.
- Install this inverter at eye level to allow the LCD display to be read at all times.
- For proper air circulation to dissipate heat, allow a clearance of approximately 20 cm to the sides and approximately 50 cm above and below the unit.
- The ambient temperature should be within the range of -10~50°C for optimal operation.
- The recommended installation position is to be adhered to the wall vertically.
- Ensure sufficient heat dissipation and space for wiring.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
Install the unit by screwing three M6*80mm expansion bolts.

3.4 Battery Connection
CAUTION: For safety and regulation compliance, it is requested to install a separate DC over-current protector or disconnect device between the battery and inverter.
WARNING: All wiring must be performed by qualified personnel. It is very important for system safety and efficient operation to use appropriate cable for battery connection. Refer to the table below for recommended cable and terminal sizes.
| Rated Capacity | Typical Amperage | Battery Capacity | Wire Size | Ring Terminal D(mm) | Ring Terminal L(mm) | Torque Value | |
|---|---|---|---|---|---|---|---|
| 2KVA | 165A | 200AH | 2*4AWG | 25 | 8.4 | 33.2 | 5Nm |
| 3.6KVA | 138A | 200AH | 2*4AWG | 25 | 8.4 | 33.2 | 5Nm |
| 6.2KVA | 128A | 200AH | 1*2AWG / 2*4AWG | 38 / 25 | 8.4 | 39.2 / 33.2 | 5Nm |
| 11KVA | 228A | 250AH | 1*3/0AWG | 85 | 8.4 | 54 | 5Nm |
Follow these steps to implement battery connection:
- Assemble battery ring terminal based on recommended battery cable and terminal size.
- Insert the battery wires flatly into the inverter's battery connectors and ensure the bolts are tightened with a torque of 2 Nm in a clockwise direction. Ensure polarity is correct and conductors are tightly screwed. Recommended tool: #2 Pozi Screwdriver.

3.5 AC Input/Output Connection
CAUTION: Before connecting to an AC input power source, please install a separate AC breaker between the inverter and the AC input power source. This will ensure the inverter can be disconnected during maintenance and fully protected from over-current of AC input. The recommended spec of breaker is 32A for 24V systems and 63A for 48V systems.
CAUTION: There are two terminal blocks with "IN" and "OUT" markings. Please do NOT mis-connect input and output connectors.
WARNING: All wiring must be performed by qualified personnel. It is very important for system safety and efficient operation to use appropriate cable for AC input connection. Refer to the table below for recommended cable sizes.
| Rated Capacity | Gauge | Torque Value |
|---|---|---|
| 2KVA | 14AWG | 0.8~1.0Nm |
| 3.6KVA | 12AWG | 1.2~1.6Nm |
| 6.2KVA | 10AWG | 1.4~1.6Nm |
| 11KVA | 8AWG | 1.4~1.6Nm |
Follow these steps to implement AC input/output connection:
- Before making AC input/output connection, ensure to open the DC protector or disconnector first.
- Remove insulation sleeve 10mm for six conductors. Shorten phase L and neutral conductor N by 3mm.
- Insert AC input wires according to polarities indicated on the terminal block and tighten the terminal screws. Ensure to connect the PE protective conductor first.

3.6 PV Connection
CAUTION: Before connecting to PV modules, please install a separate DC circuit breaker between the inverter and PV modules.
WARNING: All wiring must be performed by qualified personnel. It is very important for system safety and efficient operation to use appropriate cable for PV module connection. Refer to the table below for recommended cable sizes.
| Typical Amperage | Gauge | Torque Value |
|---|---|---|
| 30A | 12AWG | 1.4~1.6Nm |
PV Module Selection:
When choosing the right PV module, ensure the open circuit voltage (Voc) of the PV modules does not exceed the maximum PV array open circuit voltage of the inverter. The maximum supply voltage of the PV modules should be close to the optimal PV access voltage range of the inverter for best performance. If one PV module cannot meet this requirement, it is necessary to connect multiple PV modules in series.
Follow these steps to implement PV module connection:
- Remove insulation sleeve 10 mm for positive and negative conductors.
- Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool.
- Fix the wire cover to the inverter with supplied screws.
- Check correct polarity of wire from PV modules and PV input connectors. Then, connect positive pole (+) of connection wire to positive pole (+) of PV input connector. Connect negative pole (-) of connection wire to negative pole (-) of PV input connector. Screw two wires tightly in a clockwise direction. Recommended tool: 4mm blade screwdriver.

3.7 Final Assembly
After connecting all wirings, please put the bottom cover back by screwing the two screws.
4. Operation
4.1 Power ON/OFF
Once the unit has been properly installed and the batteries are connected, simply press the On/Off switch (located on the button of the case) to turn on the unit.
Steps to Start Up:
Connect the battery that meets the requirements (battery voltage needs to be beyond 23V) or AC (AC needs to confirm the suitable input range depending on the output mode), then you can start up the inverter.
- Mains power on: Connect to normal AC power, press the switch. The system will automatically turn on. If you set AC output power priority, after waiting for a period of time, the panel will display AC mode, indicating the machine is on and will enter AC mode.
- Battery boot: Connect to battery, press the power-on button to establish a working power source. The system will automatically turn on. After waiting for a period of time, the panel will display battery mode, indicating the machine is on and will enter battery mode.
Shutdown Steps:
When the system is in battery mode or AC mode output, press the switch again, then the system will be turned off.
4.2 Operation and Display Panel
The operation and display panel, located on the front of the inverter, includes three indicators, four function keys, and an LCD display, indicating the operating status and input/output power information.

| LED Indicator | Color | Messages |
|---|---|---|
| AC/INV | Green | Solid On: Output is powered by utility in Line mode. Flashing: Output is powered by battery or PV in battery mode. |
| CHG | Yellow | Solid On: Battery is fully charged. Flashing: Battery is charging. |
| FAULT | Red | Solid On: Fault occurs in the inverter. Flashing: Warning condition occurs in the inverter. |
| Function Key | Description |
|---|---|
| ESC | To exit setting mode |
| UP | To go to previous selection |
| DOWN | To go to next selection |
| ENTER | To confirm the selection in setting mode or enter setting mode |
4.3 Operating Modes
The inverter supports various operating modes, which can be configured via the LCD settings. These modes determine how the inverter prioritizes power sources (solar, utility, battery) for charging and discharging.


5. Settings
The LCD display allows for various settings to be configured. To enter setting mode, press and hold the ENTER button for 3 seconds. Use UP/DOWN to select programs and ENTER to confirm or ESC to exit.
5.1 Key Settings:
- Output Source Priority (Program 01): Configure whether solar, utility, or battery is prioritized for powering loads. Options include Solar First (SUF), Utility First (SBU), and Local Consumption (PEC).
- Max Charging Current (Program 02): Set the total charging current for solar and utility chargers (10A to max charging current).
- AC Input Voltage Range (Program 03): Select acceptable AC input voltage range for appliances (APL) or UPS.
- Battery Type (Program 05): Choose between AGM, Flooded, User-Defined, or specific lithium battery protocols (LIA, PYL, E9F, GHO, FEL, LIB, LIC).
- Low DC Cut-off Voltage (Program 29): Set the voltage at which the inverter will shut down if battery power is the only source.
- Battery Equalization (Program 30): Enable or disable battery equalization.
- Battery Equalization Voltage (Program 31): Set the voltage for battery equalization.
- Battery Equalized Time (Program 33): Set the duration for battery equalization.
- Equalization Interval (Program 35): Set the frequency for battery equalization.
- Equalization Activated Immediately (Program 36): Activate battery equalization immediately.
- BMS Function Switch (Program 37): Enable or disable BMS communication.
- Bat Soc Under Lock (Program 38): Set the battery SOC value below which the inverter will shut down to protect the battery.
- Bat Soc Turn To Ac (Program 39): Set the battery SOC value at which the inverter will switch to mains charging in battery priority mode.
- Bat Soc Turn To Dc (Program 40): Set the battery SOC value at which the inverter will resume DC working mode in battery priority mode.
- Bat Restart Soc (Program 41): Set the battery SOC value required for the inverter to start normally.
- Reset PV Energy Storage (Program 45): Reset PV energy storage data.
- Start/Stop Charging Time for AC Charger (Programs 46/47): Schedule AC charger operation.
- Scheduled Time for AC Output On/Off (Programs 48/49): Schedule AC output operation.
- Set Country Customized Regulations (Program 50): Configure grid voltage and frequency ranges based on regional standards.
- Set Input Power of Mains Power (Program 58): Set the input power from the mains (0.01KW to 0.5KW).
- Max Battery Discharge Current Setting (Program 59): Set the maximum battery discharge current.
- Output Open Time (Program 67) & Output Stop Time (Program 68): Set the duration for output operation.
- Start/Stop Time Setting for Power Grid Peak Shaving (Programs 71/72): Configure peak shaving schedules.
5.2 Battery Equalization Description
The equalization function reverses the buildup of negative chemical effects like stratification, where acid concentration is greater at the bottom of the battery. It also helps to remove sulfate crystals that might have built up on the plates. If left unchecked, this condition, called sulfation, will reduce the overall capacity of the battery. Therefore, it's recommended to equalize the battery periodically.
5.3 CT Operation Guide
With a CT (Current Transformer) connected, the hybrid inverter can be easily integrated into an existing household system. This allows for self-consumption control via the CT to manage power generation and battery charging.
- Single Commissioning:
- Power off the inverter and connect the external CT. Ensure the current flow direction on the CT points to the inverter and the polarity on connecting CT wires (L+ to red wire, L- to black wire) is followed.
- Power on the inverter.
- Enter LCD setting on the inverter with CT sensor connected and set CT function to "PEC".

6. Maintenance
Regular maintenance ensures the longevity and optimal performance of your inverter. While specific maintenance instructions are not detailed, general best practices include:
- Keep the inverter clean and free from dust and debris.
- Ensure proper ventilation around the unit to prevent overheating.
- Periodically check all wiring connections for tightness and signs of wear or corrosion.
- Follow battery manufacturer guidelines for maintenance and replacement.
- If any issues arise, refer to the troubleshooting section or contact qualified service personnel.
7. Troubleshooting
This section provides solutions to common problems. If the issue persists after following these steps, please contact qualified service personnel.
7.1 Fault Codes and Alarm Descriptions
The inverter enters fault mode when the red LED light is always on and the LCD displays a fault code. Alarm conditions are indicated by a flashing red LED and an alarm code on the LCD.
| Fault Code | Fault Event | Explanation/Possible Cause | What to Do |
|---|---|---|---|
| F01 | Fan is locked when inverter is off. | Return to repair center. | |
| F02 | Over temperature or NTC is not connected well. | Temperature internal converter component is over 120°C. | Check whether the air flow of the unit is blocked or whether the ambient temperature is too high. |
| F03 | Battery voltage is too high. | Battery is over-charged. | Check if spec and quantity of batteries meet requirements. |
| F04 | Battery voltage is too low. | The battery voltage is too low (<1.91V/Cell). | Re-charge battery. Replace battery. |
| F05 | Output short circuited or over temperature is detected by internal converter components. | Output short circuited. | Check if wiring is connected well and remove abnormal load. |
| F06 | Output voltage is too high. | Return to repair center. | |
| F07 | Overload time out. | The inverter is overloaded (105%) and time is up. | Reduce the connected load by switching off some equipment. |
| F08/F09/F53/F57 | Bus voltage is too high/Bus soft start failed/Inverter soft start failed/Current sensor failed. | Internal components failed. | Return to repair center. |
| F51 | Over currents or surge. | Restart the unit. If the error happens again, please return to repair center. | |
| F59 | PV input voltage is over limitation. | PV input voltage is beyond the specification. | Reduce the number of PV modules in series. |
| Alarm Code | Alarm Event | Audible Alarm | Icon Flashing |
|---|---|---|---|
| A01 | Fan is locked when inverter is on. | Beep three times every second | A01 |
| A02 | Over temperature | None | A02 |
| A03 | Battery is over-charged | Beep once every second | A03 |
| A04 | Low battery | Beep once every second | A04 |
| A07 | Overload | Beep once every 0.5 second | A07 |
| A10 | Output power derating | Beep twice every 3 seconds | A10 |
| A15 | PV energy is low. | Beep twice every 3 seconds | A15 |
| A16 | High AC input (>280VAC) during BUS soft start | None | A16 |
| A27 | Max battery discharge current setting | None | A27 |
| E9 | Battery equalization | None | E9 |
| 6P | Battery is not connected | None | 6P |
| Code | Description |
|---|---|
| 60 ▲ | If battery status is not allowed to charge and discharge after communication between inverter and battery is successful, it will show code 60 to stop charging and discharging battery. |
| 61 ▲ | Communication lost. After battery is connected, communication signal is not detected for 1 minute, buzzer will beep. Communication lost occurs after the inverter and battery is connected successfully, buzzer beeps immediately. |
| 69 ▲ | If battery status is not allowed to charge after communication between inverter and battery is successful, it will show code 69 to stop charging battery. |
| 70 ▲ | If battery status must to charge after communication between inverter and battery is successful, it will show code 70 to charge battery. |
| 71 ▲ | If battery status is not allowed to discharge after communication between inverter and battery is successful, it will show code 71 to stop discharge battery. |
8. Specifications
| Attribute | Value |
|---|---|
| Brand Name | DATOUBOSS |
| Model Number | DT-48V6.2KW-S/SQ-A |
| Rated Power | 6200W |
| Peak Power | 12400VA |
| Output Voltage | AC 220V±10% (220/230/240VAC ± 5%) |
| Output Frequency | 50/60Hz |
| Waveform | Pure Sine Wave |
| Input Voltage | 20V-109V |
| Feed-in Grid Voltage Range | 100-280VAC |
| Nominal Output Current | 26.9A |
| Power Factor | > 0.99 |
| Conversion Efficiency | 0.9 (Max 98%) |
| Battery Voltage | 48Vdc |
| Max PV Input Power | 8500W |
| MPPT Tracking Range | 360-430V |
| Max PV Input Voltage | 500Vdc |
| Max PV Input Current | 27A |
| Max PV Charging Current | 120A |
| Max AC Charging Current | 100A |
| Max Charging Current | 120A |
| Operating Temperature | -10-50 °C |
| Storage Temperature | -15-60 °C |
| Noise | ≤ 50dB |
| Size (L*W*H) | 44.03*30.9*12.55 cm |
| Weight | 8.85KG |
| Certification | CE, FCC, RoHS, pse, weee |
9. User Tips
- Zero Export Control: For advanced grid-tie applications requiring zero export control on a 3-phase grid, consider using an SDM630 energy meter via RS485. The DT4862SQ model with a built-in anti-backflow sensor and CT current sensor is specifically designed to comply with grid standards and enable accurate control over grid power interaction.
- Battery Compatibility: This inverter is compatible with various battery types, including lead-acid (AGM/Flooded) and third-party lithium batteries. Ensure you select the correct battery type in the LCD settings (Program 05) for optimal performance and safety.
- Overload Protection: The inverter features graded overload protection. If an overload occurs, reduce the connected load by switching off some equipment to prevent damage and ensure continuous operation.
10. Warranty and Support
This product comes with an official warranty. For any technical support, warranty claims, or service inquiries, please contact the DATOUBOSS Poland Flagship Store or your local dealer. Refer to the contact information provided with your purchase for assistance.