ANENJI ANJ-6200W-48V-W

Contents

ANENJI Hybrid Solar Inverter User Manual

Model: ANJ-6200W-48V-W

Brand: ANENJI

1. Introduction

This manual provides essential information for the installation, operation, and maintenance of your ANENJI ANJ-6200W-48V-W Hybrid Solar Inverter. This advanced inverter is designed to efficiently convert DC power from solar panels into AC power for your home or business, offering both on-grid and off-grid capabilities. It features a built-in MPPT solar charge controller, pure sine wave output, and smart app management via Wi-Fi.

Key Features:

  • Supports operation without batteries.
  • Lithium battery activation function.
  • Wide PV input voltage range: 60-500VDC.
  • Integrated 120A MPPT solar charge controller.
  • Wi-Fi APP for remote monitoring and control.
  • RS485 Communication interface.
  • Compatible with PACE PYLON Growatt communication protocols BMS.
  • Dual AC output.
  • Multiple Output Priority options (UTL, SOL, SBU, SUB, SUF EQ) for optimized battery performance.

2. Safety Instructions

WARNING: Shock Hazard!

  • Installation must be performed by qualified personnel with care due to high battery voltage in series.
  • Do not place anything between the flat part of the inverter terminal; overheating may occur.
  • Do not apply anti-oxidant substance on the terminals before terminals are connected tightly.
  • Before making the final DC connection or closing DC breaker/disconnector, ensure positive (+) is connected to positive (+) and negative (-) to negative (-).
  • Ensure all wiring is performed by qualified personnel.
  • Always disconnect AC power source before attempting to hardwire the unit.
  • Do not mount the inverter on flammable construction materials.

3. Package Contents

Upon unpacking, please verify that all items are present and undamaged:

  • Hybrid Solar Inverter Unit (x1)
  • User Manual (x1)
  • Wi-Fi Module (x1)

4. Product Overview

The ANENJI ANJ-6200W-48V-W is a robust hybrid solar inverter designed for versatile energy management. Below are the key components and interfaces:

ANENJI Hybrid Solar Inverter Front and Bottom Panel Overview

Figure 4.1: Inverter Front and Bottom Panel Overview

4.1. Front Panel Components

  1. LCD display
  2. Status indicator
  3. Charging indicator
  4. Fault indicator
  5. Function buttons
  6. Power on/off switch

4.2. Bottom Panel Connections

  1. AC input
  2. AC output
  3. PV input
  4. Battery input
  5. RS232 communication port
  6. RS485 communication port
  7. Wire outlet hole
  8. Grounding
Inverter Product Label with Specifications

Figure 4.2: Inverter Product Label

Product Label Details:
Model: ANJ-6200W-48V-W
Operating Temperature Range: -10~55°C
Inverter Mode: Rated Power: 6200VA/6200W, DC Input: 48VDC, 130A, AC Output: 230VAC, 50/60Hz, 27A, 1Φ
AC Charger Mode: AC Input: 230VAC, 50/60Hz, 50A, 1Φ, DC Output: 54VDC, Max. Charge Current (AC): 120A (Default 30A), Max. Charge Current (PV+AC): 120A, AC Output: 230VAC, 50/60Hz, 27A, 1Φ
Solar Charger Mode: Max. PV Array Power: 9000W, Min. Solar Voltage: 60VDC, Max. Solar Voltage (VOC): 500VDC, Max. Solar Current: 27A, Max. Charge Current: 120A
RoHS Compliant, CE, IP21 (indoor use), MADE IN CHINA.

5. Setup and Installation

5.1. Unpacking and Inspection

Before installation, carefully inspect the unit for any damage incurred during transit. Ensure all components listed in Section 3 are present.

5.2. Preparation

Before connecting any wiring, remove the bottom cover of the inverter by unscrewing the two retaining screws.

5.3. Mounting the Unit

Consider the following points when selecting a mounting location:

  • Do not mount on flammable construction materials.
  • Mount on a solid, non-combustible surface (e.g., concrete).
  • Install at eye level for easy LCD display readability.
  • Ambient temperature should be between 0°C and 55°C for optimal operation.
  • Mount vertically on the wall.
  • Ensure adequate clearance for heat dissipation and wiring access.
Inverter Mounting Dimensions and Clearances

Figure 5.1: Recommended Mounting Clearances
Ensure at least 50cm clearance above and below, and 20cm on each side.

Secure the unit to the wall using three M4 or M5 screws.

5.4. Battery Connection

CAUTION:

  • Install a separate DC over-current protector or disconnect device between the battery and inverter.
  • Use appropriate cable sizes to prevent injury and ensure efficient operation.
ModelMax. AmperageBattery CapacityWire SizeCable mm²L1 (mm)L2 (mm)Torque Value
1500W-2470A100AH6AWG13.33182~3 Nm
2500W-24100A100AH4AWG21.153182~3 Nm
Other Models137A100AH2AWG383182~3 Nm

Connection Steps:

  1. Remove 18mm of insulation from positive and negative battery cables.
  2. Connect all battery packs as required.
  3. Insert battery cables into the inverter's battery connector, ensuring correct polarity and tightening bolts to 2-3 Nm.

5.5. AC Input/Output Connection

CAUTION:

  • Install a separate AC breaker (recommended 50A) between the inverter and the AC input source.
  • Do not mis-connect input and output connectors.
ModelGaugeTorque Value
1.5KVA12AWG1.4~1.6Nm
2.5KVA/3.5KVA10AWG1.4~1.6Nm
5.5KVA/6.2KVA8 AWG1.4~1.6Nm

Connection Steps:

  1. Open DC protector or disconnector.
  2. Remove 10mm of insulation from AC input/output conductors.
  3. Insert AC input wires (Ground: yellow-green, L: brown/black, N: blue) according to polarities and tighten screws. Connect PE protective conductor first.
  4. Insert AC output wires (Ground: yellow-green, L: brown/black, N: blue) according to polarities and tighten screws. Connect PE protective conductor first.
  5. Ensure all wires are securely connected.

5.6. PV Connection

CAUTION:

  • Install a DC circuit breaker between PV modules and the inverter.
  • Use appropriate cable sizes for PV module connection.
ModelTypical AmperageCable SizeTorque
1.5KVA15A12 AWG1.4~1.6 Nm
2.5KVA15A12 AWG1.4~1.6 Nm
3.5KVA15A12 AWG1.4~1.6 Nm
5.5KVA18A12 AWG1.4~1.6 Nm
6.2KVA27A12 AWG1.4~1.6 Nm

PV Module Selection Considerations:

  • Open circuit Voltage (Voc) of PV modules must not exceed the inverter's max. PV array open circuit voltage (500VDC).
  • Open circuit Voltage (Voc) of PV modules should be higher than the minimum battery voltage.

Connection Steps:

  1. Remove 10mm of insulation from positive and negative PV conductors.
  2. Check correct polarity from PV modules and PV input connectors.
  3. Connect positive (+) cable to positive (+) PV input connector, and negative (-) cable to negative (-) PV input connector.
  4. Ensure wires are securely connected.
PV Module Connection Diagram and Selection Table

Figure 5.2: PV Module Connection and Selection Guide

5.7. Final Assembly

After all wiring is complete, reattach the bottom cover of the inverter using the two screws.

6. Operating Instructions

6.1. Power ON/OFF

Once the unit is properly installed and batteries are connected, press the On/Off switch (located on the bottom of the case) to power on the unit.

6.2. Operation and Display Panel

The front panel features an LCD display, three LED indicators, and four function keys to monitor and control the inverter.

LED IndicatorColorStatusMessage
AC/INVGreenSolid On
Flashing
Output powered by utility (Line mode)
Output powered by battery or PV (Battery mode)
CHGGreenSolid On
Flashing
Battery fully charged
Battery is charging
▲ FAULTRedSolid On
Flashing
Fault occurs
Warning condition occurs
Function KeyDescription
ESCTo exit setting mode
UPTo go to previous selection
DOWNTo go to next selection
ENTERTo confirm selection or enter setting mode

6.3. LCD Setting

Press and hold the ENTER button for 3 seconds to enter setting mode. Use UP/DOWN to select programs, and ENTER to confirm or ESC to exit.

Detailed LCD setting programs are available in the PDF manual (pages 12-18).

6.4. Battery Equalization

The equalization function reverses negative chemical effects like stratification and removes sulfate crystals, extending battery life. It is recommended to equalize batteries periodically.

How to Apply: Enable battery equalization in LCD setting program 33. Then, either set the equalization interval in program 37 or activate immediately in program 39.

When to Equalize: The inverter enters the Equalize stage when the set interval is reached or immediately activated.

Charging Time and Timeout: During equalization, the inverter charges the battery until it reaches the equalization voltage, then maintains this voltage. If the battery voltage remains low after the equalized timeout, the inverter stops equalization and returns to float stage.

6.5. Setting for Lithium Battery

If using a lithium battery, ensure it is compatible with the inverter. Connect the battery's RS485 port to the inverter's BMS(RS485) communication port. The communication cable is typically included.

Lithium Battery Communication and Setting:

  • Re-configure charging voltage, current, and discharge cut-off voltage according to battery parameters.
  • The inverter will start/stop charging based on the lithium battery status.

LCD Setting for Lithium Battery:

  1. Select program 05 as lithium battery type.
  2. Confirm programs 41/42/43/44/45 settings.

Detailed settings for PYLON US2000 lithium batteries and settings for lithium batteries without communication are available in the PDF manual (pages 23-24).

7. Maintenance

  • Regularly inspect all wiring connections for tightness and signs of corrosion.
  • Keep the inverter's ventilation openings clear of dust and debris to ensure proper cooling.
  • Clean the exterior of the inverter with a dry, soft cloth. Do not use liquid cleaners.
  • Periodically check battery terminals for corrosion and clean if necessary.

8. Troubleshooting

8.1. Fault Reference Code

The inverter displays specific codes for various faults:

Fault CodeFault Event
01Over temperature of inverter module
02Over temperature of DCDC module
03Battery voltage is too high
04Over temperature of PV module
05Output short circuited.
06Output voltage is too high.
07Overload time out
08Bus voltage is too high
09Bus soft start failed
10PV over current
11PV over voltage
12DCDC over current
13Over current or surge
14Bus voltage is too low
15Inverter failed (Self-checking)
18Op current offset is too high
19Inverter current offset is too high
20DC/DC current offset is too high
21PV current offset is too high
22Output voltage is too low
23Inverter negative power

8.2. Warning Indicator

The inverter provides visual and audible warnings for various conditions:

Warning CodeWarning EventAudible Alarm
02Temperature is too HighBeep three times every second
04Low batteryBeep once every second
07OverloadBeep once every 0.5 second
10Output power deratingBeep twice every 3 seconds
14Fan blockedNone
15PV energy is lowBeep twice every 3 seconds
19Lithium Battery communication is failedBeep once every 0.5 second
21Lithium Battery over currentNone
E9Battery equalizationNone
bPBattery is not connectedNone

8.3. Troubleshooting Table

ProblemExplanation / Possible CauseWhat to do
Unit shuts down automatically during startupBattery voltage is too low1. Re-charge battery.
2. Replace battery.
No response after power on.1. Battery voltage is far too low.
2. Battery polarity is reversed.
1. Check battery/wiring.
2. Re-charge battery.
3. Replace battery.
Mains exist but unit works in battery mode.Insufficient quality of AC power.1. Check AC wires.
2. Check generator.
When unit is on, internal relay switches on/off repeatedly.Battery is disconnected.Check battery wires.
Fault code 07Overload error.Reduce connected load.
Fault code 05Output short circuited.Check wiring, remove abnormal load.
Fault code 02Internal temperature over 100°C.Check airflow, ambient temperature.
Buzzer beeps continuously, red LED on.Battery is over-charged.Return to repair center.
Fault code 13 / 14Over current / surge or Bus voltage too low.Restart unit, if error persists, return to repair center.

9. Specifications

9.1. Line Mode Specifications

ParameterValue
Input Voltage WaveformSinusoidal (utility or generator)
Nominal Input Voltage230Vac
Low Loss Voltage170Vac±7V (UPS); 90Vac±7V (Appliances)
High Loss Voltage280Vac±7V
Max AC Input Voltage300Vac
Nominal Input Frequency50Hz / 60Hz (Auto detection)
Efficiency (Line Mode)>95% (Rated R load, battery full charged)
Transfer Time10ms typical (UPS); 20ms typical (Appliances)

9.2. Inverter Mode Specifications

ParameterValue
Rated Output Power6.2KVA / 6.2KW
Output Voltage WaveformPure Sine Wave
Output Voltage Regulation230Vac±5%
Output Frequency50Hz or 60Hz
Peak Efficiency94%
Surge Capacity2* rated power for 5 seconds
Nominal DC Input Voltage48Vdc
Cold Start Voltage46.0Vdc

9.3. Charge Mode Specifications

ParameterValue
Max Charging Current (PV+AC)120Amp
Max Charging Current (AC)80Amp
Bulk Charging Voltage (Flooded)58.4Vdc
Bulk Charging Voltage (AGM / Gel)56.4Vdc
Floating Charging Voltage54Vdc
Overcharge Protection63Vdc
Charging Algorithm3-Step
Max. PV Array Open Circuit Voltage500Vdc
PV Array MPPT Voltage Range60Vdc~500Vdc
Max. Input Current27A
Max. Charging Current (PV)120A

9.4. General Specifications

ParameterValue
Operating Temperature Range-10°C to 55°C
Storage Temperature-15°C~60°C
Humidity5% to 95% Relative Humidity (Non-condensing)
Dimension (D*W*H), mm438x295x105
Net Weight, kg8.7

10. User Tips

  • Careful Installation: Ensure all connections (battery, AC, PV) are secure and correctly polarized to prevent issues and ensure optimal performance.
  • Check Instructions: The provided instructions are comprehensive; review them thoroughly before and during installation.
  • Dual Grid Capability: This inverter supports both on-grid and off-grid operations, offering flexibility for various power setups.
  • Monitor Performance: Utilize the Wi-Fi app for real-time monitoring of the inverter's operating status to ensure efficient energy management.

11. Warranty and Support

For warranty information, technical support, or service inquiries, please contact your authorized dealer or the manufacturer's customer service. Keep your purchase receipt as proof of purchase.

© 2023 ANENJI. All rights reserved.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.