1. About This Manual
This manual provides essential information for the assembly, installation, operation, and troubleshooting of your ANENJI Hybrid Solar Inverter. Please read it carefully before installation and operation, and keep it for future reference.
1.1. Scope
This manual includes safety and installation guidelines, as well as detailed information on tools and wiring procedures.
2. Safety Instructions
WARNING: This chapter contains important safety and operating instructions. Read and keep this manual for future reference.
- Before using the unit, read all instructions and cautionary markings on the unit, the batteries, and all appropriate sections of this manual.
- CAUTION – To reduce risk of injury, charge only deep-cycle lead-acid type rechargeable batteries. Other types of batteries may burst, causing personal injury and damage.
- Do not disassemble the unit. Take it to a qualified service center when service or repair is required. Incorrect re-assembly may result in a risk of electric shock or fire.
- To reduce risk of electric shock, disconnect all wiring before attempting any maintenance or cleaning. Turning off the unit will not reduce this risk.
- CAUTION – Only qualified personnel can install this device with battery.
- NEVER charge a frozen battery.
- For optimum operation of this inverter/charger, please follow required specifications to select appropriate cable size. It's very important to correctly operate this inverter/charger.
- Be very cautious when working with metal tools on or around batteries. A potential risk exists to drop a tool to spark or short circuit batteries or other electrical parts and could cause an an explosion.
- Please strictly follow installation procedures when you want to disconnect AC or DC terminals. Please refer to the INSTALLATION section of this manual for details.
- Fuse is provided as over-current protection for the battery supply.
- GROUNDING INSTRUCTIONS - This inverter/charger should be connected to a permanent grounded wiring system. Be sure to comply with local requirements and regulations to install this inverter.
- NEVER cause AC output and DC input short-circuited. Do NOT connect to the mains when DC input short-circuits.
- Warning!! Only qualified service persons are able to service this device. If errors still persist after following the troubleshooting table, please send this inverter/charger back to a local dealer or service center for maintenance.
3. Product Overview
The ANENJI Hybrid Solar Inverter is designed for efficient energy management, offering pure sine wave output, MPPT solar charging, and compatibility with various battery types, including LiFePO4. It supports both on-grid and off-grid applications and features built-in WiFi for remote monitoring.
3.1. Key Features
- Pure Sine Wave Output: Delivers stable power suitable for all sensitive devices, ensuring smooth and safe operation for your electronics.
- Power Factor 1.0: Maximizes energy utilization and power transmission efficiency.
- Wide PV Input Voltage Range: Supports 60Vdc - 500Vdc, allowing for flexible solar panel connections.
- 100A/120A MPPT Controller: Integrates advanced Maximum Power Point Tracking technology to extract maximum power from solar panels.
- Lithium Battery Activation: Can be activated by mains or PV, ensuring efficient operation and maintenance of lithium batteries.
- LiFePO4 Battery Compatibility: Connects to LiFePO4 batteries via RS485 interface for longer lifespan and higher safety.
- Battery-Free Operation: Works normally even without a battery, ensuring continuous power supply.
- Detachable Dust Cover: Ideal for harsh environments, protecting the inverter from dust and debris.
- WiFi Remote Monitoring: Keep track of your system's status and control it remotely for added convenience.
- Multiple Output Priority Support: Configure output priority (UTL, SOL, SBU, SUB) for flexible power management.
- Battery Optimization Function (EQ): Improves battery performance and extends its lifecycle.
3.2. Inverter Components
The inverter features an intuitive display and various connection ports for comprehensive system integration.

Front and side view of the inverter, highlighting LCD display, status/charging/fault indicators, function buttons, power switch, AC/PV/Battery inputs, RS485, grounding, and built-in WiFi.

Detailed product overview showing all ports and indicators on the front and bottom of the inverter.
- LCD display
- Status indicator
- Charging indicator
- Fault indicator
- Function buttons
- Power on/off switch
- AC input
- AC output
- PV input
- Battery input
- RS485 communication port
- Grounding
- Built-In WiFi
4. Setup and Installation
4.1. Unpacking and Inspection
Before installation, carefully inspect the unit for any damage. The package should contain:
- The inverter unit (x1)
- User manual (x1)
4.2. Preparation
Before connecting any wiring, remove the bottom cover by unscrewing the two screws as shown in the product overview diagram.
4.3. Mounting the Unit
Consider the following points when selecting an installation location:
- Do not mount the inverter on flammable construction materials.
- Mount on a solid surface.
- Install this inverter at eye level for easy readability of the LCD display.
- The ambient temperature should be between 0°C and 55°C for optimal operation.
- The recommended installation position is vertically on the wall.
- Ensure sufficient heat dissipation and space for wiring by maintaining clearances as shown in the diagram.

Diagram showing recommended clearances for mounting the inverter unit (50cm top/bottom, 20cm sides).
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
4.4. Battery Connection
For safety and compliance, install a separate DC over-current protector or disconnect device between the battery and inverter. Use appropriate cable sizes as specified below.
WARNING! All wiring must be performed by qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable.
Recommended Battery Cable & Terminal Size:
| Model | Maximum Amperage | Battery Capacity | Wire Size | Cable mm² | Terminal Size (mm) L x W x D | Torque Value |
|---|---|---|---|---|---|---|
| 4.2KVA | 175A | 200AH | 1AWG | 50 | 37 x 15.3 x 6.4 | 4~6 Nm |
| 6.2KVA | 130A | 200AH | 2AWG | 35 | 37 x 15.3 x 6.4 | 4~6 Nm |
Steps for Battery Connection:
- Prepare positive and negative cables according to the recommended terminal size.
- Connect all battery packs as required. It's suggested to use recommended battery capacity.
- Insert battery cable flatly into the battery connector of the inverter and ensure the bolts are tightened with a torque of 4~6Nm. Verify correct polarity at both the battery and the inverter/charger, and ensure battery cables are tightly screwed to the battery connector.

Battery connection diagram for 4.2KW model (24VDC system, 100Ah capacity battery).

Battery connection diagram for 6.2KW model (48VDC system, 200Ah capacity battery).
4.5. AC Input/Output Connection
CAUTION!! Before connecting to AC input power source, install a separate AC breaker between the inverter and the AC input power source. This ensures the inverter can be securely disconnected during maintenance and is protected from over-current. The recommended AC breaker spec is 50A.
CAUTION!! There are two terminal blocks with “IN” and “OUT” markings. Do NOT mis-connect input and output connectors.
WARNING! All wiring must be performed by qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for AC input connection. To reduce risk of injury, please use the proper recommended cable size as below.
Suggested Cable Requirement for AC Wires:
| Model | Gauge | Torque Value |
|---|---|---|
| 4.2KVA | 10AWG | 1.4~1.6 Nm |
| 6.2KVA | 10AWG | 1.4~1.6 Nm |
Steps for AC Input/Output Connection:
- Before making AC input/output connections, ensure the DC protector or disconnector is open.
- Remove 10mm of insulation sleeve for six conductors. Shorten phase L and neutral conductor N by 3mm.
- Insert AC input wires according to the polarities indicated on the terminal block and tighten the terminal screws. Ensure the PE protective conductor (yellow-green) is connected first.
- Insert AC output wires according to the polarities indicated on the terminal block and tighten the terminal screws. Ensure the PE protective conductor (yellow-green) is connected first.
WARNING: Ensure the AC power source is disconnected before attempting to hardwire it to the unit.
The inverter is equipped with dual outputs. There are four terminals (main out-L/N, second out-L/N) available on the output port. The second output can be turned on and off via LCD program 43. Refer to the "LCD Setting" section for details in programs 29 and 31.
- The main output typically handles heavy loads (e.g., air-conditioners, heaters, motors).
- The second output typically handles light loads (e.g., lights, computers, fans).
- Normally, the cutoff point of the second output is lower than the main output, ensuring light loads are not cut off.
4.6. PV Connection
CAUTION: Before connecting to PV modules, install a separate DC circuit breaker between the inverter and PV modules.
WARNING! All wiring must be performed by qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the proper recommended cable size as below.
Suggested Cable Requirement for PV Wires:
| Model | Typical Amperage | Cable Size | Torque |
|---|---|---|---|
| 4.2KVA | 27A | 10 AWG | 1.4~1.6 Nm |
| 6.2KVA | 27A | 10 AWG | 1.4~1.6 Nm |
PV Module Selection:
When selecting PV modules, consider the following parameters:
- Open circuit Voltage (Voc) of PV modules must not exceed the maximum PV array open circuit voltage of the inverter.
- Open circuit Voltage (Voc) of PV modules should be higher than the minimum battery voltage.
Solar Charging Mode Specifications:
| INVERTER MODEL | 4.2KVA | 6.2KVA |
|---|---|---|
| Max. PV Array Open Circuit Voltage | 500VDC | |
| PV Array MPPT Voltage Range | 60VDC~500VDC | |
| Max. PV INPUT CURRENT | 27A | |
Steps for PV Module Wire Connection:
- Remove 6mm of insulation sleeve for positive and negative conductors.
- Check the correct polarity of the connection cable from PV modules and PV input connectors. Connect the positive pole (+) of the connection cable to the positive pole (+) of the PV input connector, and the negative pole (-) to the negative pole (-).
- Ensure the wires are securely connected.

Wiring diagram for 4.2KW 24V model showing connections to solar panels, generator/utility, battery, and home appliances.

Inverter System Configuration for 6.2KW 48V model, showing connections to solar panels, generator, utility grid, battery, and household appliances.
4.7. Final Assembly
After connecting all wiring, reinstall the bottom cover by screwing in the three screws.
5. Operation
5.1. Power ON/OFF
Once the unit is properly installed and batteries are connected, simply press the On/Off switch (located on the bottom of the case) to turn on the unit.
Video: ANJ-6200W-48V-WIFI Solar Inverter Wiring Guide, demonstrating the connection of AC output, battery, and turning on the inverter.
5.2. Operation and Display Panel
The front panel of the inverter includes an LCD display, three indicators, and four function keys to show operating status and input/output power information.
LED Indicators:
| LED Indicator | Color | Status | Message |
|---|---|---|---|
| AC/INV | Green | Solid On | Output is powered by utility in Line mode. |
| Flashing | Output is powered by battery or PV in battery mode. | ||
| CHG | Green | Solid On | Battery is fully charged. |
| Flashing | Battery is charging. | ||
| FAULT | Red | Solid On | Fault occurs in the inverter. |
| Flashing | Warning condition occurs in the inverter. |
Function Keys:
| Function Key | Description |
|---|---|
| ESC | To exit setting mode |
| UP | To go to previous selection |
| DOWN | To go to next selection |
| ENTER | To confirm the selection in setting mode or enter setting mode |
5.3. LCD Setting
Press and hold the ENTER button for 3 seconds to enter setting mode. Use UP/DOWN buttons to select programs and ENTER to confirm, or ESC to exit.
Key LCD Settings:
- Program 01: Output source priority (Utility first, Solar first, SBU priority, SUB priority, SUF priority)
- Program 02: Maximum charging current (60A default)
- Program 03: AC input voltage range (Appliances, UPS, Generator)
- Program 05: Battery type (AGM, Flooded, User-Defined, LI2, LI4, LIB)
- Program 06: Auto restart when overload occurs (Restart disable/enable)
- Program 07: Auto restart when over temperature occurs (Restart disable/enable)
- Program 08: Output voltage (220V, 230V, 240V)
- Program 09: Output frequency (50Hz, 60Hz)
- Program 10: Auto bypass (Manual/Auto)
- Program 11: Maximum utility charging current (30A default)
- Program 12: Setting voltage or SOC percentage back to utility source (for SBU priority or Solar first)
- Program 13: Setting voltage or SOC percentage back to battery mode (for SBU priority or Solar first)
- Program 16: Charger source priority (Solar first, Solar and Utility, Only Solar)
- Program 18: Buzzer mode (Mode1-4)
- Program 19: Auto return to default display screen (Return to default display screen, Stay at latest screen)
- Program 20: Backlight control (Backlight on/off)
- Program 23: Overload bypass (Bypass disable/enable)
- Program 25: Modbus ID Setting (001-247)
- Program 26: Bulk charging voltage (C.V voltage)
- Program 27: Floating charging voltage
- Program 29: Setting cut off voltage point or SOC percentage on the second output (OP2)
- Program 31: Setting cut off voltage point or SOC percentage on the Main output (OP1)
- Program 32: Bulk charging time (C.V stage) (Automatically, 5 min - 900 min)
- Program 33: Battery equalization (Battery equalization, Battery equalization disable)
- Program 34: Battery equalization voltage
- Program 35: Battery equalized time (60min default)
- Program 36: Battery equalized timeout (120min default)
- Program 37: Equalization interval (30 days default)
- Program 39: Equalization activated immediately (Enable/Disable)
- Program 41: Automatic activation for lithium battery (Auto/Disable)
- Program 42: Manual activation for lithium battery (Activation)
- Program 43: OP2 Output Enable (Enable/Disable)
- Program 46: Maximum discharge current protection (20A to 500A)
- Program 47: Setting the OP2 overload warning point (10% to 100%, 50% default)
- Program 50: Lithium battery activation time (6s-300s, 6s default)
5.4. Battery Equalization
Equalization reverses the buildup of negative chemical effects like stratification and removes sulfate crystals, extending battery life. It is recommended to equalize batteries periodically.
How to Apply Equalization Function:
- Enable battery equalization in LCD setting program 33.
- Apply the function by either setting the equalization interval in program 37 or activating equalization immediately in program 39.
When to Equalize:
In float stage, when the set equalization interval is reached or equalization is actively initiated, the controller will enter the Equalize stage.

Battery Equalization Voltage and Float Voltage Graph.
Equalize Charging Time and Timeout:
During the Equalize stage, the controller charges the battery until it reaches the equalization voltage. Constant-voltage regulation maintains this voltage. The battery remains in this stage until the set equalized time is reached. If the battery voltage doesn't rise to the equalization voltage point within the set time, the charge controller extends the equalized time. If the voltage is still low after the timeout, equalization stops, and the system returns to float stage.
5.5. Setting for Lithium Battery
If using a lithium battery, ensure it is a compatible type. There are two connectors on the lithium battery: RS485 port of BMS and power cable.
Steps for Lithium Battery Connection:
- Assemble battery terminals based on recommended battery cable and terminal size (refer to Lead-acid Battery connection details).
- Connect the RS485 port of the battery to the BMS (RS485) communication port of the inverter.
Make sure the lithium battery RS485 port connects to the inverter is Pin to Pin. The inverter RS485 port pin assignment is as follows:
| Pin Number | RS485 Port |
|---|---|
| PIN1 | RS485-B |
| PIN2 | RS485-A |
| PIN7 | RS485-A |
| PIN8 | RS485-B |
Lithium Battery Communication and Setting:
If using a lithium battery, connect the BMS communication cable between the battery and the inverter. This cable transmits information and signals, allowing the inverter to:
- Re-configure charging voltage, charging current, and battery discharge cut-off voltage based on lithium battery parameters.
- Have the inverter start or stop charging according to the status of the lithium battery.
LCD Setting for Lithium Battery:
- Select program 05 as lithium battery type.
- Confirm program 12/13/29/31/41/42 setting values.
Note: Programs 43/44/45 are only available with successful communication and will replace programs 12/13/29. At the same time, programs 12/13/29 become unavailable.
If communication between the inverter and battery is successful, the LCD will display specific information, including a "Li" icon for communication success, max charging voltage/current, and battery SOC (%).
Setting for PYLON US2000 Lithium Battery:
PYLONTECH US2000 lithium batteries use 4 Dip Switches to set baud rate and battery group address. Switch position "ON" means "1", and "OFF" means "0". Dip 1 is "ON" for baud rate 9600. Dips 2, 3, and 4 are reserved for battery group address.
Process of Install:
- Use the RS485 cable to connect the inverter and Lithium battery.
- Switch on the Lithium battery.
- Press and hold for more than three seconds to start the Lithium battery; power output ready.
- Turn on the inverter.
- Ensure battery type "Li2" is selected in LCD program 5. If communication is successful, the battery icon "Li" on the LCD display will light up.
Setting for Lithium Battery Without Communication:
This suggestion is for lithium battery applications to avoid BMS protection without communication. Finish the setting as follows:
Recommended method 1: Set battery type as “LIB” in program 05.
Recommended method 2: Setting as follows:
- Before starting, obtain the battery BMS specification (Max charging voltage, Max charging current, Discharging protection voltage).
- Set battery type as "LIB" in program 05.
- Set C.V voltage as Max charging voltage of BMS-0.5V in program 26.
- Set floating charging voltage as C.V voltage in program 27.
- Set Low DC cut-off voltage ≥ discharging protection voltage in program 29.
- Set Max charging current in program 02, which must be less than the Max charging current of BMS.
- Set voltage point back to utility source when selecting "SBU priority" in program 12.
The setting value must be ≥ Low DC cut-off voltage + 2V, otherwise the inverter will show a warning for low battery voltage.
Remark:
- It is recommended to finish setting without turning on the inverter (just let the LCD show, no output).
- When setting is complete, restart the inverter.
6. Maintenance
Regular maintenance ensures the longevity and optimal performance of your ANENJI Hybrid Solar Inverter.
- Cleaning: Keep the inverter clean and free from dust. The detachable dust cover helps protect the internal components from harsh environments. Periodically clean the dust cover and ventilation openings to ensure proper airflow.
- Connection Checks: Regularly inspect all wiring connections (DC, AC, PV, Battery) to ensure they are tight and free from corrosion. Loose connections can lead to poor performance or safety hazards.
- Battery Health: Monitor battery voltage and perform battery equalization as recommended in the operation section to extend battery lifespan.
- Environmental Conditions: Ensure the inverter operates within the recommended ambient temperature range (0°C to 55°C) and humidity (5% to 95% Relative Humidity, non-condensing).
7. Troubleshooting
This section provides guidance on common issues and their solutions. For persistent problems, contact a qualified service person.
Fault Reference Code:
| Fault Code | Fault Event |
|---|---|
| 01 | Over temperature of inverter module |
| 02 | Over temperature of DCDC module |
| 03 | Battery voltage is too high |
| 04 | Over temperature of PV module |
| 05 | Output short circuited. |
| 06 | Output voltage is too high. |
| 07 | Overload time out |
| 08 | Bus voltage is too high |
| 09 | Bus soft start failed |
| 10 | PV over current |
| 11 | PV over voltage |
| 12 | DCDC over current |
| 13 | Over current or surge |
| 14 | Bus voltage is too low |
| 15 | Inverter failed (Self-checking) |
| 18 | Op current offset is too high |
| 19 | Inverter current offset is too high |
| 20 | DC/DC current offset is too high |
| 21 | PV current offset is too high |
| 22 | Output voltage is too low |
| 23 | Inverter negative power |
| 24 | Op2 current offset is too high |
Warning Indicator:
| Warning Code | Warning Event | Audible Alarm |
|---|---|---|
| 02 | Temperature is too High | Beep three times every second |
| 04 | Low battery | Beep once every second |
| 07 | Overload | Beep once every 0.5 second |
| 10 | Output power derating | Beep twice every 3 seconds |
| 14 | Fan blocked | None |
| 15 | PV energy is low | Beep twice every 3 seconds |
| 19 | Lithium Battery communication is failed | Beep once every 0.5 second |
| 21 | Lithium Battery over current | None |
| 22 | The load exceeds the set value of program 47 | None |
| E9 | Battery equalization | None |
| E8 | Battery is not connected | None |
8. Specifications
8.1. Table 1 Line Mode Specifications
| INVERTER MODEL | 4.2KVA | 6.2KVA |
|---|---|---|
| Input Voltage Waveform | Sinusoidal (utility or generator) | |
| Nominal Input Voltage | 230Vac | |
| Low Loss Voltage | 170Vac±7V (UPS); 90Vac±7V (Appliances) | |
| Low Loss Return Voltage | 180Vac±7V (UPS); 100Vac±7V (Appliances) | |
| High Loss Voltage | 280Vac±7V | |
| High Loss Return Voltage | 270Vac±7V | |
| Max AC Input Voltage | 300Vac | |
| Nominal Input Frequency | 50Hz / 60Hz (Auto detection) | |
| Low Loss Frequency | 40±1Hz | |
| Low Loss Return Frequency | 42±1Hz | |
| High Loss Frequency | 65±1Hz | |
| High Loss Return Frequency | 63±1Hz | |
| Output Short Circuit Protection | Battery mode: Electronic Circuits | |
| Efficiency (Line Mode) | >95% (Rated R load, battery full charged) | |
| Transfer Time | 10ms typical (UPS); 20ms typical (Appliances) | |
8.2. Table 2 Inverter Mode Specifications
| INVERTER MODEL | 4.2KVA | 6.2KVA |
|---|---|---|
| Rated Output Power | 4.2KVA / 4.2KW | 6.2KVA / 6.2KW |
| Dual output function | Yes | Yes |
| Max. main output power | 4.2KVA / 4.2KW | 6.2KVA / 6.2KW |
| Max. second output power | 4.2KVA / 4.2KW | 6.2KVA / 6.2KW |
| Output Voltage Waveform | Pure Sine Wave | |
| Output Voltage Regulation | 230Vac±5% | |
| Output Frequency | 50Hz or 60Hz | |
| Peak Efficiency | 94% | |
| Surge Capacity | 2* rated power for 5 seconds | |
| Nominal DC Input Voltage | 24Vdc | 48Vdc |
| Cold Start Voltage | 23.0Vdc | 46.0Vdc |
| Low DC Warning Voltage (Just for AGM and Flooded) | @ load < 20%: 22.0Vdc; @ 20% ≤ load < 50%: 21.4Vdc; @ load ≥ 50%: 20.2Vdc | @ load < 20%: 44.0Vdc; @ 20% ≤ load < 50%: 42.8Vdc; @ load ≥ 50%: 40.4Vdc |
| Low DC Warning Return Voltage (Just for AGM and Flooded) | @ load < 20%: 23.0Vdc; @ 20% ≤ load < 50%: 22.4Vdc; @ load ≥ 50%: 21.2Vdc | @ load < 20%: 46.0Vdc; @ 20% ≤ load < 50%: 44.8Vdc; @ load ≥ 50%: 42.4Vdc |
| Low DC Cut-off Voltage (Just for AGM and Flooded) | @ load < 20%: 21.0Vdc; @ 20% ≤ load < 50%: 20.4Vdc; @ load ≥ 50%: 19.2Vdc | @ load < 20%: 42.0Vdc; @ 20% ≤ load < 50%: 40.8Vdc; @ load ≥ 50%: 38.4Vdc |
8.3. Table 3 Charge Mode Specifications
| INVERTER MODEL | 4.2KVA | 6.2KVA |
|---|---|---|
| Max Charging Current (PV+AC) (@ VI/P=230Vac) | 120Amp | 120Amp |
| Max Charging Current (AC) (@ VI/P=230Vac) | 120Amp | 120Amp |
| Bulk Charging Voltage (Flooded Battery) | 29.2Vdc | 58.4Vdc |
| Bulk Charging Voltage (AGM / Gel Battery) | 28.2Vdc | 56.4Vdc |
| Floating Charging Voltage | 27Vdc | 54Vdc |
| Overcharge Protection | 32Vdc | 63Vdc |
| Battery reverse connection protection | No | No |
| Charging Algorithm | 3-Step | |
8.4. Table 4 General Specifications
| INVERTER MODEL | 4.2KVA | 6.2KVA |
|---|---|---|
| Operating Temperature Range | -10°C to 55°C | |
| Storage temperature | -15°C~60°C | |
| Humidity | 5% to 95% Relative Humidity (Non-condensing) | |
| Dimension (D*W*H), mm | 350x312x114 | |
| Net Weight, kg | 6.9 | 7.2 |
9. User Tips
- Battery-Free Operation: This inverter can function without batteries using direct solar or AC input, providing continuous power even if your battery system is not yet complete or requires maintenance.
- Remote Monitoring: Utilize the built-in WiFi module and the mobile app (Smart Ess, available on Google Play Store and App Store) for real-time monitoring of your inverter's operating status. This allows for convenient remote management without needing to check the LCD directly.
- LiFePO4 Battery Integration: For optimal performance and safety with LiFePO4 batteries, ensure proper RS485 communication cable connection and configure the inverter settings as described in the 'Setting for Lithium Battery' section.
- Parallel Connection (6.2KW model): The 6.2KW model supports parallel connection of up to 12 units. This feature allows for flexible expansion of power capacity for larger homes, farms, or commercial setups.
10. Warranty and Support
Your ANENJI Hybrid Solar Inverter comes with a 1-year warranty, ensuring peace of mind regarding product quality and performance.
For detailed guides and documents, please refer to the official user manual PDF available at: ANENJI User Manual (PDF).
If you encounter any issues that cannot be resolved using the troubleshooting guide, or if service/repair is required, please contact your local dealer or an authorized service center. Only qualified service personnel should attempt repairs to avoid electric shock or fire hazards.
