1. Introduction
The ANENJI MPPT Solar Charging Controller is a new-generation product developed with the latest photovoltaic technology. It is designed to maximize energy harvesting from solar arrays for efficient battery charging.
1.1 Key Features
- Excellent heat dissipation design with an intelligently controlled cooling fan.
- Innovative Maximum Power Point Tracking (MPPT) technology for up to 97% conversion efficiency.
- Rapid scanning of the entire I-V curve to track the maximum power point within seconds.
- Optional charging programs for various battery types: lead-acid (sealed, gel, open-type) and lithium battery series (note: 60A model does not support lithium batteries).
- Automatic protection functions against overcharging, over-discharging, overloading, and short circuits.
- RS485 communication interface for multi-device communication and monitoring (60A model does not have RS485 interface).
1.2 MPPT Technology Explained
MPPT controllers utilize Maximum Power Point Tracking to extract maximum power from solar arrays. This process is fully automatic and requires no user adjustment. When environmental conditions change, the controller automatically tracks the maximum power point, ensuring optimal energy harvest throughout the day.
If the maximum power point voltage (Vmp) of the solar array is higher than the battery voltage, the controller boosts the charging current proportionally. This current boost is crucial as the Vmp of solar panels is typically higher than the battery voltage in solar power generation systems.
Compared to traditional controllers, MPPT controllers operate the solar array at its maximum power point, which is usually higher than the battery voltage. This results in more energy harvested, especially when the nominal voltage of the photovoltaic modules is higher than the battery bank voltage.

ANENJI MPPT 100A Solar Controller highlighting maximum charging current, system voltage, three-stage charging, and automatic maximum power point tracking.

ANENJI MPPT 80A Solar Controller highlighting maximum charging current, system voltage, three-stage charging, and automatic maximum power point tracking.

ANENJI MPPT 60A Solar Controller highlighting maximum charging current, system voltage, three-stage charging, and automatic maximum power point tracking. Note: 60A controller cannot connect to lithium battery.
2. Safety Precautions
Please read all instructions and warning labels on the solar charge controller and in this manual before use.
Danger! Incorrect operation (e.g., high-voltage input) may pose a life-threatening risk. Always use a disconnect device for the solar panel array to prevent accidental power activation. Disconnect the circuit breaker and ensure it cannot be reconnected. Verify no voltage is present in the system before working.
Warning! Hot surface components. Install the device in an environment with good heat dissipation and ventilation. Do not touch the interior with bare hands after opening the controller's housing while it is in operation.
Warning! Radiation can harm health. Do not stay within 20 centimeters of the solar charge controller for extended periods.
Warning! Ensure the input DC voltage does not exceed the specified maximum voltage. Excessive voltage can permanently damage the solar controller and void the warranty.
Warning! Risk of Electric Shock! PV modules can generate extremely high voltage. Exercise caution to prevent electric shock when wiring.
Note: All work on the charge controller must be performed by technical personnel. This device must not be operated by children or persons with impaired physical/mental capabilities without supervision. Keep away from children.
Note: Before performing maintenance, cleaning, or working with circuit connections, technical personnel must follow relevant procedures.
- Use only parts and components recommended or sold by the manufacturer.
- To avoid fire and electric shock, ensure existing wiring is in good condition and of appropriate size. Do not operate if damaged.
- Do not disassemble or attempt to repair the controller yourself. This voids the warranty and can cause hazards.
- Keep away from flammable and explosive materials.
- Install away from damp or corrosive substances.
- Use insulated tools when operating to avoid short circuits.
3. Installation
Installation must be completed by professional technical personnel.
3.1 Selection of Installation Location
- Install on a solid surface.
- The location must be accessible at all times.
- The controller should be removable at any time.
- Ambient temperature should be between -20°C and 50°C for optimal operation.
- Never install in direct sunlight to avoid overheating and power loss.
- Avoid installing near flammable building materials or in areas with potential explosion hazards.
3.2 Safety Distance
Maintain the following clearances to ensure sufficient heat dissipation:
| Direction | Safety Distance |
|---|---|
| Side | 20 cm |
| High | 30 cm |
| Low | 30 cm |

Diagram illustrating recommended safety distances around the MPPT solar charge controller for proper ventilation and heat dissipation.
3.3 Wiring
The solar charging system consists of a solar panel, MPPT solar charge controller, and battery. Some models also include a DC load output.

A comprehensive wiring diagram showing the connection of a PV array, MPPT solar charge controller, battery, inverter, and AC loads. It also indicates the RS485 serial communication port.
3.3.1 Battery Connection
Connect the battery to the controller. Ensure correct polarity. The 60A, 80A, 100A, and 120A models have dedicated battery terminals. Models with DC Load (40A, 60A, 80A) have a DC load interface, while 100A and 120A models do not.
Note: When connecting the battery bank, ensure the circuit breaker is disconnected.
3.3.2 PV Module Connection
Connect the solar panels to the controller. Ensure the open-circuit voltage of the PV modules is within the operating range of the controller. The controller is compatible with 12V, 24V, and 48V off-grid solar modules. The voltage of the solar modules must not be lower than the system voltage.
Note: When connecting PV modules, ensure the circuit breaker is disconnected.
3.3.3 Cable Specifications and Circuit Breakers
Refer to the table below for recommended cable sizes and circuit breaker ratings:
| Model | 40A | 60A | 80A | 100A | 120A |
|---|---|---|---|---|---|
| Cable (Copper) | 10mm² | 16mm² | 16mm² | 25mm² | 25mm² |
| Circuit Breaker | 63A | 80A | 100A | 125A | 125A |
3.4 Power-On Test Run
Note: Before the power-on test run, verify that all DC connecting wires have their positive and negative poles connected correctly and completely.
- Check that the positive and negative poles of the connecting wires are fully and correctly connected. Measure the open-circuit voltage of the PV modules to ensure it is within the controller's operating range.
- First, turn on the circuit breaker connecting the controller to the battery.
- Then, turn on the circuit breaker connecting the controller to the solar panels.
- The controller will enter self-test mode. If system conditions are correct, it will automatically switch to working mode. If incorrect, a fault prompt will be displayed. Refer to the troubleshooting section.
- The factory default battery type is maintenance-free lead-acid batteries. Refer to the "Battery Type Setting" section for details if you are using a different battery type.
4. Operation
4.1 Panel Components
| Number | Name | Number | Name |
|---|---|---|---|
| 1 | LCD Display Screen | 5 | Junction Box Cover |
| 2 | Charging Indicator Light | 6 | Up Navigation Button |
| 3 | Function Menu Button | 7 | Confirm Button |
| 4 | Down Navigation Button | 8 | DC Output Indicator Light |

Product details for the 100A model, showing the LCD display, discharge outlet, line interface, and product parameter label.

Product details for the 80A model, showing the LCD display, discharge outlet, line interface, and product parameter label.

Product details for the 60A model, showing the LCD display, discharge outlet, line interface, and product parameter label.
4.2 LCD Display Screen
4.2.1 Main Interface
The main interface displays real-time system information such as PV module voltage, daily and total power generation, charging power, battery capacity indicator, battery voltage, and charging current.

LCD screen displaying PV voltage, power, MPPT status, battery voltage, current, and kWh generated/consumed.

LCD screen displaying system status including date, time, PV input, MPPT status, battery status, and energy statistics.

LCD screen displaying a graph of power generation over time.
4.2.2 Main Menu Navigation
From the default main interface, press the MENU key to enter the main menu. Use the DOWN or UP keys to navigate through submenus. Press ENTER to select an option.
Password Entry: To access operating parameter settings, you will be prompted for a password. The sequence is: Press the DOWN key 3 times, then press the UP key 3 times, and finally press the ENTER key.
Video demonstrating LCD screen navigation and password entry sequence.
4.2.3 Operating Parameter Settings
Warning! Operating parameter settings must be performed by professional technicians. Incorrect operations can cause malfunction or damage to the battery.
From the main menu, select "Operating Parameter Settings" and press ENTER. After entering the password, you can access the settings.
- Battery Type Setting: Select the battery type (maintenance-free lead-acid, gel, liquid, or lithium battery series). The factory default is maintenance-free lead-acid. The 60A controller does not support lithium batteries.
- Rated Battery Voltage Setting: Choose the rated voltage level (auto-detection, 12V, 24V, 36V, 48V...). Auto-detection applies only to lead-acid batteries. For lithium batteries or to set charging/discharge limits, the voltage level must be set manually.
- Charging Voltage Setting: Input the desired float and equalization charging voltages based on your battery manufacturer's recommendations.
- Charging Current Setting: Set the maximum charging current. The set value cannot exceed the controller's current maximum.
- Discharge Limit Settings: Set the cutoff and recovery voltages for the DC output.
- Restore Factory Settings: If the controller malfunctions due to incorrect parameter settings, you can restore factory settings.

LCD screen displaying the 'Charge Current Setting' menu, showing a maximum value of 100.0A and a set limit value of 65.0A.
4.2.4 Other Settings
- Time and Date Settings: Adjust the system time and date.
- Contrast Settings: Adjust the LCD screen contrast.
- Brightness Settings: Adjust the LCD screen brightness.
- Sound Settings: Turn key tones and alarm tones on or off.
- Record Query: View historical data, including curve records and fault records.
- Clear Records: Clear historical data.
- DC Output Settings: Configure DC output to Off, Auto, Timed Control, or Light Control.
- Communication Settings: Configure Baud Rate and Device Address for RS485 communication.
- Language Settings: Select the display language.
5. Technical Specifications
The following tables detail the technical specifications for the ANENJI MPPT Solar Charging Controllers.
5.1 General Specifications
| Attribute | Description |
|---|---|
| Charging Mode | MPPT Automatic Maximum Power Point Tracking |
| Charging Method | Three stages: constant current (MPPT), equalization charging, floating charging |
| System Type | Automatic recognition / Manual settings (12V-48V) |
| Soft start time | ≤10s |
| Dynamic Response Recovery Time | ≤500μs |
| Static power consumption | ≤2W |
| Overall machine efficiency | ≥96.5% |
| Photovoltaic module utilization rate | ≤99.97% |
| Temperature coefficient | ±0.02%/°C |
| Automatic temperature compensation | 14.2V - (Highest temperature - 25°C) * 0.3 |
| Output voltage regulation accuracy | ≤±1.5% |
| LCD Display | For details, see the LCD display instructions. |
| LED Display | Charging indicator and DC output switch status indicator |
| PC Host Computer (Communication Port) | RS485 (Optional, 60A controller does not have RS485) |
| Audio noise | ≤50dB |
| Cooling method | Forced air cooling, fan speed adjusted by temperature. Slow/off at low internal temperature, full speed at high temperature. |
| Component | Imported materials, EU standards compliant, electrolytic capacitors rated ≥105°C. |
| Smell | Does not produce odors or harmful smells. |
| Environmental protection requirements | Compliant with 2002/95/EC; free of cadmium, hydrides, and fluorides. |
| Type of mechanical protection | IP21 |
| Environmental requirements | 0-90% RH (Does not condense) |
| Altitude | 0-3000m |
| Ambient temperature | -20°C to +40°C |
| Storage Temperature | -40°C to +70°C |
| Atmospheric pressure | 70-106kPa |
5.2 Model-Specific Specifications
For detailed specifications of each model (60A, 80A, 100A), please refer to the tables below. These tables include input characteristics, voltage protection points, maximum solar panel input power, output characteristics, and selectable battery types.

Detailed technical specifications for the ANJ-48V-60A MPPT Solar Charging Controller, including charge mode, system type, voltage ranges, input/output characteristics, and battery options.

Detailed technical specifications for the ANJ-48V-80A MPPT Solar Charging Controller, including charge mode, system type, voltage ranges, input/output characteristics, and battery options.

Detailed technical specifications for the ANJ-48V-100A MPPT Solar Charging Controller, including charge mode, system type, voltage ranges, input/output characteristics, and battery options.
6. Maintenance and Cleaning
6.1 Replacing the Fuse
If the fuse blows due to excessive temperature or other faults, it must be replaced. Remove the blown fuse from its socket, install a new fuse, and verify the connection before reinstalling the device. The fuse is located near the wiring terminal.
6.2 Cleaning the Ventilation Heat Sink
Regularly clean the fan vents and internal heat sinks by wiping them with a dry or slightly damp cloth. Do not use detergents or corrosive solvents for cleaning, and ensure no liquid enters the machine. Make sure the ventilation holes are not blocked.
7. Troubleshooting
If the controller malfunctions, consult the table below before contacting customer service.
| Fault or abnormal phenomenon | Troubleshooting |
|---|---|
| Controller powers on for the first time, but indicates battery voltage exceeds normal recognition range. |
|
| Fault Warning: Over-temperature Protection |
|
| Error Message: Battery Over-Discharge Protection | The battery has run out of power. |
| Error message: No external temperature sensor detected |
|
| Charging indicator light not on, no charging current, or no power display |
|
| Charging indicator light flashes briefly then goes out, and charging current is intermittent. | This is normal on cloudy days or at dusk when there is insufficient light. |
| Displays reactive power curve and current curve | Check if the time and date displayed on the MPPT controller are correct (refer to Time and Date Settings). |
If the problem persists after following the above steps, please contact customer service. Provide equipment information (model, order number, serial number), a detailed description of the problem, and the status of indicator lights and display conditions.
8. Warranty and Support
8.1 Quality Assurance
During the quality assurance period, products with malfunctions will be repaired or replaced with new products free of charge by our company.
To claim warranty service, customers must present the invoice and purchase date. The product's trademark must be clearly visible; otherwise, warranty service may be denied.
8.1.1 Warranty Conditions
- Replaced defective products should be handled by our company.
- Customers should allow a reasonable repair time for faulty equipment.
8.1.2 Liability Waiver
The company reserves the right not to provide a quality guarantee in the following situations:
- Whole machine or components beyond the free warranty period.
- Damage during transportation.
- Incorrect installation or modified use.
- Operation in environments more severe than specified in this manual.
- Machine failure or damage caused by servicing, repair, modification, or disassembly by unauthorized service centers.
- Damage caused by abnormal natural environmental conditions.
If product failure is caused by any of these situations and the customer requests repair service, paid repair service may be provided.
8.2 Further Information
Product appearance, dimensions, and specifications are subject to change according to the company's latest information, without further notice.
A detailed user manual in PDF format is available for download: ANENJI MPPT Solar Charging Controller User Manual (PDF).
9. User Tips
Based on user experiences, here are some helpful tips for using your ANENJI MPPT Solar Charging Controller:
- Fan Noise: The cooling fans can be loud, especially when charging power exceeds 200W. Consider installing the controller in a location away from living areas if noise is a concern. While the instructions state fans should activate above 45°C, some users report them turning on at lower power outputs regardless of internal temperature.
- RS485 Communication: The RS485 port is available on 80A and 100A models but not on the 60A version. If you plan to integrate with home automation systems like Home Assistant, be aware that documentation and accessories for the RS485 port are not readily available and may require custom solutions.
- Password for Settings: To access operating parameter settings, the controller requires a password. The sequence to enter the password is: Press the DOWN key 3 times, then press the UP key 3 times, and finally press the ENTER key.
- Battery Type Setting: The 60A model explicitly does not support lithium batteries. For other models, ensure you correctly select your battery type (lead-acid, gel, liquid, or lithium) and voltage settings to prevent damage and ensure efficient charging.
- Voltage Reading Discrepancy: Some users have noted that the MPPT controller might show a slightly higher battery voltage reading (e.g., +0.7V). Keep this in mind when monitoring your battery's state of charge.
- Clock Drift: The internal clock settings may drift over time (e.g., 4 minutes in 4 days). Periodically check and adjust the time settings if accuracy is critical for your logging or timed functions.
- Over-paneling Management: If you are using a solar array with a higher wattage than the controller's rated input power (over-paneling), consider setting a current limit (e.g., 60-70A for a 100A controller). This can help prevent current peaks from exceeding the controller's maximum capacity, especially during sudden increases in solar intensity.