ANENJI ANJ-12KP-LV-WIFI

Contents

ANENJI 12KW 48V Hybrid Solar Inverter User Manual

Model: ANJ-12KP-LV-WIFI

1. Introduction

This manual provides essential information for the safe and efficient operation of your ANENJI 12KW 48V Hybrid Solar Inverter. This device integrates photovoltaic energy, battery storage, and grid power to provide stable, safe, and clean electricity for various applications.

1.1 Product Overview

The ANENJI 12KW Hybrid Solar Inverter is a versatile power solution featuring a pure sine wave output, a built-in 200A MPPT solar charger, and parallel capability for up to 6 units. It supports both single-phase and split-phase configurations (120V/240VAC) and is compatible with various battery types, including LiFePO4, lead-acid, AGM, GEL, and SLD batteries. It also includes Wi-Fi remote monitoring for convenient management.

ANENJI 12KW Hybrid Solar Inverter Main Features
Figure 1: ANENJI 12KW Hybrid Solar Inverter highlighting 12KW capacity, 6 units parallel capability, 200A max solar charge current, 120V/240VAC output, and 125-425VDC PV array MPPT voltage range.

1.2 Product Features

  • Pure sine wave output (120VAC/240VAC)
  • Built-in dual 200A MPPT solar charging controllers
  • Supports parallel operation for up to 6 units (max 66000W PV input)
  • Compatible with various 48V battery types (LiFePO4, lead-acid, etc.)
  • Wi-Fi remote monitoring and Smart App management
  • Capacitive intelligent touch screen LCD display
  • Multiple protection functions: Overcharge, Overload, Over current, Over voltage, Short circuit, Over heat, Over speed, Under voltage
  • Four charging modes: Only PV, Mains power priority, PV priority, Hybrid charging
  • Energy-saving mode to reduce no-load energy losses
  • Supports CAN, USB, RS485 communication
  • Low-noise operation (45dB)
Product Characteristics and Features
Figure 2: Visual representation of key product characteristics including pure sine wave, charging/discharging, 200A MPPT, energy-saving mode, parallel capability, protective functions, batteryless operation, dual-channel PV input, WiFi monitoring, and four charge modes.

2. Safety Instructions

DANGER: Failure to follow these instructions may result in death, serious injury, or equipment damage.

  • Installation, wiring, and maintenance must be performed by qualified personnel only.
  • Strictly comply with national electrical safety standards and this manual's requirements.
  • Live operation is prohibited. Disconnect all power sources before installation, removal, or wiring.
  • Select appropriate cable sizes and protective devices according to specifications.
  • Do not disassemble, connect, or disconnect any cables during operation.
  • Follow the correct sequence for switching on/off circuit breakers.
  • Do not open the terminal cover while the inverter is in operation.
  • Ensure the inverter is properly grounded.
  • Do not short-circuit AC output and DC input.
  • Never charge a frozen battery.
  • Do not install near flammable materials or in potentially explosive areas.
  • Do not install in direct sunlight or humid environments.

3. Setup

3.1 Unpacking and Inspection

Upon receiving the inverter, carefully unpack it and inspect for any shipping damage. Ensure all components listed below are present:

  • ANENJI 12KW 48V Solar Inverter x 1
  • User Manual x 1
  • Parallel Cable x 1 (if applicable for parallel models)
  • Mounting Bracket (optional, depending on model)
  • Expansion Screws and other mounting hardware
  • SC70-8 Copper Noses x 2
  • M4 Black Phillips Countersunk Screws x 4

3.2 Installation Location

This inverter is designed for indoor use only (IP20 protection class). Choose a location that meets the following criteria:

  • Sturdy Wall: Mount on a solid, non-combustible surface (e.g., concrete).
  • Height: Install at eye level for easy LCD display readability.
  • Clearance: Ensure at least 50cm clearance above and 20cm on both sides for proper ventilation and heat dissipation.
  • Environment: Ambient temperature between 0°C and 55°C. Avoid direct sunlight, excessive humidity, and dust.
Inverter Mounting Clearance Diagram
Figure 3: Recommended mounting clearances (50cm top/bottom, 20cm sides) for optimal operation and heat dissipation.

3.3 Mounting the Unit

The inverter can be mounted using either a separate bracket or an integrated bracket method. Always ensure the mounting surface is solid and non-combustible.

  1. Mark Drill Holes: Use the mounting bracket as a template to mark the drill holes on the wall.
  2. Drill Holes: Drill 4 holes (for separate bracket) or 3 holes (for integrated bracket) according to the marked positions.
  3. Install Expansion Screws: Insert metal expansion bolts into the drilled holes. For separate brackets, tighten nuts to expand sleeves, then remove washers and nuts. For integrated brackets, tap plastic expansion tubes into the wall.
  4. Mount Bracket/Inverter:
    • Separate Bracket: Mount the bracket onto the pre-embedded expansion bolts, install washers, and tighten nuts securely. Then, hang the inverter body onto the fixed positioning structure of the bracket.
    • Integrated Bracket: Align the inverter with the pre-drilled holes, tighten the nuts of the metal expansion bolts, and screw in the plastic expansion screws for firm installation.

3.4 Wiring

WARNING: All wiring must be performed by qualified personnel. Ensure all circuit breakers are OFF before making any connections.

3.4.1 Product Overview (Ports)

Inverter Front and Rear Panel Overview
Figure 4: Front panel (Display screen, LED indicator, Set button) and Rear panel (AC input circuit breaker, WiFi port, RS485/CAN port, USB port, Dry contact, Switch, AC IN, Grounding screw, AC OUT, Parallel communication port, Battery terminals, PV input).

3.4.2 Cable and Circuit Breaker Selection

Refer to the table below for recommended cable sizes and circuit breaker specifications. Always use high-quality cables to prevent safety risks.

ConnectionWire DiameterMax CurrentCircuit Breaker
PV Input6mm² / 10 AWG22A2P-32A
AC Input/Output16mm² / 6 AWG63A3P-63A
Battery70mm² / 2/0 AWG200A2P-250A

3.4.3 AC Input and Output Wiring

Connect the live wire, neutral wire, and ground wire to the AC IN and AC OUT terminals as shown in the diagram. Ensure correct polarity and secure connections.

3.4.4 Battery Wiring

Connect the battery's positive and negative cables to the BAT+ and BAT- terminals. Ensure correct polarity. Successful communication between the lithium-ion battery and the inverter is mandatory for optimal performance.

3.4.5 Photovoltaic (PV) Wiring

Connect the positive and negative wires of the two photovoltaic circuits to the PV1 and PV2 inputs. Ensure the open circuit voltage of the PV module in series does not exceed 500VDC. For the same MPPT tracker, PV modules should have consistent orientation, tilt angle, and specifications.

3.4.6 Dry Contact Wiring

Use a small screwdriver to push the arrow and insert the communication cable (0.2-1.5mm²) into the dry junction port for generator remote start/stop functionality.

3.4.7 Grounding

Ensure the grounding terminal is reliably connected to the grounding busbar. The protective earthing conductor (PEC) should be at least 4mm².

3.4.8 Wiring Diagrams

Split-phase and Single-phase Wiring Diagrams
Figure 5: Detailed wiring diagrams for both Split-phase (L1+L2+N+PE) and Single-phase (L+N+PE) modes. Note: PV panel open circuit voltage must not exceed 500V.
Inverter System Configuration Diagram
Figure 6: System configuration showing connections between Solar Power, Generator, Utility Grid, Inverter, 48V Battery, and 110V/120V Household Appliances.

3.5 Initial Startup

  1. Close the circuit breaker of the battery.
  2. Press the ON/OFF switch at the bottom of the inverter. The screen and indicator lights will illuminate, indicating activation.
  3. Close the circuit breakers for photovoltaic, AC input, and AC output in sequence.
  4. Start the loads one by one, from smallest to largest power rating.

4. Operating

4.1 Interface Operation (LCD Display)

The inverter features a capacitive intelligent touch screen for displaying system data and operating status. The main screen shows real-time data for PV input, battery status, grid status, and load output. Navigation is intuitive via touch controls.

4.1.1 LED Indicators

  • AC/INV (Green): Steady on for Mains bypass output, Flashing for Inverter output.
  • CHARGE (Green): Steady on for Charging completed, Flashing for Charging in progress.
  • FAULT (Red): Flashing indicates a fault has occurred.

4.2 Operating Modes

The inverter supports various operating modes to optimize power usage based on availability and priority settings.

4.2.1 AC Output Modes

AC Output and Battery Charging Modes
Figure 7: Diagrams illustrating AC Output Modes (UTI, LOD, SOL, SBU, SUF) and Battery Charging Modes (SNU, OSO, CSO, CUB).
  • UTI (Default): Mains first supplies power. Mains and PV supply load when available. Battery powers load only when mains are unavailable.
  • LOD Priority: When battery is not connected or fully charged, PV and mains supply power to the load simultaneously.
  • SOL Priority: PV first supplies power to the load. Mains supplement if PV power is insufficient.
  • SBU Priority: PV first supplies power to the load. Mains supplement if PV power is insufficient/unavailable. Switches to mains when battery voltage reaches threshold.
  • SUF Priority: If solar energy is sufficient for all loads and battery charging, excess can feedback to the grid. Utility supplies power if solar is insufficient.

4.2.2 Battery Charging Modes

  • SNU (Default): Both PV and mains charge the battery, with PV used first and mains as a supplement.
  • OSO Priority: Only PV power is used to charge the battery; mains are not used for charging.
  • CSO Priority: PV first supplies power. Mains charge is enabled only when PV charge fails.
  • CUB Priority: Mains first charges the battery. PV charge starts only when mains are unavailable.

4.3 Parallel Operation

The inverter supports parallel connection of up to 6 units for increased power output (up to 66KW PV input). Parallel operation can be configured for split-phase or split-phase to three-phase systems.

  • PV Wiring: Each inverter in parallel must connect to separate PV arrays.
  • Battery Wiring: All inverters must connect to the same battery bank. Ensure identical wiring length and gauge.
  • AC OUT Wiring: For split-phase parallel, L, N, and PE terminals of all inverters must be interconnected. For split-phase to three-phase, N and PE are interconnected, and L lines of units sharing the same phase are connected.
  • AC IN Wiring: Similar to AC OUT, L, N, and PE terminals must be interconnected for split-phase. For three-phase, N and PE are interconnected, and L lines of units sharing the same phase are connected.
  • Communication: Use parallel communication cables in a daisy-chain approach. Securely tighten all connections.

4.4 Smart App Management

The inverter includes an external Wi-Fi module for real-time monitoring and control via a mobile app. Download the

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.