1. Introduction
The UNI-T UT271 series Clamp Earth Resistance Tester is a professional instrument designed for measuring grounding resistance and leakage current. This manual provides essential information for the safe and effective operation, maintenance, and troubleshooting of your device. Please read this manual thoroughly before use and keep it for future reference.

Figure 1: UNI-T UT271 Series Clamp Earth Resistance Testers
2. Safety Information
Always observe safety precautions when using electrical testing equipment. Failure to do so may result in injury or damage to the instrument.
- Ensure the device is in good working condition before each use.
- Do not operate the device in wet environments or explosive atmospheres.
- Wear appropriate personal protective equipment, such as insulated gloves, when performing measurements.
- The device features double insulation for enhanced safety.
- This product is certified with CE, FCC, RoHS, UL, KC, pse, and WEEE standards.
3. Product Overview and Features
The UT271 series offers robust features for accurate and efficient earth resistance and current measurements.

Figure 2: Main Features of the UT271 Series
Key Features:
- Grounding Resistance Measurement: Accurate measurement of earth resistance.
- Current Measurement: (UT271B/UT271C only) Measures AC current.
- Data Storage: Stores up to 500 sets of measurement data.
- Same-Screen Display: Displays both resistance and current simultaneously for improved efficiency.
- Double Insulation: Provides enhanced safety during operation.
- Fast Self-Test: Quick self-inspection function to verify accuracy.
- 32mm Circular Jaw: Suitable for grounding busbar measurements in most countries and regions.
- Large Screen LCD Backlit Display: LCD size 46mm × 36mm, easily readable in various lighting conditions.

Figure 3: 32mm Circular Jaw

Figure 4: Large Screen LCD Backlit Display
4. Setup
4.1 Unpacking and Contents
Upon opening the package, verify that all items are present and undamaged:
- Main Unit (UT271A, UT271B, or UT271C)
- Test Loop (1Ω & 10Ω)
- Carrying Bag
- User Manual
- Warranty Card

Figure 5: Packing List

Figure 6: Standard Test Loops (1Ω and 10Ω)
4.2 Battery Installation
The device requires four 1.5V AA batteries for operation. Batteries are not included and must be purchased separately. Refer to the battery compartment for correct polarity when installing.
4.3 Self-Inspection
Before performing critical measurements, it is recommended to conduct a self-inspection using the provided standard test rings to ensure the equipment is working accurately.
- Clamp the meter around the 1Ω test ring and observe the reading.
- Clamp the meter around the 10Ω test ring and observe the reading.
- Compare the readings with the expected values (1Ω and 10Ω).

Figure 7: Self-Inspection with 1Ω and 10Ω Test Rings
5. Operating Instructions
The UT271 series is designed for ease of use. Familiarize yourself with the controls:

Figure 8: Product Appearance Structure
- Jaw: Opens to clamp around conductors for measurement.
- Power On/Off/Exit Button: Turns the device on or off, and exits menus.
- MEM Button: Accesses memory functions for data storage.
- HOLD Button: Freezes the current display reading.
- Trigger: Used to open the jaw.
- LCD Display Screen: Shows measurement readings and status indicators.
5.1 Measurement Methods
5.1.1 Single Point Grounding System (Two-Point Method)
This method is used when a separate grounding body (RB) with good grounding performance is available, such as nearby metal water pipes, fire hydrants, or roof lightning strips. The grounding resistance values of these auxiliary points are typically very small and can be ignored.
- Locate the grounding body under test (RA) and a suitable auxiliary grounding body (RB).
- Connect RA and RB with a test line.
- Clamp the UT271 meter around the test line and read the grounding resistance.
- If the instrument reading during the two-point test is less than the required value of the tested grounding system, then both RA and RB are considered qualified.

Figure 9: Single Point Grounding System (Two-Point Method)
5.1.2 Single Point Grounding System (Three-Point Method)
This method is used for more precise measurements or when a suitable auxiliary grounding body for the two-point method is not available. The principle is based on the formula: RA = (R1 + R3 - R2) ÷ 2, where R1, R2, and R3 are resistances measured between different pairs of grounding bodies (RA, RB, RC).
- First Step: Connect RA and RB with a test wire and read the first data R1 using the clamp gauge.
- Second Step: Connect RA and RC with a test wire and read the second data R2 using the clamp gauge.
- Third Step: Connect RB and RC with a test wire and read the third data R3 using the clamp meter.
- Calculate RA using the formula: RA = (R1 + R3 - R2) ÷ 2.

Figure 10: Single Point Grounding System (Three-Point Method)
5.1.3 Multi-Point Grounding System
This method is applicable for complex grounding systems such as those found in transmission towers, communication cable grounding systems, and certain buildings. These systems are typically connected through overhead ground wires (shielding layers of communication cables) to form a comprehensive grounding network.

Figure 11: Multi-Point Grounding System
5.1.4 Loop Resistance Definition
The loop resistance encompasses the combined value of the grounding resistance of point A to ground, the resistance of the grounding down-lead metal conductor, the resistance of the metal overhead line, the connection resistance between the grounding downlead and the metal overhead line, and the grounding resistance of point B to ground. For example, if the instrument detects a combined value of 5 ohms for the grounding loops of grid A and grid B, that is, RA + RB + Roverheadline + Rgroundingdown-lead = 5.0Ω, then the grounding resistance of grid A and grid B combined to ground must be less than or equal to 2.5Ω.

Figure 12: Loop Resistance Definition
5.2 Application Examples
The UT271 series is versatile and can be used in various scenarios:
- Measurement of tower earthing resistance.
- Measurement of Grounding Resistance of Charging Pile.
- Measurement of AC current of distribution cabinet.
- Measurement of leakage current of circuit breaker.

Figure 13: Application Scenarios
The following table provides grounding standards for various common scenarios:

Figure 14: Grounding Standards for Various Common Scenarios
6. Maintenance
- Cleaning: Use a soft, dry cloth to clean the instrument. Do not use abrasive cleaners or solvents.
- Storage: Store the device in a cool, dry place. The recommended storage temperature is -10°C to 60°C, with humidity below 80% RH.
- Battery Replacement: Replace batteries promptly when the low battery indicator appears to ensure accurate measurements.
7. Troubleshooting
- No Display/Power On: Check battery installation and ensure batteries are not depleted.
- Inaccurate Readings: Perform a self-inspection using the 1Ω and 10Ω test rings. Ensure proper clamping and contact with the conductor.
- 'Noise' Symbol Displayed: The device automatically identifies interference signals. Try to minimize external electrical interference.
- 'MEM' Symbol Flashing: Indicates that the data storage is full. Clear stored data if new measurements need to be saved.
- 'OL' Indication: Indicates an overload condition. The measured value exceeds the device's range.
8. Specifications
Below are the technical specifications for the UNI-T UT271 series Clamp Earth Resistance Testers:
| Function | Range | Resolution | Accuracy | UT271A | UT271B | UT271C |
|---|---|---|---|---|---|---|
| Resistance | 0.01Ω-0.099Ω | 0.001Ω | ±(1%rdg+0.01Ω) | √ | √ | √ |
| 0.10Ω-0.99Ω | 0.01Ω | ±(1%rdg+0.01Ω) | √ | √ | √ | |
| 1.0Ω-49.9Ω | 0.1Ω | ±(1%rdg+0.1Ω) | √ | √ | √ | |
| 50.0Ω-99.5Ω | 0.5Ω | ±(1.5%rdg+0.5Ω) | √ | √ | √ | |
| 100Ω-199Ω | 1Ω | ±(2%rdg+1Ω) | √ | √ | √ | |
| 200Ω-395Ω | 5Ω | ±(2.5%rdg+5Ω) | √ | √ | √ | |
| 400Ω-590Ω | 10Ω | ±(10%rdg+10Ω) | √ | √ | √ | |
| Current | 0.00mA-9.99mA | 0.01mA | ±(2.5%rdg+1mA) | √ | √ | |
| 10.0mA-99.9mA | 0.1mA | ±(2.5%rdg+10mA) | √ | √ | ||
| 0.30A-2.99A | 0.01A | ±(2.5%rdg+0.1A) | √ | √ | ||
| 3.0A-9.9A | 0.1A | ±(2.5%rdg+0.5A) | √ | √ | ||
| Source | DC 6V, No.5 alkaline dry battery (LR6 1.5V×4) | |||||
| Jaw Size | Φ32mm | |||||
| Ω + A Same Screen Display | Supporting (UT271B, UT271C) | |||||
| Data Storage | 500 sets | |||||
| Jamming Test | Automatically identify interference signals, indicated by the "Noise" symbol when the interference current is high | |||||
| Battery Voltage | Low battery voltage symbol reminder | |||||
| Power Consumption | Max is about 80mA | |||||
| Time of Measurement | Once per second | |||||
| LCD Size | 46mm×36mm | |||||
| Caliper Gauge Size | 260mm×105mm×60mm | |||||
| Insulation Resistance | 20MΩ or above (500V between circuit and casing) | |||||
| Withstand Voltage | AC 3700Vrms (Between circuit and enclosure) | |||||
| Weight of Caliper Meter | Approximately 818g (including battery) | |||||
| Operating Temperature and Humidity | -10°C ~ 40°C; Below 80% RH | |||||
| Storage Temperature and Humidity | -20°C ~ 60°C; Below 80% RH | |||||
| External Magnetic Field and Electric Field | <40A/m; <1V/m | |||||
| Suitable for Safety Regulations | IEC61010-1 (CAT Ⅲ 300V, CAT Ⅳ 150V, pollution degree 2); IEC61010-031; IEC61557-1 (grounding resistance); JJG 1054-2009 Verification Regulation for Clamp Grounding Resistance Meter | |||||
Figure 15: Product Technical Specifications
9. User Tips
- For consistent and reliable measurements, always ensure the test points are clean and free from rust or corrosion.
- When measuring in areas with potential electrical interference, try to perform measurements at different times or locations to confirm readings.
- Regularly check the battery level, especially before extended use, to avoid interruptions during critical measurements.
10. Warranty and Support