1. Introduction

This manual provides detailed instructions for the installation, operation, maintenance, and troubleshooting of your Dobtian 2.2KW CNC Spindle Motor Kit. This kit includes a 2.2KW water-cooled spindle motor, a 2.2KW Variable Frequency Drive (VFD), a water pump, water pipes, an 80mm spindle clamp, and a set of ER20 collets. Please read this manual thoroughly before use to ensure safe and efficient operation.

Dobtian 2.2KW Water Cooled Spindle Kit components
Figure 1: Overview of the 2.2KW Water Cooled Spindle Kit components, including the spindle, VFD, water pump, collets, and clamp.

2. Safety Precautions

Before assembling, installing, or operating the spindle kit, observe the following safety guidelines:

  • Inspection: Carefully inspect all components upon receipt for any damage or deformation that may have occurred during transportation. Notify the distributor immediately if any abnormalities are found.
  • Model Verification: Ensure the received specifications match the nameplate (Working voltage and KVA number).
  • Internal Check: Verify that internal assembly parts, wiring, and circuit boards are normal and that all terminals are locked tightly.
  • Environment:
    • Operate in an ambient temperature range of -5°C to 40°C with good ventilation.
    • Avoid locations with dripping water, high humidity, direct sunlight, high temperatures, severe dust, corrosive gases, or liquids.
    • Ensure the area is free from excessive dust, oil mist, and metal dust.
    • Minimize vibration and electromagnetic noise interference.
  • Installation:
    • Install the inverter vertically to facilitate cooling and ensure smooth air circulation. Leave sufficient space around the inverter for maintenance.
    • Mount the inverter securely on a flat, non-combustible surface (e.g., iron plate) to prevent damage to main circuit parts.
    • When installing multiple inverters in the same cabinet, ensure proper spacing and use baffle plates between them.
  • Wiring: Always connect the inverter main circuit and control signal wires correctly. Ensure the power supply voltage matches the inverter's voltage levels to prevent damage.
  • Parameter Settings: Set inverter parameters correctly before operation.
  • Professional Installation: High voltage is present inside the inverter. Installation and maintenance should only be performed by well-trained personnel.

3. Specifications

3.1. CNC Spindle Motor (Water-Cooled)

Water-Cooled Spindle Specifications
Figure 2: Detailed specifications for the water-cooled spindle motor.
Spindle Motor Specifications
FeatureSpecificationFeatureSpecification
MaterialStainless SteelCoolingWater-cooled
Size80mm (Middle body diameter) x 213mm (Length)Accuracy0.003-0.005mm
Power2.2KWRunout offLess than 0.005mm
Voltage110V/220VBearing LubricationGrease
Current8ACollet sizeER20
Frequency0-400HzBearings4 bearings (C7005x2 + C7002x2), P4 class, Angular contact bearings
Speed0-24000rpmNet Weight5.2kg

3.2. Variable Frequency Drive (VFD)

VFD Dimensions
Figure 3: Dimensions of the VFD (125mm W x 163mm D x 170mm H).
  • Model: YL620-A
  • Type: 2.2KW/220V
  • Input: 220VAC/50Hz (Single-phase)
  • Output: 0-220VAC (3-phase)
  • Frequency: 0-400Hz
  • Communication Interface: 485 communication interface, adjustable in 8+16 segments.
  • Material: ABS+PE flame retardant material.
  • Dimensions: 125mm (Width) x 163mm (Depth) x 170mm (Height)
  • Cooling: Strong cooling fan with porous heat dissipation.
  • Remote Operation: Detachable panel for easy remote operation (wire length up to 1.5M).

3.3. Water Pump

Water Pump Setup and Specifications
Figure 4: Water pump setup diagram and specifications.
  • AC Voltage: 220V-240V/50Hz
  • Flow: 3500L/h
  • Power: 80W
  • Hmax: 3.5m (138in)
  • Water Nozzle Diameter: 6mm (0.24in)
  • Structure: Single-stage pump
  • Pressure: High pressure
  • Dimensions: 15.3cm x 8.8cm x 10.8cm (6" x 3.5" x 4")
  • Caution: Do not operate without water. Read instructions carefully before using.

3.4. ER20 Collet Set

ER20 Collet Set Dimensions
Figure 5: ER20 Collet set with dimensions and range.
  • Quantity: 13 pieces
  • Gripping Range: 1mm to 13mm (includes 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13mm)

3.5. 80mm Spindle Mount Clamp

80mm Spindle Mount Bracket Dimensions
Figure 6: Dimensions of the 80mm spindle mount bracket.
  • Diameter: 80mm
  • Material: Aluminum, Surface sandblasted
  • Application: Woodworking industry routers, such as wood door milling, engraving, and cutting; furniture production.
  • Dimensions: Approximately 150mm (5.9 inch) Length x 80mm (3.1 inch) Width x 80mm (3.1 inch) Height.

4. Setup and Installation

4.1. VFD Main Circuit Terminal Description

The main circuit terminals are used for power input and motor output connections.

Main Circuit Terminal Description
Terminal SymbolDescription
N, LPower input terminal (220V inverter is single-phase 220V input, 110V inverter is single-phase 110V input)
U, V, WInverter output terminal (220V inverter is three-phase 220V output, 110V inverter is three-phase 110V output)
+DB-Braking resistor connection end (optional, refer to section 4.6 for configuration details)
FGFrame Ground

4.2. VFD Control Terminal Description

The control terminals are used for various control signals and external connections.

Control Terminal Description
Terminal SymbolDescription
NCNOTCONNECTED
MOTriode output
FWDForward
REVReverse
X1, X2, X3, X4Multi-function input 1, 2, 3, 4
XGNDCommon terminal of digital control signal
XVCCExternal input 15V
GNDAnalog control signal common terminal
VI1Analog current frequency command
10VPower supply for speed setting
13VExternal power supply
AOAnalog output
NC1Relay normally closed contact
NO1Relay normally open contact
CM1Relay common terminal

4.3. Wiring Diagrams

Proper wiring is critical for safe and correct operation. Refer to the diagrams below for connecting the VFD, spindle motor, and water pump.

4.3.1. VFD to Spindle Motor Wiring

VFD and Spindle Motor Wiring Diagram
Figure 7: Wiring diagram for connecting the VFD to the spindle motor. Ensure correct power source, ground lead, and brake resistance connections.

Connect the power source to the VFD's N and L terminals. Connect the VFD's U, V, W output terminals to the corresponding terminals on the spindle motor. Ensure the ground lead is properly connected. If using a brake resistance, connect it to the +DB- terminals.

Note: For 220V input, the VFD provides 3-phase 220V output. If your motor is 380V (star connection), it must be reconfigured to 220V (delta connection). The VFD cannot be connected to single-phase motors with capacitors.

4.3.2. Water Pump Setup

Water Pump Setup Diagram
Figure 8: Diagram illustrating the water pump setup for spindle cooling. The pump is fully immersed in a bucket of water, circulating water through the spindle.

The water pump is a submersible type and must be completely immersed in water within a suitable bucket or reservoir. Connect the water pipes from the pump's water outlet to the spindle's water inlet, and from the spindle's water outlet back to the bucket. Plug the water pump into a compatible power source (220V/110V depending on your kit version).

4.3.3. VFD Control Wiring Examples

The VFD supports various control methods. Below are examples for panel control and three-wire control.

Panel Control Wiring
VFD Panel Control Wiring Diagram
Figure 9: Wiring diagram for VFD panel control. This shows connections for power, motor, and optional brake resistor.

For panel control, the VFD's digital operator panel is used for starting, stopping, and adjusting frequency. The main circuit connections remain as described in 4.3.1.

Three-Wire Control Wiring
VFD Three-Wire Control Wiring Diagram
Figure 10: Wiring diagram for VFD three-wire control, showing connections for external start/stop buttons.

This diagram illustrates connecting external start and stop buttons for three-wire control. Refer to the VFD's control terminal descriptions (Section 4.2) for specific terminal functions (e.g., FWD, REV, X1-X4, CM1).

For detailed wiring of multi-speed control, analog quantity control, or external potentiometers, please refer to the full PDF manual.

4.4. Spindle Mounting

Use the provided 80mm spindle clamp to securely mount the spindle motor to your CNC machine. Ensure the clamp is tightened evenly to prevent vibration and maintain rigidity during operation.

4.5. Collet Installation

To install an ER20 collet:

  1. Insert the desired ER20 collet into the collet nut.
  2. Thread the collet nut onto the spindle shaft.
  3. Insert the tool into the collet.
  4. Tighten the collet nut using a wrench until the tool is securely held.

4.6. Braking Resistor Configuration (Optional)

If rapid braking is required, a braking resistor can be connected to the +DB- terminals of the VFD. Refer to the table below for recommended braking resistor specifications based on your spindle power.

Braking Resistor Configuration
Spindle PowerResistor Power (W)Resistance (Ω)
0.75KW-220V/110V80W220Ω
1.5KW-220V/110V150W220Ω
2.2KW-220V/110V250W200Ω

Important Notes for Braking Resistor:

  • Always use the resistance and frequency specified by the manufacturer.
  • Using unapproved braking resistors or modules can damage the inverter or other equipment.
  • The braking resistor must be installed considering environmental safety, flammability, and a minimum distance of 100mm from the inverter.
  • If you need to change the resistance or power, consult your local dealer.
  • For machinery with large inertia, consider increasing the capacity of the braking resistor.

5. Operation

5.1. Digital Operator Panel

VFD Digital Operator Panel
Figure 11: Description of the VFD's digital operator panel and its buttons.

The digital operator panel allows for monitoring and setting VFD parameters. Key buttons include:

  • F/R (Forward/Reverse Switch Key): Changes motor rotation direction.
  • RUN (Run Key): Starts the motor.
  • STOP (Stop Reset Button): Stops the motor and resets errors.
  • DISP (Shift Key): Shifts cursor position during parameter editing.
  • ▲ / ▼ (Up/Down Keys): Adjusts values or navigates menus.
  • PRGM (Programming Key): Enters/exits programming mode.
  • SET (Select/Confirm Key): Confirms selections or enters parameter editing.

5.2. Parameter Setting Method

To set VFD parameters:

  1. Press the PRGM key until the inverter displays "Pyy.xx" to enter parameter setting state (yy = group number, xx = parameter number).
  2. Use the ▲ or ▼ keys to select the desired parameter group and number.
  3. Press the SET key to enter the parameter value setting state.
  4. Use the ▲ or ▼ keys to modify the parameter value. Use the DISP key to shift between digits for faster editing.
  5. Press the SET key to save the modified parameter.
  6. Press the PRGM key to exit the parameter setting state.

Note:

  • Parameters can only be modified when the inverter is stopped (RUN light is off).
  • If parameter table is locked (P00.13=1), parameters can only be viewed, not modified.
  • After setting, turn off the power and wait for the inverter lights to go out before powering on for changes to take effect.

5.3. Key Parameters for Spindle Operation

The following parameters are crucial for initial spindle setup. Ensure these are configured correctly for your 2.2KW spindle:

  • P00.00 (Main digital frequency): Set to 400.0HZ (for 24000rpm spindle).
  • P00.04 (VF curve: maximum output frequency): Set to 400.0HZ.
  • P00.05 (VF curve: output frequency at maximum voltage): Set to 400.0HZ.
  • P00.07 (VF curve: intermediate frequency): Set to 40.0HZ.
  • P00.08 (VF curve: intermediate voltage): Set to 10%.
  • P00.09 (VF curve: minimum output frequency): Set to 4.0HZ.
  • P00.10 (VF curve: minimum output voltage): Set to 1%.
  • P00.13 (Parameter recovery/locking/read and write): Set to 0 to allow parameter changes. If set to 10, it restores factory settings (requires power cycle).

For a complete list of parameters and their functions, refer to the "Function table" in the full PDF manual (Section 7.1).

5.4. Trial Run

Before starting any machining operations, perform a trial run to ensure everything is functioning correctly.

  1. Pre-Operation Inspection:
    • Double-check all wiring for errors, especially power supply to N/L terminals and motor to U/V/W terminals.
    • Ensure no metal chips or loose wires are present on the inverter substrate or terminals.
    • Verify all screws are tightly locked and connectors are secure.
    • Check for any short circuits or ground faults in the output part.
  2. Cooling Fan Trial Run: Each time the STOP button is pressed, the VFD's cooling fan will run for approximately 30 seconds. Observe its operation to ensure it's working normally.
  3. Spindle Operation: Start the spindle at a low RPM and gradually increase it, monitoring for unusual noises, vibrations, or overheating. Ensure the water cooling system is circulating water effectively.

6. Maintenance

Regular maintenance ensures the longevity and optimal performance of your spindle kit.

  • Cleaning: Regularly clean the VFD and spindle motor to prevent dust and debris buildup, which can hinder cooling and cause malfunctions. Use compressed air to clear vents.
  • Cooling System:
    • Ensure the water pump is always submerged in clean water.
    • Periodically check water levels and replenish as needed.
    • Clean the water reservoir and pipes to prevent algae or sediment buildup that could restrict flow.
    • Inspect water pipes for kinks or leaks.
  • VFD Cooling Fan: Check the VFD's cooling fan periodically for proper operation. A damaged or blocked fan can lead to overheating.
  • Connections: Periodically inspect all electrical connections for tightness. Loose connections can cause intermittent operation or damage.
  • Spindle Bearings: The spindle uses grease lubrication. While designed for high performance, excessive noise or vibration may indicate bearing issues requiring professional attention.

7. Troubleshooting

This section outlines common error codes and troubleshooting steps for the VFD.

VFD Error Codes and Solutions
Error CodeFault PhenomenonAnalysis and Solutions
Er.00Power failure, low voltage (<140VAC)Check input power voltage (150-250V). If high inertia load, increase deceleration time. Inaccurate voltage detection may require maintenance. Consider braking resistor for large inertia loads.
Er.01High voltage (>290VAC), internal bus voltage too highCheck input power voltage (150-250V). If high inertia load, increase deceleration time. Inaccurate voltage detection may require maintenance. Consider braking resistor for large inertia loads.
Er.02Overcurrent (current too large)Check for motor short circuit, correct wiring, and excessive mechanical load. If issues persist, maintenance is required.
Er.03Internal PWM circuit errorPower off for 1 minute, then retry. If it recurs, maintenance is required.
Er.04IPM alarm (short circuit)Internal power unit module error. Short acceleration/deceleration times. Overcurrent/overheated (check motor short circuit, load). High/low/fluctuating input voltage. Inverter/motor mismatch, incorrect star/delta wiring. Improper P01.09-P01.17 or P00.04-P00.12 settings. Damaged/blocked cooling fan. High/low gate drive voltage.
Er.05External fault signal inputMotor stops, displays this code. Reset to clear. No maintenance required unless external fault source persists.
Er.06Internal data storage errorPower off for 1 minute, then test. If it recurs, maintenance is required.
Er.07Over temperature (>65°C)Check if cooling fan is stopped/blocked. Check for motor short circuit or excessive load. Verify heat conduction between inverter module and heat sink.
Er.08NTC temperature measurement errorInternal temperature detection circuit or sensor is faulty. Requires repair.
Er.10Power down promptCheck input power voltage to ensure it's within range.
Er.11RS485 communication disconnected/errorRelated to parameters P03.03, P03.04. Check RS485 connections and settings.
Er.12Parameter errorVerify all VFD parameters are set correctly according to the manual. Reset to factory defaults if unsure (P00.13=10) and reconfigure.
Er.15Motor overheatedCheck spindle cooling system (water pump, water flow). Reduce load or operating time. Ensure VFD parameters are set correctly to prevent motor overload.

For any persistent issues or errors not listed here, please consult the full PDF manual or contact technical support.

8. User Tips

  • Parameter Clarity: The VFD manual can be complex. When setting parameters, take your time and double-check each value against the specifications provided in this manual and the comprehensive PDF.
  • Initial Setup: For first-time users, it's recommended to perform a dry run (without a cutting tool or material) after initial setup to verify all components are working as expected before engaging in actual machining.
  • Water Cooling: Always ensure the water cooling system is fully operational and circulating water before starting the spindle motor. Running the spindle dry can cause severe damage.

9. Warranty and Support

This product is covered by a manufacturer's warranty against defects in materials and workmanship. For warranty claims, technical support, or service inquiries, please contact your original point of purchase or the manufacturer directly. Keep your purchase receipt as proof of purchase.

10. Additional Documents

A comprehensive user manual for the VFD is available in PDF format. This document contains detailed parameter tables, advanced wiring diagrams, and in-depth troubleshooting information.

You can view the full VFD user manual here: VFD User Manual (PDF)

Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.