SmartGen HAT520N HAT530N

Contents

SmartGen HAT520N HAT530N ATS Automatic Transfer Switch Controller User Manual

Models: HAT520N, HAT530N

Brand: SmartGen

1. Introduction and Overview

The SmartGen HAT520N and HAT530N are advanced Automatic Transfer Switch (ATS) controllers designed for reliable power management. Equipped with a powerful microprocessor, these controllers accurately measure voltage (supporting 2-phase, 3-phase, and single-phase systems) and detect various abnormal voltage conditions. These conditions include power loss, over/undervoltage, over/under frequency, phase loss, and phase sequence errors.

Upon detecting an abnormality in the primary power supply, the controller initiates a delay before sending a signal to start the genset, ensuring a smooth and controlled power transfer. These controllers are compatible with both Normally Open (NO) Breaking ATS and One Breaking ATS configurations. The 'Three Remotes' function (remote control, telemetry, and telecommunication) can be implemented via the LINK communication port, offering enhanced monitoring and control capabilities.

Front view of SmartGen HAT520N ATS controller
Figure 1: Front view of SmartGen HAT520N ATS controller
Front view of SmartGen HAT530N ATS controller
Figure 2: Front view of SmartGen HAT530N ATS controller

2. Setup and Installation

Proper installation is crucial for the safe and effective operation of your SmartGen ATS controller. Please follow these guidelines carefully.

2.1 Unpacking and Inspection

Upon receiving your controller, carefully unpack it and inspect for any signs of damage. Ensure all components, including the mounting clips, are present.

SmartGen HAT520N/HAT530N controller in packaging with mounting clips
Figure 3: Controller in packaging with mounting clips

2.2 Mounting

The controller is designed for panel mounting. Use the provided clips to secure the unit into a suitable cutout. Ensure adequate ventilation around the unit.

SmartGen ATS controller with mounting clips attached
Figure 4: Controller with mounting clips attached

2.3 Wiring Connections

Refer to the detailed wiring diagram below for all electrical connections. All wiring should be performed by a qualified electrician in accordance with local and national electrical codes.

Detailed wiring diagram for the SmartGen HAT520N/HAT530N ATS controller
Figure 5: Rear view and wiring diagram of the ATS controller

Key Terminal Connections:

  • Terminals 1-6: Auxiliary Outputs (AUX OUTPUT1, AUX OUTPUT2) - Rated 16A.
  • Terminals 7-10: 1# AC Voltage Input (A1, B1, C1, N1) - For Source 1 power monitoring.
  • Terminals 11-12: Common (COM) - For control signals.
  • Terminals 13-16: Link Port - For communication (remote control, telemetry, telecommunication).
  • Terminals 17-20: Genset Start (GENS START) - Rated 7A.
  • Terminals 21-24: 2# AC Voltage Input (A2, B2, C2, N2) - For Source 2 power monitoring.
  • Delay Settings: Adjustable delay settings for various operations (e.g., transfer delay, genset start delay).

WARNING: Ensure all power sources are disconnected before making any electrical connections to prevent electric shock or damage to the unit.

3. Operating Instructions

The SmartGen ATS controller provides intuitive controls for managing power transfer between two sources.

3.1 Front Panel Controls and Indicators

  • Source 1 / Source 2 Indicators: Display the status of each power source.
  • Load Indicator: Shows which source is currently supplying power to the load.
  • Auto / Man Switch: Toggles between automatic and manual operation modes.
  • 1# Close Button: Manually closes the contactor for Source 1.
  • Open Button: Manually opens the currently closed contactor, disconnecting the load from both sources.
  • 2# Close Button: Manually closes the contactor for Source 2.

3.2 Operating Modes

  • Automatic Mode: In this mode, the controller continuously monitors both power sources. If Source 1 fails or becomes abnormal, the controller will wait for a pre-set delay, then send a signal to start the genset (if Source 2 is a genset) and transfer the load to Source 2. When Source 1 recovers, the controller will wait for another pre-set delay before transferring the load back to Source 1 and shutting down the genset.
  • Manual Mode: In manual mode, the user has direct control over the transfer process using the '1# Close', 'Open', and '2# Close' buttons. This mode is typically used for testing or specific operational requirements.

3.3 'Three Remotes' Function

The LINK communication port enables advanced remote functionalities:

  • Remote Control: Operate the ATS controller from a remote location.
  • Telemetry: Monitor real-time data and status of the power sources and load.
  • Telecommunication: Receive alerts and communicate with the controller remotely.

4. Maintenance

To ensure the longevity and reliable performance of your SmartGen ATS controller, regular maintenance is recommended.

  • Regular Visual Inspection: Periodically check the controller for any signs of physical damage, loose connections, or excessive dust accumulation.
  • Cleaning: Keep the controller's exterior clean and free from dust. Use a soft, dry cloth. Do not use abrasive cleaners or solvents.
  • Terminal Tightness: Annually, or as needed, verify that all terminal connections are secure and tight. Loose connections can lead to overheating and malfunction.
  • Functionality Test: Periodically test the automatic transfer function by simulating a power failure on Source 1 to ensure the system transfers correctly.

CAUTION: Disconnect all power before performing any maintenance or cleaning procedures.

5. Troubleshooting

If you encounter issues with your SmartGen ATS controller, refer to the following basic troubleshooting steps:

  • Controller Not Powering On: Check the power supply connections to the controller. Ensure the voltage is within the specified operating range.
  • No Automatic Transfer: Verify that the controller is in 'Auto' mode. Check the voltage and frequency of both power sources. Ensure all delay settings are correctly configured.
  • Genset Not Starting: Check the genset start signal wiring. Ensure the genset itself is in good working order and ready to start.
  • Incorrect Phase Sequence Error: If a phase sequence error is indicated, verify the phase connections for both power sources.
  • Communication Issues (LINK Port): Check the LINK port connections and ensure the communication settings are correctly configured on both the controller and the remote device.

For persistent issues or complex problems, please contact qualified technical support.

6. Specifications

FeatureSpecification
ModelsHAT520N, HAT530N
Voltage Measurement2-phase, 3-phase, single-phase
Abnormal Voltage DetectionPower loss, over/undervoltage, over/under frequency, phase loss, phase sequence error
ATS CompatibilityNO Breaking ATS, ONE Breaking ATS
Communication PortLINK (for remote control, telemetry, telecommunication)
Auxiliary Outputs2 x 16A
Genset Start Output1 x 7A
MaterialABS and Metal
ColorBlack
Approximate Package Dimensions150 x 150 x 80 mm
Approximate Package Weight500 g

7. User Tips

  • Always ensure that the controller is installed in a dry, well-ventilated area, away from direct sunlight or extreme temperatures.
  • Familiarize yourself with the manual and the functions of each button and indicator before operating the unit.
  • Regularly check the status indicators to ensure both power sources are healthy and the load is being supplied as expected.
  • For critical applications, consider periodic testing of the ATS functionality to confirm readiness.

8. Warranty and Support

For warranty information, technical support, or service inquiries, please contact your authorized SmartGen dealer or the manufacturer directly. Keep your purchase receipt and product model information handy when contacting support.

9. Product Video

This video provides a glimpse into the storage and handling of SmartGen controllers, showcasing the product in a warehouse environment.

Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.