GEYA GRT6-S

Contents

GEYA GRT6-S Series Asymmetric Cycler Time Delay Relay Instruction Manual

Models: GRT6-S1, GRT6-S2

1. Product Overview

The GEYA GRT6-S series is an asymmetric cycler time delay relay designed for applications requiring cyclic operation, such as regular room ventilation, cyclic dehumidification, light control, circulating pumps, and noon signs. This relay offers two time functions: cycler beginning with a pulse or cycler beginning with a pause, selectable via an external jumper.

The GRT6-S series is available in two main configurations:

  • GRT6-S1: Features 1 SPDT (Single Pole Double Throw) output contact.
  • GRT6-S2: Features 2 SPDT (Single Pole Double Throw) output contacts.

Both models support a wide voltage range and adjustable time scales.

GEYA GRT6-S Asymmetric Cycler Time Relay overview
Figure 1: GEYA GRT6-S Asymmetric Cycler Time Relay overview, showing adjustable time range and output contacts.

2. Specifications

ParameterGRT6-S1GRT6-S2
FunctionAsymmetric cycler time relay
Supply terminalsA1-A2
Voltage rangeAC/DC 24-240V (50-60Hz) or AC 230V (50-60Hz)
BurdenAC 0.09-3VA/DC 0.05-1.7W
Power inputAC max 6VA/1.3WAC max 6VA/1.9W
Supply voltage tolerance-15%; +10%
Supply indicationgreen LED
Time ranges0.1s-100days
Time settingpotentiometer
Time deviation10%-mechanical setting
Repeat accuracy0.2%-set value stability
Temperature coefficient0.05%/°C, at 20°C (0.05%°F, at 68°F)
Output1×SPDT2×SPDT
Current rating10A/AC1
Switching voltage250VAC/24VDC
Min. breaking capacity DC500mW
Output indicationred LED
Mechanical life1×107
Electrical life (AC1)1×105
Reset timemax 200ms
Operating temperature-20°C to +55°C (-4°F to 131°F)
Storage temperature-35°C to +75°C (-22°F to 158°F)
Mounting/DIN railDIN rail EN/IEC 60715
Protection degreeIP40 for front panel/IP20 terminals
Operating positionany
Overvoltage categoryIII.
Pollution degree2
Max. cable size (mm²)solid wire max. 1x2.5 or 2x1.5 / with sleeve max. 1x2.5 (AWG 12)
Tightening torque0.4Nm
Dimensions90 x 18 x 64mm
Technical parameters table and Panel/Wiring Diagram for GRT6-S1 and GRT6-S2
Figure 2: Detailed Technical Parameters, Panel Diagram, and Wiring Diagram for GRT6-S1 and GRT6-S2.

3. Functions

The GRT6-S series offers two primary cyclic timing functions:

  • Cycler beginning with pulse: The relay output activates (pulse) for a set duration, then deactivates (pause) for another set duration, repeating the cycle.
  • Cycler beginning with pause: The relay output deactivates (pause) for a set duration, then activates (pulse) for another set duration, repeating the cycle.

The function choice is made by connecting an external jumper between terminals S and A1. Refer to the wiring diagrams for specific connections.

Functions Diagram and Setting Instructions
Figure 3: Functions Diagram illustrating 'Cycler beginning with pulse' and 'Cycler beginning with pause'.

4. Installation

The GEYA GRT6-S series relays are designed for 1-MODULE DIN rail mounting (EN/IEC 60715). Ensure the relay is securely mounted in a suitable enclosure, providing adequate ventilation and protection from environmental factors.

  • Mount the relay on a standard 35mm DIN rail.
  • Ensure proper clearance around the device for heat dissipation and access to terminals.
  • Verify that the operating position is suitable for the application.
Dimensions (MM) for GRT6-S1 model
Figure 4: Dimensions of the GRT6-S1 model (90mm height, 18mm max width, 64mm depth).

5. Wiring Diagram

Correct wiring is crucial for the safe and proper operation of the relay. Refer to the specific wiring diagram for your model (GRT6-S1 or GRT6-S2) and ensure all connections are secure and meet local electrical codes.

5.1 GRT6-S1 Wiring

Product Wiring Diagram for GRT6-S1
Figure 5: Standard wiring diagram for GRT6-S1 (1 SPDT output).

For GRT6-S1, connect the Line (L) and Neutral (N) to the A1 and A2 terminals respectively for power supply. The load is connected to the output contacts (15, 16, 18). The S terminal can be used for function selection (e.g., off delay when connected to A1).

5.2 GRT6-S2 Wiring

GRT6-S2 model with wiring diagram
Figure 6: Wiring diagram for GRT6-S2 (2 SPDT outputs).

For GRT6-S2, power supply connections are similar to GRT6-S1. It provides two independent SPDT output contacts (15, 16, 18 and 25, 26, 28) for controlling two separate loads or circuits.

6. Operation

The GRT6-S relay operates by cycling between ON and OFF states based on the set time delays. The operation mode (pulse first or pause first) is determined by the S-A1 jumper connection.

6.1 Basic Operation Cycle

Once power is applied, the relay initiates its programmed cycle. If set to 'Cycler beginning with pulse', the output will immediately activate for the set 'ON' time, then deactivate for the set 'OFF' time, and repeat. If set to 'Cycler beginning with pause', the output will remain deactivated for the set 'OFF' time, then activate for the set 'ON' time, and repeat.

6.2 S Terminal Function (Off Delay Example)

Connecting the S terminal to A1 can enable an 'off delay' function. In this mode, when the power is applied, the relay will delay for a set time before starting its normal cyclic operation. When the power is removed, the relay will remain active for a set duration before turning off.

Video 1: Demonstration of an asymmetric cycler time relay (GRT8-S1 shown) operating with a set ON/OFF cycle and an off-delay function using the S terminal.

7. Setting Instructions

The GRT6-S relay features two rotary knobs for time adjustment:

  • Knob 1 (Delay Gear Setting): This knob selects the time range (e.g., 's' for seconds, 'm' for minutes, 'h' for hours, 'd' for days).
  • Knob 2 (Fine Adjustment of Delay Time): This knob allows for fine-tuning the delay time within the selected range, from 10% to 100% adjustable.

The total delay time is calculated as: Delay time = Knob 1 setting × Knob 2 percentage.

Examples:

  • To set for 5 seconds: Set Knob 1 to '10s', and Knob 2 to '50%'. Delay time = 10s × 50% = 5s.
  • To set for 8 minutes: Set Knob 1 to '10m', and Knob 2 to '80%'. Delay time = 10m × 80% = 8m.
Setting instructions for time adjustment knobs
Figure 7: Detailed instructions for setting the time delay using the two adjustment knobs.

8. Troubleshooting

If the relay is not functioning as expected, consider the following:

  • No Power Indication (Green LED Off): Check the power supply connections (A1, A2) and ensure the voltage is within the specified range. Verify circuit breakers or fuses.
  • Output Not Activating (Red LED Off/Load Not Switching):
    • Check the load connections and ensure the load is not faulty.
    • Verify the time settings on both knobs.
    • Ensure the S-A1 jumper is correctly configured for the desired function.
    • Check the current rating of the load does not exceed 10A.
  • Incorrect Timing: Re-check the time range (Knob 1) and fine adjustment (Knob 2) settings. Ensure the calculation for the desired delay is correct.
  • Intermittent Operation: Check all wiring connections for looseness or corrosion. Ensure the operating temperature is within the specified range.

If issues persist after checking these points, consult a qualified electrician or contact GEYA customer support.

9. User Tips

  • Accurate Time Setting: For precise timing, use a stopwatch to verify the actual ON/OFF durations after setting the knobs. Minor adjustments may be needed.
  • Jumper for Function: Remember that the S-A1 jumper determines whether the cycle starts with a pulse or a pause. Double-check this connection for your intended application.
  • Load Compatibility: Always ensure the connected load's current and voltage requirements are within the relay's specifications (10A/AC1, 250VAC/24VDC).

10. Maintenance

The GEYA GRT6-S series relays are designed for long-term, maintenance-free operation under normal conditions. However, periodic checks can help ensure optimal performance:

  • Visual Inspection: Periodically inspect the relay for any signs of physical damage, discoloration, or loose connections.
  • Terminal Tightness: Ensure all terminal screws are adequately tightened (0.4Nm) to prevent overheating or intermittent operation.
  • Environmental Conditions: Verify that the operating environment remains within the specified temperature and humidity limits. Keep the relay free from dust and moisture.
  • Cleaning: If necessary, gently clean the exterior of the relay with a dry, soft cloth. Do not use abrasive cleaners or solvents.

Always disconnect power before performing any inspection or maintenance.

11. Warranty and Support

For warranty information, technical support, or any inquiries regarding your GEYA GRT6-S series time delay relay, please contact the GEYA Official Store or your authorized distributor. Ensure you have your product model number and purchase details available when seeking support.

GEYA Official Store Contact Information:

  • Website: www.geya.net
  • Email: cassie@cngeya.com
  • Phone: +86 13968799499
  • Address: Wenzhou Bridge Industrial Zone, Beibaixiang Town, Wenzhou City, Zhejiang Province, China
GEYA contact information business card
Figure 8: GEYA contact information for support.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.