PowMr POW-HVM6.2KP

Contents

PowMr 6.2KW Hybrid Solar Inverter User Manual

Model: POW-HVM6.2KP

1. Introduction

This manual describes the assembly, installation, operation, and troubleshooting of the PowMr 6.2KW Hybrid Solar Inverter. Please read this manual carefully before installations and operations, and keep it for future reference.

1.1 Purpose

This manual provides safety and installation guidelines as well as information on tools and wiring for the PowMr 6.2KW Hybrid Solar Inverter.

1.2 Features

  • Pure sine wave inverter
  • Configurable input voltage range for home appliances and personal computers via LCD setting
  • Configurable battery charging current based on applications via LCD setting
  • Configurable AC/Solar Charger priority via LCD setting
  • Compatible with mains voltage or generator power
  • Auto restart while AC is recovering
  • Overload/Over temperature/short circuit protection
  • Smart battery charger design for optimized battery performance
  • Cold start function
  • Supports parallel operation for up to 9 units.

1.3 Product Overview

The PowMr 6.2KW Hybrid Solar Inverter is an all-in-one solar inverter designed to meet most household solar energy needs. It supports solar and bypass power supply, solar and grid charging, and keeps your battery safely charged as backup. The AC output voltage is adjustable (220V/230V/240V) with a rated AC output of 6200W, boosting to 6500W when solar input exceeds 2000W and the battery supports the load. It features dual output ports for stable power to critical loads and is compatible with 48V lead-acid or lithium batteries, supporting up to 120A charging current. It handles up to 8500W of PV input and allows up to 9 units in parallel for a total output of 55.8kW.

Video: Overview of the PowMr 6.2KW Hybrid Solar Inverter, highlighting its features and capabilities.
Product iteration showing old model POW-HVM6.2K-48V-LIP and new model POW-HVM6.2KP
Figure: Product iteration, showing the previous model POW-HVM6.2K-48V-LIP and the current POW-HVM6.2KP model.
Hybrid Power System diagram showing connections for solar, generator/utility, battery, and home appliances
Figure: Hybrid Power System diagram illustrating connections for solar panels, generator or utility grid, 48V lithium/lead-acid battery, and various home appliances. Max. VOC: 500V DC, PV Array MPPT Voltage Range: 60-500V DC, Max. PV Array Power: 8500W, Max Charging current: 120A (AC charger + solar charger), Single phase 230V output 6.2kW.

2. Safety Instructions

WARNING: This chapter contains important safety and operating instructions. Read and keep this manual for future reference.

  1. Before using the unit, read all instructions and cautionary markings on the unit, the batteries, and all appropriate sections of this manual.
  2. CAUTION: To reduce risk of injury, charge only deep-cycle lead acid type rechargeable batteries. Other types of batteries may burst, causing personal injury and damage.
  3. Do not disassemble the unit. Take it to a qualified service center when service or repair is required. Incorrect re-assembly may result in a risk of electric shock or fire.
  4. To reduce risk of electric shock, disconnect all wirings before attempting any maintenance or cleaning. Turning off the unit will not reduce this risk.
  5. CAUTION: Only qualified personnel can install this device with battery.
  6. NEVER charge a frozen battery.
  7. For optimum operation of this inverter/charger, please follow required specifications to select appropriate cable size. It's very important to correctly operate this inverter/charger.
  8. Be very cautious when working with metal tools on or around batteries. A potential risk exists to drop a tool to spark or short circuit batteries or other electrical parts and could cause an explosion.
  9. Please strictly follow installation procedure when you want to disconnect AC or DC terminals.
  10. One piece of 150A fuse is provided as over-current protection for the battery supply.
  11. GROUNDING INSTRUCTIONS: This inverter/charger should be connected to a permanent grounded wiring system. Be sure to comply with local requirements and regulations to install this inverter.
  12. NEVER cause AC output and DC input short circuited. Do NOT connect to the mains when DC input short circuits.
  13. Warning!! Only qualified service persons are able to service this device. If errors still persist after following troubleshooting table, please send this inverter/charger back to local dealer or service center for maintenance.

3. Setup and Installation

3.1 Unpacking and Inspection

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items:

  • The unit x 1
  • User manual x 1
  • Parallel communication cable x 1
  • Share current wires x 1
  • Expansion screw (M6*80mm) x 2
  • Battery fuse x 1

3.2 Mounting the Unit

Consider the following points before selecting where to install:

  • Do not mount the inverter on flammable construction materials.
  • Mount on a solid surface.
  • Install this inverter at eye level in order to allow the LCD display to be read at all times.
  • For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and approx. 50 cm above and below the unit.
  • The ambient temperature should be between 20℃ and 35°C to ensure optimal operation.
  • The recommended installation position is to be adhered to the wall vertically.
  • Be sure to keep other objects and surfaces as shown in the diagram to guarantee sufficient heat dissipation and to have enough space for removing wires.

SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.

Mounting diagram with clearances
Figure: Mounting clearances for the inverter. Ensure 20cm clearance on sides and 50cm above/below for proper ventilation.

Install the unit by screwing three screws:

  • Use M6*80mm expansion bolts for suspending and securing the equipment from above.
  • Use M4 or M5 screws in the 3 holes to secure the equipment, as shown in the figure.

NOTICE: To avoid potential damage to the terminal base and internal electronic components, it is recommended not to install screws in the mounting hole located at the lower left corner.

3.3 Grounding

Please make sure to connect the equipment grounding first, ensuring the device enclosure is reliably grounded before the system is powered on to effectively prevent personal injury caused by accidental leakage.

3.4 Battery Connection

CAUTION: For safety operation and regulation compliance, it's requested to install a separate DC over-current protector or disconnect device between battery and inverter. All wiring must be performed by qualified personnel. It's very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable and terminal size.

Rated CapacityTypical AmperageBattery CapacityWire SizeCable(mm²)Ring Terminal D(mm)Ring Terminal L(mm)Torque Value
6.2KVA143A200Ah1*2AWG388.439.25 Nm
2*4AWG258.433.2

Please follow below steps to implement battery connection:

  1. Assemble battery ring terminal based on recommended battery cable and terminal size.
  2. The 6.2KW model supports 48VDC battery systems. Connect all battery banks as shown in the diagram below.
  3. Insert the battery wires flatly into battery connectors of inverter and make sure the bolts are tightened with a torque of 2 Nm in a clockwise direction. Make sure polarity at both the battery and the inverter/charger is correctly connected and conductors are tightly screwed into the battery terminals.
Battery connection diagram with positive and negative terminals
Figure: Battery connection terminals. Ensure correct polarity: Red(+) to positive, Black(-) to negative.

3.5 AC Input/Output Connection

CAUTION: Before connecting to AC input power source, please install a separate AC breaker between the inverter and AC input power source. This will ensure the Inverter can be disconnected during maintenance and fully protected from over current of AC input. The recommended spec of breaker is 63A for 48V system. There are two terminal blocks with "IN" and "OUT" markings. Please do NOT mis-connect input and output connectors. All wiring must be performed by qualified personnel. It's very important for system safety and efficient operation to use appropriate cable for AC input connection. To reduce risk of injury, please use the proper recommended cable size.

Rated CapacityGaugeTorque Value
6.2KW10 AWG1.4~1.6 Nm

Please follow below steps to implement AC input/output connection:

  1. Before making AC input/output connection be sure to open DC protector or disconnector first.
  2. Remove insulation sleeve 10mm for six conductors. And shorten phase L and N 3 mm.
  3. Insert AC main output wires according to polarities indicated on terminal block and tighten terminal screws. Be sure to connect PE protective conductor (Grounding symbol) first.
  • Grounding symbol→Ground (yellow-green)
  • L→LINE (brown or black)
  • N→Neutral (blue)
AC input and output wiring diagram
Figure: AC input and output wiring connections. Ensure correct color coding for Ground, Line, and Neutral.

WARNING: Be sure that AC power source is disconnected before attempting to hardwire it to the unit.

3.6 PV Connection

CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between the inverter and PV modules. All wiring must be performed by qualified personnel. It's very important for system safety and efficient operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the proper recommended cable size.

Rated CapacityTypical AmperageGaugeTorque Value
6.2KW30A12 AWG1.4~1.6 Nm

When choosing the right PV module, be sure to first consider the following requirements:

  1. The open circuit voltage (Voc) of the PV modules does not exceed the maximum PV array open circuit voltage of the inverter.
  2. The maximum supply voltage of the PV modules should be close to the optimal PV access voltage range of the inverter for best performance. If one PV module cannot meet this requirement, it is necessary to connect multiple PV modules in series.
ModelPOW-HVM6.2KP
PV Charging ModeMPPT
MAX.PV Input Power8500W
MPPT Tracking Range60~500Vdc
Operating voltage360~430V
MAX.PV Input Voltage500Vdc
PV max input current27A
MAX.PV Charging Current120A
MAX.AC Charging Current100A
MAX. Charging Current120A

Please follow below steps to implement PV modules connection:

  1. Remove insulation sleeve 10 mm for positive and negative conductors.
  2. Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool.
  3. Insert PV input wires according to polarities indicated on terminal block and tighten the terminal screws.
  4. Check correct polarity of wire from PV modules and PV input connectors. Then, connect positive pole (+) of connection wire to positive pole (+) of PV input connector. Connect negative pole (-) of connection wire to negative pole (-) of PV input connector.
PV input wiring diagram
Figure: PV input wiring connections. Ensure correct polarity for PV input.

3.7 Final Assembly

After connecting all wirings, please install the bottom cover back by screwing four screws.

4. Operating Instructions

4.1 Power ON/OFF

Once the unit has been properly installed and the batteries are connected, follow the power-on sequence below to start the inverter safely:

  1. Close the battery circuit breaker.
  2. Press the On/Off switch (located on the bottom of the case) to turn on the unit. Wait until the inverter starts up and enters normal operation (inverting).
  3. Close the PV and AC input circuit breakers.
  4. Finally, close the AC output circuit breaker.

To shut down the system, turn off the circuit breakers in the reverse order.

Steps to Start Up

Connect the battery that meets the requirements (battery voltage needs to be beyond 46V) or AC (AC needs to confirm the suitable input range depending on the output mode), then you can start up the inverter.

  • Mains power on: Connect to normal AC power, press the switch, the system will automatically turn on. If you set AC output power priority, after waiting for a period of time, the panel will display AC mode that represents successful machine turn-on, then it will enter AC mode.
  • Battery boot: Connect to battery, press the power-on button to establish a working power source. The system will automatically turn on, after waiting for a period of time, the panel will display battery mode that represents successful machine turn-on, then it will enter battery mode.

Shutdown Steps

When the system is in battery mode or AC mode output, press the switch again, then the system will be turned off.

4.2 Operation and Display Panel

The operation and display panel, shown in the figure below, is on the front panel of the inverter. It includes three indicators, four function keys, and an LCD display, indicating the operating status and input/output power information.

LCD screen and buttons on the inverter
Figure: Front panel of the inverter showing the LCD display, status indicators, and control buttons (ESC, UP, DOWN, ENTER).
Function KeyDescription
ESCTo exit setting mode
UPTo go to previous selection
DOWNTo go to next selection
ENTERTo confirm the selection in setting mode or enter setting mode
LED IndicatorMessages
AC/INV (Green, Solid On)Output is powered by utility in Line mode.
AC/INV (Green, Flashing)Output is powered by battery or PV in battery mode.
CHG (Yellow, Solid On)Battery is fully charged.
CHG (Yellow, Flashing)Battery is charging.
FAULT (Red, Solid On)Fault occurs in the inverter.
FAULT (Red, Flashing)Warning condition occurs in the inverter.

4.3 LCD Display Icons and Information

The LCD display provides various information about the inverter's status, input/output, battery, and load. Information can be cycled through using the UP/DOWN keys.

Input Source Information

  • AC: Indicates the AC input.
  • PV1: Indicates the PV panel input.

Middle Digital Display Information

  • Indicates input voltage, input frequency, battery voltage, PV voltage, charger current.
  • Indicates the setting programs.
  • Indicates warning and fault codes.

Right Digital Display Information

  • Indicates the output voltage, output frequency, load percent, load VA, load W, PV charger power, DC discharging current.

Battery Information

  • Indicates battery level by 0-24%, 25–49%, 50–74%, 75–100% and charging status.
  • Indicates the battery type: AGM, Flooded or User-defined battery.

Load Information

  • Indicates overload.
  • Indicates the load level by 0–24%, 25–50%, 50–74% and 75%-100%.

Mode Operation Information

  • Indicates unit connects to the mains.
  • Indicates unit connects to the PV panel.
  • Indicates the solar charger is working.
  • Indicates the DC/AC inverter circuit is working.

Mute Operation

  • Indicates unit alarm is disabled.

4.4 LCD Setting Programs

After pressing and holding the ENTER button for 3 seconds, the unit will enter setting mode. Use the "UP" or "DOWN" buttons to select setting programs, and then press "ENTER" to confirm the selection or "ESC" to exit.

Key settings include:

  • Program 00: Exit setting mode.
  • Program 01: Output source priority selection:
    • SUB priority (default): Solar energy provides power to loads first. If insufficient, utility supplies power.
    • SBU priority: Solar energy provides power to loads first. If insufficient, battery supplies power. Utility only supplies power when battery voltage drops below a set level or solar/battery are insufficient.
  • Program 02: Maximum charging current: Configures total charging current for solar and utility chargers (10A to max, 10A increments).
  • Program 03: AC input voltage range:
    • Appliances (default): 90–280VAC.
    • UPS: 170–280VAC.
  • Program 04: AC output mode:
    • Single (default): For single phase operation.
    • Parallel: For parallel operation with single phase (select "PAL").
    • L1, L2, L3 phase: For three-phase equipment (requires at least 3 inverters, max 9).
  • Program 05: Battery type: Selects battery type (AGM, Flooded, User-Defined, LIA-protocol, Pylontech, Techfine, Growatt, Felicity, LIB-protocol, 3rd party lithium).
  • Program 06: Auto restart when overload occurs: Enable/Disable.
  • Program 07: Auto restart when over temperature occurs: Enable/Disable.
  • Program 08: ECO function: Temporarily stops system when load is low in battery mode (Enable/Disable).
  • Program 09: Output frequency: 50Hz or 60Hz.
  • Program 10: Output voltage: 220V, 230V, or 240V.
  • Program 11: Maximum utility charging current: Setting range is 2A, then from 10A to max AC charging.
  • Program 12: Setting voltage point back to utility source (SBU priority): 44V to 51V (1V increments).
  • Program 13: Setting voltage point back to battery mode (SBU priority): 48V to 58V (1V increments).
  • Program 16: Charger source priority:
    • Solar first: Solar energy charges battery first. Utility charges only when solar is unavailable.
    • Solar and Utility (default): Solar and utility charge battery simultaneously.
    • Only Solar: Solar energy is the only charger source.
  • Program 18: Auto return to default display screen: Enable/Disable.
  • Program 19: Stay at latest screen: Enable/Disable.
  • Program 20: Backlight control: On/Off.
  • Program 22: Beeps while primary source is interrupted: On/Off.
  • Program 23: Overload bypass: Enable/Disable.
  • Program 24: Battery low voltage: 40.0V-54.0V for 48V system.
  • Program 25: Record Fault code: Enable/Disable.
  • Program 26: Bulk charging voltage (C.V voltage): 48.0V to 60.0V for 48V system (0.1V increments).
  • Program 27: Floating charging voltage: 48.0V to 54.0V for 48V system (0.1V increments).
  • Program 28: Reset factory setting: Turn on/off.
  • Program 29: Low DC cut-off voltage: 40.0V to 52.0V for 48V system (0.1V increments).
  • Program 30: Battery equalization: Enable/Disable.
  • Program 31: Battery equalization voltage: 48.0V to 60.0V (0.1V increments).
  • Program 33: Battery equalized time: 5min to 900min (5min increments).
  • Program 34: Battery equalized timeout: 5min to 900min (5min increments).
  • Program 35: Equalization interval: 0 to 90 days (1 day increments).
  • Program 36: Equalization activated immediately: Enable/Disable.
  • Program 37: BMS Function Switch: On/Off.
  • Program 38: Bat Soc Under Lock: If any type of lithium battery is selected in program 05.
  • Program 39: Bat Soc Turn to AC: If any type of lithium battery is selected in program 05.
  • Program 40: Bat Soc Turn to DC: If any type of lithium battery is selected in program 05.
  • Program 41: Bat Restart Soc: If any type of lithium battery is selected in program 05.
  • Program 43: Solar supply priority: When solar energy is available, it will prioritize charging the battery or powering the loads.
  • Program 44: Solar energy feed to grid configuration: Enable/Disable.
  • Program 45: Reset PV energy storage: Reset.
  • Program 46: Start charging time for AC charger: 00:00 to 23:00 (1 hour increments).
  • Program 47: Stop charging time for AC charger: 00:00 to 23:00 (1 hour increments).
  • Program 48: Scheduled time for AC output on: 00:00 to 23:00 (1 hour increments).
  • Program 49: Scheduled time for AC output off: 00:00 to 23:00 (1 hour increments).
  • Program 50: Set country customized regulations: Various modes for feed-in grid voltage and frequency ranges.
  • Program 51-54: Time setting (Minute, Hour, Day, Month).
  • Program 55: Time setting (Year).
  • Program 56: GRID-tie current: 20A (1A increments).
  • Program 57: External CT Function: Not supported.
  • Program 58: Set the input power of mains power: 150W (Not supported).
  • Program 60: Dual output: Enable/Disable.
  • Program 61: Enter the dual output functional voltage point: 44.0V (0.1V increments).
  • Program 62: Enter the dual output functional SOC point: 20% (If any type of lithium battery is selected in program 05).
  • Program 63: Battery voltage recovery threshold for dual output: 52.0V (Default 52V).
  • Program 64: SOC recovery threshold for dual output: 50% (Default 50%).
  • Program 65: Setting discharge time on the second output: Disable to 990 min (5 min increments).
  • Program 66: Dual Recover Delay Time: 0-60min.
  • Program 67: Output Open Time: 0-23.
  • Program 68: Output Stop Time: 0-23.
  • Program 70: Set the Rated power: 6.5KW (100W increments).

5. Maintenance

5.1 Battery Equalization

Equalization function is added into the charge controller. It reverses the buildup of negative chemical effects like stratification, a condition where acid concentration is greater at the bottom of the battery than at the top. Equalization also helps to remove sulfate crystals that might have built up on the plates. If left unchecked, this condition, called sulfation, will reduce the overall capacity of the battery. Therefore, it's recommended to equalize battery periodically.

How to Apply Equalization Function

You must enable the battery equalization function in monitoring LCD setting program 30 first. Then, you may apply this function in the device by either one of the following methods:

  1. Setting equalization interval in program 35.
  2. Active equalization immediately in program 36.

When to Equalize

In this stage, when the setting equalization interval (battery equalization cycle) is reached, or equalization is active immediately, the controller will start to enter the Equalize stage.

Battery equalization charging stages diagram
Figure: Battery equalization charging stages (Bulk, Absorption, Float, Equalize).

Equalize charging time and timeout

In the Equalize stage, the controller will supply power to charge the battery as much as possible until the battery voltage raises to the battery equalization voltage. Then, constant-voltage regulation is applied to maintain the battery voltage at the battery equalization voltage. The battery will remain in the Equalize stage until the setting battery equalized time is reached.

However, in the Equalize stage, when the battery equalized time is expired and the battery voltage doesn't rise to the battery equalization voltage point, the charge controller will extend the battery equalized time until the battery voltage achieves the battery equalization voltage. If the battery voltage is still lower than the battery equalization voltage when the battery equalized timeout setting is over, the charge controller will stop equalization and return to the float stage.

6. Troubleshooting

6.1 Fault and Alarm Description

Faults Descriptions

If the inverter enters fault mode, the red LED light is always on and the LCD displays a fault code.

Fault CodeFault EventAction
01Fan is locked when inverter is off.Replace the fan.
02Over temperature or NTC is not connected well.Check whether the air flow of the unit is blocked or whether the ambient temperature is too high.
03Battery voltage is too high.Return to repair center. Check if battery specifications meet requirements.
04Battery voltage is too low.Return to repair center. Check if battery specifications meet requirements.
05Output short circuited or over temperature is detected by internal converter components.Check if wiring is connected well and remove abnormal load.
06Output voltage is too high.1. Reduce the connected load. 2. Return to repair center.
07Overload time out.Reduce the connected load by switching off some equipment.
08Bus voltage is too high.Return to repair center.
09Bus soft start failed.Return to repair center.
51Over currents or surge.Restart the unit. If the error happens again, please return to repair center.
52Bus voltage is too low.Restart the unit. If the error happens again, please return to repair center.
53Inverter soft start failed.Return to repair center.
55Over DC voltage in AC output.Return to repair center.
57Current sensor failed.Return to repair center.
58Output voltage is too low.1. Reduce the connected load. 2. Return to repair center.
59PV voltage is over limitation.Reduce the number of PV modules in series.

Warning Descriptions

If the red LED flashes, and the LCD displays an alarm code, the inverter does not enter the failure mode.

Warning CodeWarning EventAudible Alarm
01Fan is locked when inverter is on.Beep three times every second
02Over temperatureNone
03Battery is over-chargedBeep once every second
04Low batteryBeep once every second
07OverloadBeep once every 0.5 second
10Output power deratingBeep twice every 3 seconds
15PV energy is low.Beep twice every 3 seconds
16High AC input (>280VAC) during BUS soft startNone
E9Battery equalizationNone
bPBattery is not connectedNone

Code Reference (Communication)

Related information code will be displayed on the LCD screen. Please check the inverter LCD screen for the operation.

CodeDescription
60If battery status is not allowed to charge and discharge after successful communication between the inverter and battery, code 60 will show to stop charging and discharging battery.
61Communication lost. After battery is connected, communication signal is not detected for 1 minute, buzzer will beep. Communication lost occurs after the inverter and battery are connected successfully, buzzer beeps immediately.
69If battery status is not allowed to charge after successful communication between the inverter and battery, code 69 will show to stop charging battery.
70If battery status must charge after successful communication between the inverter and battery, code 70 will show to charge battery.
71If battery status is not allowed to discharge after successful communication between the inverter and battery, code 71 will show to stop discharge battery.
72Current sharing fault.
80CAN fault.
81Host loss.
82Synchronization loss.
83Battery voltage detected different.
84AC input voltage and frequency detected different.
85AC output current unbalance.
86AC output mode setting is different.

7. Technical Specifications

FeatureSpecification (POW-HVM6.2KP)
AC Input
Input SourcesL+N+PE
Rated Input Voltage220/230/240VAC
Voltage Range90-280VAC±3V (APL Mode); 170-280VAC±3V (UPS Mode)
Frequency50Hz/60Hz (Auto Adaptive)
Inverter Output
Rated Power (Battery Inverter)6200W
Rated Power (Photovoltaic Inverter)6500W
Output Voltage220/230/240VAC±5%
Output Frequency50Hz/60Hz±0.1%
WaveformPure Sine Wave
Transfer Time (Adjustable)Computers (UPS Mode) 10ms, Appliance (APL Mode) 20ms
Peak Power12400VA
Overload CapacityBattery mode: 11s@105%~150%Load; 2s@150%~200%Load; 400ms@>200%Load
Grid-Connected Operation
Output Voltage220/230/240VAC±5%
Feed Into the Grid Voltage Range100-280VA
Feed Into the Grid Frequency Range47-53±1Hz/57-62±1Hz
Nominal Output Current26.9A
Power Factor Range>0.99
Maximum Conversion Efficiency (DC/AC)98%
Battery
Battery Voltage48Vdc
Constant Charging Voltage (Adjustable)56.4Vdc
Float Charging Voltage (Adjustable)54Vdc
PV Input
PV Charging ModeMPPT
MAX. PV Input Power8500W
MPPT Tracking Range60~500Vdc
Operating Voltage360~430V
MAX. PV Input Voltage500Vdc
PV Max Input Current27A
MAX. PV Charging Current120A
MAX. AC Charging Current100A
MAX. Charging Current120A
Display
LCD InterfaceCAN display running mode/load/input/output, etc.
Interface
RS232Baud Rate 2400
Extend the SocketLithium Battery BMS Communication Card, WiFi Card, Dry Contact
Communication InterfaceParallel Machine (network) function
General Specifications
Operating Temperature-10°C~50°C
Humidity20%~95% (Non-condensing)
Storage Temperature-15°C~60°C
AltitudeNot Over 1000m, Derating over 1000m, Max 4000m, Refer to IEC62040
Noise≤50db
Standards and CertificationEN-IEC 60335-1, EN IEC 60335-2-29, IEC 62109-1
Size450x300x130 mm
Weight9.6KG

8. Parallel Function (Appendix I)

8.1 Mounting the Unit for Parallel Operation

When installing multiple units, ensure proper clearances for air circulation: approx. 20 cm to the side and approx. 50 cm above and below each unit. All units must be installed at the same level.

Parallel mounting diagram with clearances
Figure: Mounting diagram for multiple inverters in parallel. Maintain 50cm top/bottom and 20cm side clearances.

8.2 Wiring Connection for Parallel Operation

NOTICE: It's required to connect to battery for parallel operation. The cable size for each inverter is shown in the table below.

Rated CapacityWire SizeCable(mm²)Ring Terminal D(mm)Ring Terminal L(mm)Torque Value
6.2KW1*2AWG388.439.22-3Nm

WARNING: Be sure the length of all battery cables is the same. Otherwise, there will be voltage difference between inverter and battery to cause parallel inverters not working.

You need to connect the cables of each inverter together. For battery cables, use a connector or bus-bar as a joint to connect the battery cables together, and then connect to the battery terminal. The cable size used from the joint to the battery should be X times the cable size in the tables above, where "X" is the number of inverters connected in parallel. The same principle applies to AC input and output wiring.

CAUTION: Make sure all output N wires of each inverter must be connected all the time. Otherwise, it will cause inverter fault (error code #72). Please install the breaker at the battery and AC input side. This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of battery or AC input.

Recommended Breaker Specification of Battery for Each Inverter
Rated Capacity1 unit*
6.2KW150A/70VDC

*If you want to use only one breaker at the battery side for the whole system, the rating of the breaker should be X times current of 1 unit. "X" indicates the number of inverters connected in parallel.

Recommended Breaker Specification of AC Input with Single Phase
Rated Capacity2 units3 units4 units5 units6 units7 units8 units9 units
6.2KW80A/230VAC120A/230VAC160A/230VAC200A/230VAC240A/230VAC280A/230VAC320A/230VAC360A/230VAC

Note 1: Also, a circuit breaker should be installed at the AC input of each inverter, and the selection of the circuit breaker should refer to the AC input current of the machine nameplate.

Note 2: Regarding three-phase system, you can use a 4-pole breaker directly and the rating of the breaker should be compatible with the phase current limitation from the phase with maximum units.

8.3 PV Connection for Parallel Operation

NOTE: Each inverter should be connected to an independent photovoltaic array. Multiple inverters must not share the same photovoltaic array, as this may cause irreversible damage to the inverters.

Parallel PV connection diagram
Figure: PV connection for parallel operation. Each inverter has its own PV input.

8.4 Commissioning Parallel Units

Parallel in single phase:

Step 1: Check the following requirements before commissioning:

  • Correct wire connection.
  • Ensure all breakers in Line wires of load side are open; each Neutral wire of each unit is connected together.

Step 2: Turn on each unit and set "PAL" in LCD setting program 4 of each unit. Then shut down all units.

NOTE: It's necessary to turn off the switch when setting the LCD program. Otherwise, the setting cannot be programmed.

Step 3: Turn on each unit.

NOTE: Master and slave units are randomly defined.

9. User Tips

  • The inverter's output voltage is 220V, 230V, or 240V, configurable via LCD settings (Program 10). This addresses questions about the 220V output.
  • The inverter supports Wi-Fi monitoring, which can be enabled or disabled via LCD settings (Program 175:353309 for No Wi-Fi, 175:353310 for With Wi-Fi).
  • For optimal performance and safety, always ensure all wiring is done by qualified personnel and follows the recommended cable sizes and torque values.
  • When operating in parallel, ensure all battery cables are of the same length to prevent voltage differences that could affect performance.
  • The new inverter model (POW-HVM6.2KP) cannot be used in parallel with older inverter models.

10. Warranty and Support

For technical support, service, or warranty inquiries, please contact the manufacturer directly using the information below. This manual does not cover specific warranty terms or conditions.

Manufacturer Contact Information

  • Company: SHENZHEN HEHEJIN INDUSTRIAL CO.,LTD
  • Tel/Fax: +86755-28219903
  • Email: support@powmr.com
  • Web: www.powmr.com
  • Address: Henggang Street, Longgang District, Shenzhen, Guangdong, China 55304-200-931

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.