Daxtromn AGH-4.2KW AGH-6.2KW

Contents

Daxtromn Hybrid Solar Inverter User Manual

Models: AGH-4.2KW-BMS & AGH-6.2KW-BMS

1. Introduction

Thank you for choosing the Daxtromn Hybrid Solar Inverter. This manual provides essential information for the safe and efficient installation, operation, and maintenance of your AGH-4.2KW-BMS or AGH-6.2KW-BMS hybrid solar inverter. Please read this manual thoroughly before installation and operation to ensure optimal performance and safety.

Daxtromn AGH-4.2KW/6.2KW-PRO Hybrid Solar Inverter
Daxtromn AGH-4.2KW/6.2KW-PRO Hybrid Solar Inverter with key features highlighted.

The Daxtromn Hybrid Solar Inverter is a versatile device designed to integrate solar power, utility power, and battery power to supply electricity to your home or business. It features a pure sine wave output, high MPPT solar charging capabilities, and supports Battery Management System (BMS) communication for enhanced battery life and safety.

2. Key Features

  • Pure Sine Wave Solar Inverter
  • Max 120A MPPT Solar Charger
  • Max 500VDC PV Input
  • Dual Load Output (2 AC outputs)
  • Support for Battery Management System (BMS) communication
  • High PV input voltage range (120~450VDC)
  • Output power factor 1.0
  • Real Hybrid Solar inverter for 24V/48V systems
  • Integrated Wi-Fi Module for easy connection
  • Efficient operation with or without battery
  • Bundled monitoring & setting software
  • Supports 50Hz or 60Hz (program adjustable)
  • Compatible with AC grid or generator power
  • Built-in anti-dust kit for harsh environments
  • Optional DC output for DC fans, LED bulbs, routers, etc.
Video showcasing the Daxtromn Hybrid Solar Inverter, highlighting RGB lights, touch button LCD, dual output, 140A MPPT, high PV input voltage, and built-in anti-dust kit.

3. Product Overview

Familiarize yourself with the inverter's components and connection points.

Product Overview Diagram
Product Overview diagram labeling key components of the inverter.
  1. LCD display
  2. Status indicator
  3. Charging indicator
  4. Fault indicator
  5. Function buttons
  6. Power on / off switch
  7. AC input
  8. Main output
  9. Second output
  10. Battery input
  11. PV input
  12. RS-232 communication port/WIFI-port
  13. RS485 BMS Port
  14. Circuit breaker

4. Technical Specifications

Detailed specifications for the AGH-4.2KW-BMS and AGH-6.2KW-BMS models are provided below.

Comprehensive Technical Specifications Table
Comprehensive technical specifications for AGH-4.2KW-BMS and AGH-6.2KW-BMS models.
ParameterAGH-4.2KW-BMSAGH-6.2KW-BMS
Phase1-Phase
Maximum PV Input Power6200W6500W
Rated Output Power4200W/4200VA6200W/6200VA
Maximum Solar Charging Current120A
GRID-TIE OPERATION (PV Input)
Nominal DC Voltage/Maximum DC Voltage360VDC/500VDC
Start-up Voltage/Initial Feeding Voltage90VDC/120VDC
MPPT Voltage Range90~450VDC
Number of MPPT/Max Input Current1/22A
GRID OUTPUT (AC)
Nominal Output Voltage220/230/240VAC
Output Voltage Range195.5~253VAC
Nominal Output Current15.7A27.0A
Power Factor>0.99
Feed-in Grid Frequency Range49~51±1Hz
EFFICIENCY
Max Conversion Efficiency (Solar to AC)98%
TWO LOAD OUTPUT POWER (V2.0)
Full Load4200W6200W
Maximum Main Load4200W6200W
Max Second Load (battery mode)1200W2067W
Main Load Cut Off Voltage22VDC44VDC
Main Load Return Voltage26VDC52VDC
OFF-GRID OPERATION (AC Input)
AC Start-up Voltage/Auto Restart Voltage120-140VAC/180VAC
Acceptable Input Voltage Range90-280VAC or 170-280VAC
Maximum AC Input Current30A40A
Nominal operating frequency50/60Hz
Surge power7200W12400W
BATTERY & CHARGER
Nominal DC Voltage24VDC48VDC
Maximum Solar Charging Current120A
Maximum AC Charging Current100A
PHYSICAL
Dimension (D*W*H)110*334*423 mm
Net Weight (Kgs)9 kg10 kg
INTERFACE
Communication PortRS232/WIFI/RS485
ENVIRONMENT
Operating Temperature-10~50℃

5. Safety Guidelines

  • All wiring must be performed by qualified personnel.
  • Install a separate AC breaker between the inverter and the AC input power source. This ensures secure disconnection during maintenance and protection from overcurrent.
  • Do not mis-connect input and output connectors.
  • Install a separate DC over-current protector or disconnect device between the battery and inverter.
  • Use appropriate cable sizes for AC input, battery, and PV connections to reduce risk of injury and ensure efficient operation.
  • WARNING: Do NOT connect the second output to the grid. This will damage your inverter.

6. Installation

6.1. Connection Diagram

The inverter can be connected to various power sources and loads as shown in the diagram below.

Inverter Connection Diagram
Connection Diagram illustrating how solar power, generator, utility, and external battery packs connect to the inverter to power home appliances.

6.2. AC Input/Output Connection

CAUTION!! Before connecting to AC input power source, please install a separate AC breaker between inverter and AC input power source. This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of AC input. The recommended spec of AC breaker is 32A for 3.6KW and 50A for 6.2KW.

CAUTION!! There are two terminal blocks with “IN” and “OUT” markings. Please do NOT mis-connect input and output connectors.

WARNING! All wiring must be performed by a qualified personnel.

WARNING! It’s very important for system safety and efficient operation to use appropriate cable for AC input connection. To reduce risk of injury, please use the proper recommended cable size as below.

AC Input/Output Connection Diagram and Cable Requirements
AC Input/Output Connection instructions, cautions, warnings, and suggested cable requirements for AC wires.

6.3. Battery Connection

CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC over-current protector or disconnect device between battery and inverter. It may not be requested to have a disconnect device in some applications, however, it’s still requested to have over-current protection installed. Please refer to typical amperage in below table as required fuse or breaker size.

WARNING! All wiring must be performed by a qualified personnel.

WARNING! It’s very important for system safety and efficient operation to use appropriate cable for battery connection. To reduce risk of injury, please use the proper recommended cable size as below.

Battery Connection Diagram and Cable Requirements
Battery Connection instructions, cautions, warnings, recommended battery cable size, and wiring diagrams for 3.6KW and 6.2KW inverters with 12V batteries.

6.4. PV Connection

CAUTION: Before connecting to PV modules, please install separately a DC circuit breaker between inverter and PV modules. WARNING! It’s very important for system safety and efficient operation to use appropriate cable for PV module connection. To reduce risk of injury, please use the proper recommended cable size as below.

PV Connection Diagram and Cable Requirements
PV Connection instructions, cautions, warnings, suggested cable requirements for PV module connection, and PV module selection parameters.

7. Operation

7.1. Setting Up OFF Grid or Hybrid Mode (Program 37)

The inverter offers both Off-Grid and Hybrid operating modes. You can configure this setting via Program 37 on the LCD display.

OFF Grid or Hybrid Mode Setup
Setup instructions for OFF Grid or Hybrid Mode (Program 37) with display examples.
  • Off Grid (default): Inverter operates only in off-grid mode. Solar energy provides power to the loads as first priority and charging second.
  • Hybrid: Inverter operates in hybrid mode. Solar energy provides power to the loads as first priority and charging second. Excess energy can be fed to the grid.

NOTE: The default mode is OFF GRID mode (Will not send energy to network).

7.2. Output Source Priority (Program 01)

Configure the load power source priority using Program 01.

Output Source Priority Configuration
Output Source Priority configuration (Program 01) with options for Utility first, Solar first, and SBU priority.
  • Utility first: Utility will provide power to the loads as first priority. Solar and battery energy will provide power to the loads only when utility power is not available.
  • Solar first (default): Solar energy provides power to the loads as first priority. If solar energy is not sufficient to power all connected loads, utility will supply power to the loads at the same time. Battery provides power to the loads only when any one condition happens: Solar energy and utility is not available, or Solar energy is not sufficient and utility is not available.
  • SBU priority: Utility provides power to the loads only when battery voltage drops to either low-level warning voltage or the setting point in program 12.

7.3. LED Indicators and Function Keys

Understand the status indicators and how to navigate the inverter's settings.

LED Indicator and Function Keys Table
LED Indicator messages and Function Keys descriptions.
LED IndicatorStatusMessages
INV/AC (Green)Solid OnOutput is powered by utility in Line mode.
FlashingOutput is powered by battery or PV in battery mode.
CHG (Green)Solid OnBattery is fully charged.
FlashingBattery is charging.
FAULT (Red)Solid OnFault occurs in the inverter.
FlashingWarning condition occurs in the inverter.
Function KeyDescription
ESCTo exit setting mode
UPTo go to previous selection
DOWNTo go to next selection
ENTERTo confirm the selection in setting mode or enter setting mode

8. Maintenance

  • Regularly inspect all connections for tightness and corrosion.
  • Keep the inverter's ventilation openings clear of dust and debris. The built-in anti-dust kit helps, but periodic cleaning is recommended, especially in harsh environments.
  • Ensure the inverter is installed in a well-ventilated area to prevent overheating.
  • Monitor the LCD display for any fault indicators and refer to the troubleshooting section if issues arise.
  • For any complex maintenance or repairs, contact qualified service personnel.

9. Troubleshooting

This section addresses common questions and potential issues.

  • Inverter not turning on or no output: Check all power connections (AC input, battery, PV input). Ensure the power on/off switch is in the 'on' position. Verify PV input voltage is above the minimum required (150V without battery, 120V with battery).
  • Fault indicator is on: Refer to the LED Indicator table in Section 7.3 for specific fault messages and take appropriate action.
  • Battery not charging: Check solar panel connections and output. Verify AC input if charging from grid. Ensure battery voltage is within the inverter's operating range.
  • BMS communication issues: Ensure both the inverter and the battery have compatible BMS functions and are correctly connected via the RS485 BMS Port.
  • No power to secondary AC output: If the main AC output has cut off due to low battery or no PV/mains input, the secondary AC output should still be active. If not, check the inverter's settings and connections.

10. User Tips

  • PV Input Voltage: For optimal performance and to ensure the inverter starts correctly, make sure your solar panel array provides a DC voltage above 150V if operating without an external battery, or above 120V if an external battery is connected.
  • Secondary AC Output: The secondary AC output is designed to provide continuous power to critical loads even when the main AC output is disconnected due to low battery or lack of primary power sources. Never connect this secondary output to the utility grid. Doing so will damage the inverter.
  • BMS Compatibility: To utilize the advanced battery management features, ensure that both your inverter and your battery system are equipped with compatible BMS functionality and are properly connected.
  • Monitoring: Use the integrated Wi-Fi module and monitoring software to keep track of your system's performance and energy flow.

11. Warranty and Support

The Daxtromn Hybrid Solar Inverter comes with a 1-year warranty from the date of purchase. This warranty covers defects in materials and workmanship under normal use and service. It does not cover damage resulting from improper installation, misuse, unauthorized modifications, or natural disasters.

For technical support, warranty claims, or service inquiries, please contact your authorized Daxtromn dealer or visit the official Daxtromn website for contact information.

© 2024 Daxtromn. All rights reserved.


Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.