VEVOR VV-DAD-50L

Rate this product if you’ve used it
Contents

VEVOR 50L Alcohol Distiller Machine Instruction Manual

Model: VV-DAD-50L

Introduction

This manual provides detailed instructions for the safe and efficient operation, setup, and maintenance of your VEVOR 50L Alcohol Distiller Machine. Please read this manual thoroughly before use and retain it for future reference.

Play video
Watch video online

Video: Overview of the VEVOR 50L Alcohol Distiller Machine components and features.

Product Specifications

SpecificationValue
ModelVV-DAD-50L
MaterialStainless Steel + Red Copper
Distillation Period2~3 Hours
Boiler Barrel Capacity13.2 Gal (50 L)
Boiler Barrel SizeΦ15.7x15.7 in (Φ40x40 cm)
Condenser Keg Capacity0.92 Gal (3.5 L)
Condenser Keg SizeΦ7.9x4.7 in (Φ20 x 12 cm)
Thumper Keg SizeΦ7x4 in (Φ18x10 cm)
Barrel Thickness0.03 in (0.7 mm)
Copper Coil Diameter0.39 in (10 mm)
Product Weight15.3 lbs (6.92 kg)
Product specifications diagram with dimensions

Image: Detailed product specifications and dimensions.

Package Contents

Verify that all items are present and in good condition before assembly.

  • 1 x Fermentation Barrel
  • 1 x Condenser Keg
  • 1 x Thumper Keg
  • 1 x Water Pump
  • 1 x Thermometer
  • 1 x One-way Air Evacuation Valve
  • 1 x Set of Accessories (silicone tubes, sealing rings, clamps, etc.)
  • 1 x User Manual (this document)
All components included in the VEVOR distiller package

Image: All components included in the package.

Setup Instructions

  1. Assemble the Main Unit:

    • Place the fermentation barrel on a stable, heat-resistant surface.
    • Position the condenser keg and thumper keg on top of the fermentation barrel lid, ensuring they are securely seated.
    Assembled VEVOR alcohol distiller unit

    Image: Overview of the assembled distiller.

  2. Ensure Proper Sealing:

    • Place the silicone cushion ring around the rim of the fermentation barrel before securing the lid.
    • Fasten the four upgraded sealing buckles firmly to ensure a tight seal.
    • Connect all silicone tubes to their respective ports, ensuring they are pliable and securely attached to prevent leaks.
    Close-up of silicone cushion ring and sealing buckles

    Image: Demonstrating the silicone cushion ring and sealing mechanism.

  3. Install Thermometer:

    • Insert the provided thermometer into its designated port on the lid of the fermentation barrel. Ensure it is securely in place for accurate temperature readings.
    Thermometer installed on the distiller lid

    Image: Thermometer for monitoring real-time temperature.

  4. Connect Water Pump for Cooling:

    • Connect the circulating water pump to the silicone tubes for water circulation. The pump promotes water circulation for efficient cooling.
    • Ensure the cold water inlet and hot water outlet are correctly connected to the condenser keg.
    Energy-efficient water pump for cooling

    Image: The energy-efficient water pump for cooling circulation.

  5. Install One-way Air Evacuation Valve:

    • Attach the one-way air evacuation valve to its designated port on the lid. This valve releases air during fermentation.
    One-way air evacuation valve installation

    Image: One-way air evacuation valve for fermentation.

Operating Instructions

  1. Prepare Raw Materials:

    • Add your desired raw materials (e.g., fruit mash, fermented grains) into the fermentation barrel. Ensure the volume does not exceed the maximum capacity of 13.2 gallons (50 L).
  2. Apply Heat:

    • Place the distiller on a suitable heat source. The thickened bottom supports various heating methods, including gas stoves, firewood, and electric ceramic heaters.
    • Begin heating the fermentation barrel.
    Various heating methods for the distiller

    Image: The distiller supports multiple heating methods.

  3. Monitor Temperature:

    • Continuously monitor the temperature using the built-in thermometer.
    • When the temperature reaches approximately 80°C (176°F), activate the circulating water pump to begin cooling the condenser. Ensure a steady flow of cold water into the lower inlet and hot water out of the upper outlet.
  4. Utilize Thumper Keg (Optional for Flavoring):

    • If desired, add spices, herbs, or other flavoring agents to the thumper keg before starting the distillation process. This allows the vapor to pass through and infuse with the added flavors.
    Thumper keg for adding flavors

    Image: The thumper keg allows for adding spices or flavors.

  5. Collect Distillate:

    • The cooled vapor will condense into liquid and exit through the distillate outlet. Collect the distillate in a suitable container.

Maintenance

  1. Cleaning After Each Use:

    • After each distillation, allow the unit to cool completely.
    • Disassemble the components and thoroughly clean all parts (fermentation barrel, condenser keg, thumper keg, tubes) with warm water and a mild, food-safe detergent.
    • Rinse all components thoroughly to remove any residue.
    • Dry all parts completely before storage to prevent corrosion.
  2. Inspect Seals and Tubes:

    • Regularly inspect the silicone cushion rings and tubes for any signs of wear, cracks, or damage. Replace them if necessary to maintain a tight seal.
  3. Water Pump Care:

    • The circulating water pump is designed for durability and reusability. Ensure it is kept clean and free from debris to maintain optimal performance. No special tools are required for detachment or cleaning.

Troubleshooting

  • Leaks during operation:

    • Check all sealing points, including the silicone cushion ring and the four buckles on the lid. Ensure they are properly seated and tightened.
    • Inspect all silicone tube connections for secure attachment.
    • Examine silicone tubes for any cuts or damage and replace if found.
  • Inefficient cooling:

    • Verify that the circulating water pump is operating correctly and that water is flowing through the condenser.
    • Ensure the cold water supply is adequate and the hot water is being discharged efficiently.
    • Check for any blockages in the cooling lines.
  • Inaccurate temperature readings:

    • Ensure the thermometer is fully inserted and securely positioned in its port.
    • If discrepancies persist, consider calibrating or replacing the thermometer.
  • No distillate or low yield:

    • Confirm that the heat source is sufficient and the temperature is reaching the required distillation point.
    • Check for any blockages in the vapor path or condenser.
    • Ensure the system is properly sealed to prevent vapor escape.

User Tips

  • Always operate the distiller in a well-ventilated area to prevent the buildup of fumes.
  • For optimal results, maintain a consistent heat source and closely monitor the temperature.
  • Experiment with different spices and herbs in the thumper keg to customize the flavor of your distillates.
  • This model has a 50L capacity. If you require a larger capacity, please check for other available VEVOR models.

Warranty and Support

For warranty information, technical support, or any questions regarding your VEVOR 50L Alcohol Distiller Machine, please contact the manufacturer or your point of purchase. Keep your purchase receipt as proof of purchase.


Documents and downloads

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.

Was this page helpful?