TECNR SR30 plus, ST30 plus

Contents

User Manual: S7-200 SMART PLC Programmable Controller

Model: SR30 plus / ST30 plus

Brand: TECNR

1. Introduction

This manual provides essential information for the installation, operation, and maintenance of the TECNR S7-200 SMART PLC Programmable Controller. This device is designed for industrial automation applications, offering reliable control with various input/output configurations.

The S7-200 SMART PLC is available in two main variants:

  • SR30 plus: Relay type, 220VAC power supply.
  • ST30 plus: Transistor type, 24VDC power supply.

Both models feature 18 digital inputs and 12 digital outputs, along with an Ethernet port and one RS 485 interface for communication.

S7-200 SMART PLC CPU SR40 unit with RS485 X20 port
Figure 1: Overview of an S7-200 SMART PLC CPU unit (SR40 shown as example, similar to SR30/ST30 plus).

2. Setup and Installation

2.1 Power Supply Connection

  • SR30 plus: Connect to a 220VAC power source.
  • ST30 plus: Connect to a 24VDC power source.
  • Ensure proper grounding and adhere to all local electrical safety codes.

2.2 Wiring Digital Inputs and Outputs

The PLC features 18 digital inputs (DI) and 12 digital outputs (DO). Refer to the specific model's wiring diagram for detailed connections. Digital inputs are typically used for sensors, switches, and other control signals. Digital outputs are used to control actuators, relays, and indicators.

2.3 Communication Interfaces

The PLC includes an Ethernet port and an RS 485 interface for communication. These ports allow for programming, monitoring, and integration with other industrial devices.

  • Ethernet Port: Used for network communication, programming, and data exchange.
  • RS 485 Interface: A serial communication interface, often used for connecting to HMI panels or other PLCs in a multi-drop network.

2.4 Software Installation

The PLC is programmed using the STEP 7-Micro/WIN SMART V2.6 software. Install this software on your programming PC before attempting to configure the PLC.

Siemens STEP 7-Micro/WIN SMART Version V2.6 software splash screen
Figure 2: STEP 7-Micro/WIN SMART V2.6 software interface.

3. Operation

3.1 Powering On

Once all connections are secure, apply power to the PLC. The RUN/STOP/ERROR indicators on the front panel will show the current status.

3.2 Programming the PLC

Use the STEP 7-Micro/WIN SMART V2.6 software to create, download, and monitor your PLC programs. Connect your PC to the PLC via the Ethernet or RS 485 port.

  1. Launch STEP 7-Micro/WIN SMART V2.6.
  2. Create a new project or open an existing one.
  3. Write your ladder logic or function block diagram program.
  4. Configure communication settings to connect to the PLC.
  5. Download the program to the PLC.
  6. Switch the PLC to RUN mode to execute the program.

3.3 Status Indicators

The front panel of the CPU unit includes LED indicators:

  • RUN: Indicates the PLC is in run mode and executing the program.
  • STOP: Indicates the PLC is in stop mode.
  • ERROR: Indicates a fault or error condition. Refer to the software for detailed error messages.

4. Maintenance

  • Regular Inspection: Periodically check all wiring connections for tightness and signs of wear or damage.
  • Environmental Control: Ensure the operating environment is within specified temperature and humidity ranges to prevent damage. Keep the unit free from dust and moisture.
  • Firmware Updates: Check the manufacturer's website for any available firmware updates for the PLC. Follow update instructions carefully.
  • Backup Programs: Regularly back up your PLC programs to prevent data loss.

5. Troubleshooting

Problem Possible Cause Solution
PLC not powering on No power supply; incorrect voltage; faulty wiring. Check power connections and voltage (220VAC for SR30 plus, 24VDC for ST30 plus). Verify wiring.
ERROR LED is on Program error; hardware fault; communication issue. Connect to the PLC with STEP 7-Micro/WIN SMART V2.6 to diagnose the error. Check hardware connections.
Cannot connect to PLC via software Incorrect communication settings; faulty cable; network issue. Verify IP address/RS485 settings. Check Ethernet/RS485 cable. Ensure PC firewall is not blocking connection.
Outputs not activating Program logic error; faulty output module; incorrect wiring. Review program logic. Check output wiring and external devices. Test output module if possible.

6. Specifications

Feature Description
Brand Name TECNR
Application General Industrial Automation
Origin Mainland China
Certification None (as per provided data)
Model Variants SR30 plus (Relay type), ST30 plus (Transistor type)
Digital Inputs (DI) 18
Digital Outputs (DO) 12
Power Supply (SR30 plus) 220VAC
Power Supply (ST30 plus) 24VDC
Communication Ports 1x Ethernet, 1x RS 485 interface
Programming Software STEP 7-Micro/WIN SMART V2.6
Package Dimensions (approx.) Length: 18 cm, Width: 12 cm, Height: 10 cm
Package Weight (approx.) 0.58 kg

6.1 Compatible Modules

The S7-200 SMART PLC supports various expansion modules for enhanced functionality:

Digital Modules:

Table of Digital Modules for S7-200 SMART PLC, including EM DE08 (8DI), EM DE16 (16DI), EM DT08 (8DO transistor), EM DR08 (8DO relay), EM QT16 (16DO transistor), EM QR16 (16DO relay), EM DT16 (8DI, 8DO transistor), EM DR16 (8DI, 8DO relay), EM DT32 (16DI, 16DO transistor), EM DR32 (16DI, 16DO relay).
Figure 3: Digital Input/Output Modules.

Analog Modules:

Table of Analog Modules for S7-200 SMART PLC, including EM AE04 (4AI), EM AE08 (8AI), EM AQ02 (2AO), EM AQ04 (4AO), EM AM03 (2AI, 1AO), EM AM06 (4AI, 2AO).
Figure 4: Analog Input/Output Modules.

Temperature Modules:

Table of Temperature Modules for S7-200 SMART PLC, including EM AR02 (2 thermal resistance detection inputs) and EM AR04 (4-way thermal resistance detection input).
Figure 5: Temperature Modules.

Signal Boards:

Table of Signal Boards for S7-200 SMART PLC, including SB CM01 (Standard RS485/RS232), SB CM01 485BA (RS485 with battery), SB CM01 ISO485 (Isolated RS485), SB CM01 232 (RS232), SB DT04 (2DI, 2DO transistor), SB AM03 (2AI, 1AO).
Figure 6: Communication and Digital/Analog Signal Boards.

7. User Tips

  • Always ensure the correct power supply voltage is used for your specific PLC model (220VAC for SR30 plus, 24VDC for ST30 plus) to prevent damage.
  • When connecting communication cables, ensure they are securely fastened to avoid intermittent connections.
  • For complex automation tasks, consider utilizing the various expansion modules (digital, analog, temperature, signal boards) to extend the PLC's capabilities.
  • Regularly save your PLC programs to an external drive or cloud storage to protect against accidental loss.

8. Warranty and Support

For warranty information, technical support, or service inquiries, please contact your vendor or the manufacturer directly. Keep your purchase records handy when seeking support.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.

After a successful submission, we securely hash the supplied account or form email before sending it to Microsoft Advertising for conversion attribution. Privacy details.