Interface LCA-1 Load Cell Analyzer

Specifications
| Insulation Resistance (IR) pass criterion | Resistance from load cell flexure to internal wiring must be greater than 1 Gigaohm to pass. |
|---|---|
| Insulation Resistance test voltage | 50 VDC low-current test voltage is applied during the IR test. |
Quick Guide &Use
- For load cells with pigtail wire ends, attach the pigtail adapter and secure it with the included screws.
- Raise the orange tabs on the connector and insert wires into the front of the connector as follows (pins 1–7): Pin 1 Bridge Excite +, Pin 2 Bridge Signal +, Pin 3 Bridge Signal –, Pin 4 Bridge Excite –, Pin 5 TEDs Data (if present), Pin 6 TEDs Ground (if present), Pin 7 Cable Shield Wire (if present).
- Connect the AC adapter to the power connector on the back of the analyzer and plug the adapter into a 120VAC outlet.
- Wait for the self-test to complete and confirm the lower-right display shows “Ready To Test”.
- Bridge Analysis: Click “CHANGE LOAD CELL SETTINGS”, select the bridge resistance, excitation voltage, and required test parameters, then click “OK”. Click “ANALYZE BRIDGE”.
- Click “CHECK ZERO” to monitor zero balance and check wiring polarity for tension/compression output.
- Insulation Resistance Test: Attach the flexure detect module cable to the front connector of the analyzer; connect the module’s two contacts to a bare-metal surface of the load cell frame. Connect the load cell output to the bridge connector. Press “INSULATION TEST” and press “CONTINUE” when “FLEXURE DETECTED” appears.
Setup
This procedure describes how to set up and use the LCA-1 Load Cell Analyzer.
- For load cells with pigtail wire ends, attach the pigtail adapter as shown. Secure in place with the included screws.
Pigtail wiring (Left to Right)Pin 1 = Bridge Excite +
Pin 2 = Bridge Signal +
Pin 3 = Bridge Signal –
Pin 4 = Bridge Excite –
Pin 5 = TEDs Data (if present)
Pin 6 = TEDs Ground (if present)
Pin 7 = Cable Shield Wire (if present)Raise the orange tabs to insert or remove wires from connector. Wires are inserted into the front of the connector.
- Connect the AC adapter to the power connector on the back of the analyzer. Plug adapter into a 120VAC outlet.

- The analyzer will power up and perform a self-test. Make sure the message in the lower-right area of the display shows “Ready To Test” before continuing.
Proceed to the next section for instructions on using the analyzer.
Using the Analyzer – Bridge Analysis:
- Refer to the image below. Click on the “CHANGE LOAD CELL SETTINGS”.

- Select the bridge resistance, excitation voltage, and other test parameters as required for the load cell you are testing. Click on “OK” when finished.

- Click on “ANALYZE BRIDGE” to check the resistance of each leg of the bridge, as well as the resistance across the excitation and signal leads.
The resistor elements shown in the left-circled areas in the image below will change to green if they are within specification, or red if they are not.
- Click on “CHECK ZERO” to monitor the zero balance, and to check for proper wiring for tension and compression output polarity. See Step 5 for details.
Click to check zero balance and bridge polarity.
- See image below for details regarding the live bridge zero monitor mode.
- Measured excitation voltage provided by the analyzer
- Signal output measured in counts
- Polarity direction indicator. Arrow points up if counts are increasing. Arrow points down if counts are decreasing. Arrow points horizontally if no change measured.
- Signal output measured in mV.
- Signal output measured in mV/V.
- Dial gauge showing counts
- Zero-out the current reading for drift monitoring. Press again to cancel.
- Click “OK” to exit the zero-monitor mode.
Insulation Resistance Test
How it works:
The Insulation Resistance (IR) Test checks to make sure the internal wiring of the load cell is isolated from the load cell flexure metal. While the IR test is running, the load cell analyzer internally shorts together all the signals on the bridge test connector to form a single contact. It then applies a low-current 50VDC test voltage to the flexure (through a separate flexure detect module signal) and measures the voltage on the bridge. If the voltage is unaffected the load cell passes the test. The resistance from the load cell flexure to the internal wiring of the load cell must be greater than 1 Gigaohm to pass.
To verify the integrity of the IR test, the flexure detect module contains two terminals that must be shorted together by the load cell metal casing when it is attached to the load cell. This indicates to the Load Cell Analyzer that the test will be valid.
Performing the IR Test:
- Attach the flexure detect module cable to the connector on the front of the load cell analyzer where shown.

- Attach the two contacts on the other end of the flexure detect module to a bare-metal surface of the load cell frame. Typical styles of flexure detect modules include alligator-clip type or surface contact type (where the load cell simply rests on the module).
- Connect the output cable of the load cell to the bridge connector of the load cell analyzer.
- Press the button labeled “INSULATION TEST”.

- The load cell analyzer will first check to make sure the bridge is electrically connected to the load cell. This connection must be present to perform a valid IR test. If no bridge resistance is measured the test will not continue.
- If the load cell analyzer detects the bridge, it will then verify if the flexure detect module is making electrical contact to the load cell body. See image below.

- If the load cell body is not making contact, you will see the message “NO FLEXURE DETECTED” in red, as in the image above. If the load cell body is detected, the display will show the message “FLEXURE DETECTED” in green. Press “CONTINUE” to perform the IR Test.
- Upon completion of the IR test, the load cell analyzer will indicate if the test passed or failed.
Features
- Touchscreen Display: Provides a user-friendly interface for selecting diagnostic functions and viewing load cell measurements.
- Zero Balance Measurement: Evaluates the unloaded electrical output of a strain-gauge load cell to identify potential offsets or sensor damage.
- Bridge Resistance Testing: Measures bridge input and output resistances to help assess the condition of internal strain-gauge circuits.
- Bridge-Leg Resistance Testing: Checks individual bridge-leg resistance values and provides pass/fail indications.
- Short-Circuit Detection: Helps identify unwanted electrical connections within the sensor or associated wiring.
- Insulation Resistance Testing: Checks electrical insulation integrity to help identify leakage paths or insulation deterioration.
- TEDS Function Check: Verifies the operation of supported Transducer Electronic Data Sheet functionality.
- DB9 Sensor Connection: Provides an electrical connection for compatible load cells using the appropriate connector and wiring arrangement.
Maintenance and Cleaning
- Disconnect the analyzer from its power source before cleaning.
- Remove the connected load cell and test cables.
- Wipe the enclosure with a soft, dry cloth.
- Clean the touchscreen using a suitable microfiber cloth.
- Inspect the DB9 connector for bent contacts, dust, or corrosion.
- Keep connectors free from moisture and contamination.
- Inspect the power adapter and cables for damaged insulation.
- Avoid abrasive cleaners, solvents, and excessive cleaning liquids.
- Store the analyzer in a clean, dry environment.
- Arrange periodic functional verification using a suitable reference sensor or approved test procedure.
Troubleshooting
- IR test will not continue (bridge not connected): The analyzer first checks for electrical connection between the bridge and the load cell. If no bridge resistance is measured, the test will not continue.
- Flexure detect module contact issue: If the load cell body is not making electrical contact through the flexure detect module, the display shows “NO FLEXURE DETECTED” in red. Ensure the flexure detect module’s two contacts are properly connected to a bare-metal surface of the load cell frame.
- Flexure detected but IR flow confirmation: If contact is detected, the display shows “FLEXURE DETECTED” in green; press “CONTINUE” to perform the IR test.