TrueNAS-logo

TrueNAS F100-F60 High Performance Storage Systems

TrueNAS-F100-F60-High-Performance-Storage-Systems-product

Specifications

  • Enclosure: 2U, 24-bay High-Availability storage array
  • Drive Count: 24
  • Cooling Fans: Included
  • Power Supplies: Redundant power supplies (800W typical, 1152W max)
  • Power Draw: Varies based on configuration
  • Storage Controllers: Included
  • Dimensions (H x W x L): Varies based on model
  • Net Weight (Fully Loaded): 58 lbs
  • Operating Temperature: Varies based on model
  • Non-Operating Temperature: Varies based on model
  • Vibration: Varies based on model

Introduction

The TrueNAS F-Series is a 2U, 24-bay, High-Availability storage array with redundant power supplies. Your system comes with the TrueNAS SCALE operating system preloaded.
Review the safety considerations and requirements before interacting with the F-Series.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (1)

Safety

Anti-Static Precautions

Warning – Electrostatic Discharge (ESD)
Static electricity can build up in your body and discharge when touching conductive materials. Electrostatic Discharge (ESD) is harmful to sensitive electronic devices and components. Keep these safety recommendations in mind before opening the system case or handling non-hot-swappable system components.

  • Turn off the system and remove power cables before opening the case or touching internal components.
  • Place the system on a clean, hard work surface like a wooden tabletop. Use an ESD dissipative mat if possible to protect the internal components.
  • Touch the metal chassis with your bare hand to dissipate static electricity in your body before handling any internal components, including components not yet installed in the system. We always recommend wearing an anti-static wristband and using a grounding cable.
  • Store all system components in anti-static bags.

Personal Protective Equipment (PPE)

Warning – PPE
Wear proper PPE, like anti-static wrist straps and smocks before touching any sensitive equipment inside the chassis. If you are unsure how to properly replace any parts, contact iXsystems Support.

Handling the System
Hold the system from the sides or bottom whenever possible. Always be mindful of loose cabling or connectors, and avoid pinching or bumping these elements.
These instructions use “left” and “right” according to your perspective when facing the front of a system or rack.

Warning
The F-Series weighs 58 lbs fully-loaded and requires a minimum of two people to lift.
When handling rails, system components, or drives, never force movement if a component seems stuck. Gently remove the component and check for pinched cables or obstructing material before installing it again. Installing a component with excessive force can damage the system or cause personal injury.

Specifications

Enclosure

Drive Count24 2.5” NVMe SSD
Cooling Fans5 plus one 1 redundant
Power Supplies2
Power DrawF60F100
Typical (HA)600W800W
Max (HA)996W1152W
Storage Controllers2
Dimensions (H x W x L)3.43” x 17.2” x 27.44”87mm x 438mm x 697mm
Net Weight (Fully Loaded)58.7 lbs26.7 kg
Operating Temperature41°F ~ 95°F5°C ~ 35°C
Non-Operating Temperature-40°F ~ 140°F-40°C ~ 60°C
Vibration0.10G at 5 Hz to500 Hz

 PCIe Population

ModelSlot 1Slot 2Slot 3Slot 4
F60100G NIC (Optional)100G NIC (Optional)
F100100G NIC100G NIC (Optional)100G NIC (Optional)

Memory Allocation

ModelABCDEFGHTotal
F6064GB64GB64GB64GB64GB64GB64GB64GB512GB
F10064GB64GB64GB64GB64GB64GB64GB64GB512GB

Space Requirements
The F-Series requires at least 2U of rack space in an an EIA-310 compliant rack.
The system is 38.9” long with the CMA. The rack posts must be between 30” and 37” apart to install the rail kit. Review your rack setup to ensure the F-Series fits in the rack with any front or back rack doors closed.
We recommend having at least four feet of space in front of the rack to account for the system fully extended on the rails and personnel servicing the front of the system.
We also recommend having at least 32 inches of space behind the rack to account for cable management and personnel serving the back of the system.

Recommended Tools

We recommend these tools when interacting with the TrueNAS F-Series:

  • #2 Phillips head screw driver
  • Flat head screw driver
  • Tape measure
  • Level

Buttons, Ports, and Indicators

Front Indicators

TrueNAS-F100-F60-High-Performance-Storage-Systems- (2)

Drive Indicators

TrueNAS-F100-F60-High-Performance-Storage-Systems- (3)

LightColor and Indication
Left LEDBlue (Flashing): Locate ID Active
Right LEDGreen (Flashing): Drive Activity
Right LEDAmber (Solid): Drive Fault
Right LEDAmber (1Hz Flashing): Linking
Right LEDAmber (2Hz Flashing): Link Failure

Rear Buttons, Ports, and Indicators

TrueNAS-F100-F60-High-Performance-Storage-Systems- (4) TrueNAS-F100-F60-High-Performance-Storage-Systems- (5)

Racking Procedure

Remove Chassis Rail from Rack Rail
The rail kit separates into two pieces, the inner chassis rail and the outer rack rail.
Slide the inner chassis rail out of the rack rail until it stops, then pull the white tab and remove the chassis rail.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (6)

Install the Chassis Rail on the System
Fit the rail keyholes over the mounting pegs on the system and slide the rail toward the back of the system until it locks. Use a low-profile M4x4 screw to secure the rail to the chassis. Repeat the process for the second chassis rail.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (7)

Install the Rack Rail in the Rack

Tip – Rack Spacing
To ease field servicing, we recommend you avoid installing the F-Series between two other systems if possible.

Place the rail in the rack with the front end towards the front of the rack. Align the rear pins with the rear rack mounting holes in the bottom 2U of reserved rack space. Swing the gray latch handle open and pull it to extend the rail until the rail pins are fully seated in the rack holes. Release the latch to lock the rail in place, then secure the rail to the rack by installing one M5x10L screw and washer between the rail pins.
At the front of the rail, align the pins with the front rack holes, then push the pins into the holes until the latch clicks.
Ensure you mounted the front and rear rail pins in the same U in the rack and that the rail is level.
Repeat the process for the second rack rail.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (8)

 Install the System in the Rack
Team-lift the system and align the chassis rails with the rack rails. Slide the ends of the chassis rails into the rack rails and push the system into the rack until the metal safeties click and lock.
Pull the blue release tabs towards the front of the system and finish pushing the system into the rack. Tighten the thumbscrews to secure each system ear to the rack.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (9)

Install the Cable Management Arm (CMA)
Starting with the left side, push the post onto the left bracket. On the right side, push the inner post onto the inner  bracket, then push the outer post onto the outer bracket.  The CMA posts click and lock when installed correctly.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (10)

Install Cables
Open the black baskets on the CMA and route all the wires for both controllers. Ensure the left-side wires have at least 28 inches of slack between the system and the CMA. The right-side wires should have at least 20 inches of slack between the system and the CMA. All cables going through the CMA should be at least five feet long overall.

Tip – Cabling
We recommend bundling the cables for each controller using the included velcro straps  to make servicing easier.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (11)

  • Connect ethernet network cables from your local switch or management network to the OOBM and network ports on both controllers.
  • Next, connect a monitor to one of the Micro HDMI ports using the VGA adapter, then connect a keyboard to a USB port on the same controller.
  • Finally, connect the power cables to both power supplies, then plug them into a power distribution unit.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (12)

8.1 NIC Cabling
If you ordered additional networking cards with your system, you can set them up now. Insert the SR optics into the first port on the NIC, then plug the SR cable into the back of the SR optics. The optics and the cable click and lock into place when installed correctly. Repeat for all remaining ports.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (13)

 Tip – Cable Management
Before continuing, test your cable setup by sliding the system out of the rack. The cables should move freely with the CMA without pinching or coming loose.

Unracking Procedure

Unplug all PSU, networking, and display cables, then open the baskets on the CMA and remove all the cables.
If you plan to re-install the system in the rack, be sure to label the cables so you can easily cable the system again.

Remove the CMA
Starting with the right side, push the blue release on the outer post and pull the post off the bracket, then do the same for the inner post. Finally, push the blue release on the left CMA post and pull the CMA away from the system.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (14)

Uninstall the System from the Rack
Loosen the thumbscrews on the each system ear and pull the system out of the rack until it stops. Pull the white security tab on each chassis rail, then finish sliding the system out and team lift it out of the rack.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (15)

Remove the Rack Rails
At the back of one of the rails, remove the M5 screw, then swing the gray latch handle open and slide the end of the rail off the rack.
At the front of the rail, push the latch away from the rack and guide the rail pins out of the rack mounting holes.
Repeat the process for the second rack rail.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (16)

Drive Replacement

Remove Drive Tray
To remove a drive tray, push the button on the bottom end of the tray to release the locking arm. Gently open the arm until it stops, then pull the tray out from the system.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (17)

Remove a Drive From a Tray
Uninstall both SSD screws securing the drive to the tray, then gently lift the drive out of the tray screw-side first.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (18)

Removing Air Baffles to Replace with Drives
If you are replacing an air baffle with a new drive, uninstall both SSD screws securing the baffle to the tray, then gently lift the baffle out of the tray screw-side first.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (19)

Install a Drive in a Tray
Ensure the drive connectors point out the back of the tray. Insert the drive into the tray peg-side first, then push the drive down into the tray. Secure the drive in the tray using two SSD screws.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (20)

Install a Drive Tray in the System
To remove a drive tray, push the button on the bottom end of the tray to release the locking arm. Gently open the arm until it stops, then pull the tray out from the system.

TrueNAS-F100-F60-High-Performance-Storage-Systems- (21)

Additional Resources
The TrueNAS Documentation Hub has complete software configuration and usage instructions. Click Guide in the TrueNAS web interface or go directly to: https://www.truenas.com/docs
Additional hardware guides and articles are in the Documentation Hub’s Hardware section: https://www.truenas.com/docs/hardware
The TrueNAS Forums provide opportunities to interact with other TrueNAS users and discuss their configurations: https://forums.truenas.com/

Contacting iXsystems
Having issues? Please contact iX Support to ensure a smooth resolution.

Contact MethodContact Options
Webhttps://support.ixsystems.com
Emailsupport@iXsystems.com
TelephoneMonday-Friday, 6:00AM to 6:00PM Pacific Standard Time:
TelephoneTelephone After Hours (24×7 Gold Level Support only):

Frequently Asked Questions

  • Q: How do I properly handle the TrueNAS F-Series to avoid damage?
    A: Always hold the system from the sides or bottom, wear proper PPE, and do not force movement of components. If unsure, contact iXsystems Support for guidance.
  • Q: What are the space requirements for installing the F-Series in a rack?
    A: The F-Series needs at least 2U of rack space in an EIA-310 compliant rack. Ensure proper spacing in front and behind the rack for installation and maintenance.
  • Q: What tools are recommended for interacting with the F-Series?
    A: It is recommended to use appropriate tools when handling the TrueNAS F-Series to ensure safe operation and maintenance.

Documents / Resources

TrueNAS F100-F60 High Performance Storage Systems [pdf] User Manual
F100, F60, F100-F60 High Performance Storage Systems, F100-F60, High Performance Storage Systems, Performance Storage Systems, Storage Systems

References

Leave a comment

Your email address will not be published. Required fields are marked *