TOOLOTS FM-5540 Shrink Wrapping Machine User Manual
TOOLOTS FM-5540 Shrink Wrapping Machine

Foreword

Summarization
Thanks for using our machine,It’s a safe ,applied and efficient sealing and shrinking 2 in 1 packaging machine .

Matters need attentions

A. Pls read this manual before use the machine;
B. Pls take the cautions and machine commond sense in mind before use the machine;
C. Pls Keep this manual in order to reference;
D. Give this manual to the end user;
E. We reserve the right to make technical modification on this machine and manual in order to improve and perfect machine performance ;
F. Pls contact us if you have any good suggestion for this machine and manual;

safety cautions

A. The breaker and wires applied must correspond to the capacity of the power supply of machine;Otherwise , damage occurs to the parts or wiring if the smaller capacity breaker or the smaller diameter wires are applied.
B. To guarrantee the liquid would not leak out when packing liquid product ,if not ,damage would be made to the machine or the operator would possibly get the electric shock
C. Don’t use the machine in a very moist and humid environment or a place which full of a lot of vapor;
D. Don’t use the machine in the place which full of dust
E. The sealing blade , asbestus slot and the heating bubo are of high temperature after a long time running ,don’t touch by hand;
F. Don’t put any metal parts under the sealing blade when sealing in order to avoid damaging to sealing blade;
G. The sealing time should be of 0.8 to 1.5 second in general ,the sealing blade would be damaged if the sealing time was set too long.
H. The shrinking temperature should be set between 200°C to 300°C,The sealing blade would be damaged or a bad packaging effect occurs if the shrinking temperature is too high.
I. The sealing blade , teflon belt and neoprene rubber would be worn after a period of time using ,so please prepare some damageable parts , examine and repair the machine periodically.
J. Pls cut off the electricity before change the parts .and change the parts in order。

Features of the machine

A. This machine is widely used for the packaging application of these industries :food ,toy ,hardware ,cosmetic ,medicine ,daily commodity ,books ,bamboo product ,wooden product and electric appliance;
B. Sealing and shrinking 2 in 1 machine occupying small space and easy to operate;
C. Applied to variety of shrink film such as PVC,POF etc;
D. The sealing blade is made of alloy ,stick-proof and high temperature-proof without carbonization and smoking when packing ,it’s prove the sealing part steady ,The sealing time is easy to adjust according to the thickness of the film ;
E. Stainless steel heating tube with Heat Sink on the surface that heat up fast and long life-span of usage;
F. Seal and shrink in one time ,safe , reliable and easy to operate ,the part sealed on the film is firm and looks well;
G. this machine can work continuously for a long time。

Machine dimension and wooden carton dimension

Machine dimension 

  • FM-4030 dimension
    Machine dimension 
  • FM-5540 dimension
    Machine dimension 

Wooden carton dimension 

  • FM-4030 carton dimension
    Wooden carton dimension 
  • FM-5540 Carton dimension
    Wooden carton dimension 

Components of the panel

Components of the panel

A. Power:Turn on or off the power of machine ;
B. temperature:set the temperature of heating system;
C. sealing time:set the sealing time of blade;
D. shrink time:set the shrink time of shrink system;

Machine parts illuminate drawing

final assembly drawing
final assembly drawing 

No.NameQty
1frame1
2Film feeding system1
3Srhink system1
4Electric control system1
5Sealing system1

Distributor plate illuminate drawing
Distributor plate illuminate drawing

No.ItemNameQty
1Distributor plate1
2T2Sealing blade Transformer1
3T1Electromagnetic Transformer1
4V1rectifier bridge1
5wiring duct1
6wiring duct 21
7XTerminal block1
8QF1Heating tube circulate breaker1
9KT2Delay relay1
10QF2Electronagnetic circulate breaker1
11QF3Sealing circulate breaker1
12QF4Blowing circulate breaker1
13KM1Electromagnetic circulate contactor1
14KM2Blowing circulate contactor1
15KM3Heating tube circulate contactor1
16KM4Sealing circulate contactor1

blowing system
blowing system

No.ItemNameQty
11-18BInstall box of fan1
2Blowing motor1
32-16JShaft sleeve of blowing motor1
41-25Bassembling board for heating tube1
51-27BFront heat insulation board1
61-22Bleft support board for upper frame1
71-22BRight support board for upper frame1
81-24BThe open and close board1
91-26BWind guide board1
101-35Bthermocouple1
111-35AHeating tube2
121-29Bsupport board for mesh worktable2
131-28BPothook for mesh worktalbe2
141-34BMesh worktable1
152-37JBolt for support board2
16fan1
171-36BHeat Sink34
18Heat insulation board1
19bolt4
20GB-CROSS-SCREWS-TYPE1 M4X5-512
21Socket head screw M6X16+ gasket 64

Reel holder system drawing
Reel holder system drawing

No.NameQty
1Reel    holder1
2Shaft of perforator2
3Wheel1
4Shaft for guide film2
5Installation shelf for guild rail2
6Fixer2
7Cover of the perforator wheel4
8Pin wheel of the perforator2
9grooved wheel2
10cross recessed round head screw M5X168
11Fixer bolt2
12bolt6
13Upper board of moveable rail2
14GB-CROSSS-SCREWTYPE1M4X6-66

Technical parameters table

modelFM-4030FM-5540
Power supply1 phase 220V 50Hz1phase 110V 60Hz1 phase 220V 50Hz1 phase 110V 60Hz
power3.8kw4.0kw
Max sealing sizeL400*W300L550*W400
dimensionL1215*W590*H1020L1370*W697*H1073
weight100kg125kg

Installation

A. Remove the upper cover board of carton and then remove the sour side boards;
B. lift and place the machine on the flat ground ;
C. Unpack the protective film which wrapping on the machine and parts;
D. Install the four wheels at the bottom of the base plate in turn and make sure the ones with brake installed in the front;
E. Install the two stands on the left and right side of the base plate in turn ,fastening the screws;
F. Put the main body of the machine on the stands(Notice :make the four iron bolt on the main body of the machine exactly into the four holes on the stands);
G. The moveable rail on the reel holder corresponds to the moveable rail on the right side of the machine body ,Adjusting and making the reel holder in(Notice:some users would like to hang the reel holder up on the machine ,if so please screw off the screws on the right side of the machine body ,hanging the reel holder up and fastening the screws.);
H. Be sure that the power supply used corresponds to the nameplate which shown at the rear of the machine。
Installation

Operation method

A. Turn the power on ,adjusting the shrinking temperature according to the variety and thickness of the shrink film,200°C to 300°C in general;
B. Set the sealing time according to the thickness and variety of the shrink film,0.8 to 1.5 second in general(The best is to set the sealing time apropos to make the sealing part steady and good effect,the time set too long would result in the blade ,blade slot and neoprene rubber are easy broken,set too short would effect the sealing effect and even cann’t cut absolutely);
C. Usually ,set the sealing time a little longer when just turn power on due to there is no any accumulation of heat in the blade ,Set the sealing time a little shorter than beginning due to the accumulation of the heat in the blade.;
D. drill the shaft of the reel through the film reel ,move the fixer to the center of the reel and fasten the screws;
E. If hanging reel holder is the choice, put the film reel between the two rollers directly and posit the two support and get them fastened. ;
F. Put the film reel with a shaft on reel holder ,make the open side of the film toward to the operator.;
G. drill the film through the perforator ,separate the two layers ,get it surround the working table;
H. Adjust the height of the mesh ,parallelizing the center line of the product to be sealed with the sealing blade;
I. Stretch the film to the sealing area and sealing the film only as first sealing;
J. Place the product on the working table ,Let it covered by the upper sheet of the film ,stretching the film and the product to the sealing area in the left ;
K. Keep a distance of the product to the sealing blade as 1/2 height of product in order to have enough film for shrinking;
L. The indicator light of temperature regulator which on the control panel will turn to red when the practical temperature reach the set value ,if so ,press down the chamber hood then the sealing procedure are automatically finished ,then the blowing shrinking running automatically after 1 second’s delay.
M. The delay equipment is installed in the machine and had been set the general parameter’s value well ,if it needs to be reset ,please ask the professional technician to do it or consult the supplier;
N. The chamber hood spring up automatically after the blowing;

Machine maintenance

A. Clean the working table and shrinking chamber after the daily use;
B. Clean the sealing blade periodically, Notice: Clean the sealing blade by a piece of dry cotton cloth with the release agent ,Don’t use any metal scratch the sealing blade;
C. The moveable parts such as transmitting chains ,bearing base needs to be oiled with lubricant often;
D. The sealing blade , teflon belt and Neoprene rubber must be kept well ,if any of them is worn or damaged ,replace it with new one soon;
E. Turn the power off before repairing ,let professional to do it;
F. The procedures of replacing the sealing blade

  1. Unfasten the hexangular screws on the blade clamp ,take the worn sealing blade out;
  2. Then Put one end of the new sealing blade into the slot of the blade clamp ,push the screw on the top of the blade clamp by a tough tool in order to make it unmovable ,then tighten the hexangular screws for fixing the sealing blade;
  3. put the sealing blade into the ceramic blade slot lightly ,then put the other end of sealing blade into the slot of the other blade clamp;
  4. push the screw on the top of the blade clamp by a tough tool in order to make it unmovable ,then tighten the hexangular screws for fixing the sealing blade;
  5. End。
    Machine maintenance

Circuit diagram

Circuit diagram

Trouble shooting

Fault and failureCauseclearing of fault
There isn’t any heat on the sealing bladeThe breaker trippedCheck the circuit and turn on thebreaker
The sealing blade is damagedReplace the sealing blade
Transformer damagedTest the output of the transformer during the course of sealing ,replace the transformer with a new one if it’soutput doesn’t reach 54V
The sealing blade can be heated ,but the film can not be cut offPartial damage to the sealingbladeReplace the sealing blade with a newone if breach found on it
Something unknown attachedon the sealing bladeClean the sealing blade by a piece ofcry cotton and the release agent
The teflon belt damagedReplace the teflon belt with a newone
The neoprene rubber damagedReplace the neoprene rubber with a new   one    if   it’s   surface    is    notsmooth
The screws for fixing the ceramic slot of the sealing blade   found   to   be unfastened ,leading to the lean or incline of the ceramic slot ofthe sealing bladeAdjust the ceramic slot and fasten the screws
The blowing motor works but the shrinking effect is notgoodThe shrinking temperature istoo lowIncrease the shrinking temperature
The    blowing    and   shrinkingtime is too shortIncrease the blowing and shrinkingtime
The chamber hood fall to it’s right place but the machine can’t sealand cut the filmThe inching switch which check and examine whether the chamber hood has fallen to the right place was of failure ornot to be adjusted wellMake the inching switch working when the chamber hood falls to the right place or replace the jiggle switch with a new one once it wasdamaged.

Packing list

No.NameSpec.Qty
1machine1set
2breakerC32N1P16A1pc
3breakerC32N1P2A1pc
4manual1ps
5Teflon tape1set
6Sealing blade1set
7Hexangular spannerM61pc
8Hexangular spannerM41pc

TOOLOTS logo

Documents / Resources

TOOLOTS FM-5540 Shrink Wrapping Machine [pdf] User Manual
FM-5540 Shrink Wrapping Machine, FM-5540, Shrink Wrapping Machine, Wrapping Machine

References

Leave a comment

Your email address will not be published. Required fields are marked *