2 KW Geyser Heating Element

Altro 2 Vertical Geyser Heating Element: Installation and Maintenance Guide

Model: 2 KW Geyser Heating Element | Brand: Generic

Nhanganyaya

This manual provides comprehensive instructions for the safe installation, operation, and maintenance of the Generic Altro 2 Vertical Geyser Heating Element. This element is designed for efficient and durable performance in 15-50 liter Altro 2 geysers. Please read this guide thoroughly before installation and use to ensure proper function and safety.

Safety Information

WARNING: Electrical shock hazard. Installation and maintenance should only be performed by qualified personnel. Disconnect power to the geyser before proceeding with any installation or maintenance.

  • Ensure the main power supply to the geyser is switched off and locked out before beginning any work.
  • Always wear appropriate personal protective equipment (PPE), including insulated gloves and safety glasses.
  • Verify that the replacement heating element specifications (voltage, zvitage) match the original element and your geyser's requirements.
  • Do not operate the geyser without water. This can damage the heating element and the geyser.
  • Inspect the element for any damage before installation. Do not install a damaged element.
  • Ita shuwa kuti kubatanidza kwemagetsi kwakachengeteka uye kwakavharirwa zvakanaka.
  • This heating element is designed for water heating applications only. Do not use for other purposes.

Package Zviri mukati

Iyo package inowanzo sanganisira:

  • Altro 2 Geyser Heating Element
  • Mounting hardware (may vary)
  • Kuisa bhuku (gwaro iri)

Zvinotsanangurwa

Model NameRAcold Altro2 Vertical (Compatible)
Simba2000 Watts (2 KW)
Voltage230 Volts (AC)
MaterialHigh-quality Copper
Flange Diameter111 MM
Product Dimensions11.1L x 11.1W x 27H Masendimita
Item Weight300 - 370 Grams (approx.)
Special FeatureShock Uchapupu
Kugarisana15 to 50 liter Altro 2 Geysers

Setup uye Installation

This section outlines the general steps for replacing a geyser heating element. Specific steps may vary based on your geyser model. If unsure, consult a qualified technician.

  1. Bvisa Simba: Locate the main power switch for your geyser and turn it OFF. For added safety, consider turning off the main circuit breaker for your home.
  2. Drain Geyser: Turn off the cold water supply to the geyser. Open a hot water faucet in your home to relieve pressure and allow the geyser to drain. Connect a hose to the geyser's drain valve and direct it to a floor drain or outside. Open the drain valve to completely empty the geyser.
  3. Access Element: Once the geyser is empty, locate the heating element access panel, usually at the bottom or side of the geyser. Remove the cover.
  4. Bvisa Wiring: Carefully disconnect the electrical wires from the old heating element terminals. Note their positions or take a photo for reassembly.
  5. Bvisa Chinhu Chekare: Use a suitable wrench or element removal tool to unscrew the old heating element from the geyser tank. Be prepared for any residual water.
  6. Ongorora uye Uchenese: Inspect the geyser tank opening for any debris or scale. Clean the area thoroughly.
  7. Isa Chinhu Chitsva: Insert the new Altro 2 Geyser Heating Element into the opening. Ensure the gasket is properly seated to prevent leaks. Tighten the element securely with the wrench. Do not overtighten.
  8. Reconnect Wiring: Reconnect the electrical wires to the new heating element terminals, ensuring they match the original configuration.
  9. Refill Geyser: Close the geyser's drain valve. Turn on the cold water supply to the geyser. Open a hot water faucet in your home to allow air to escape as the tank fills. Once water flows steadily from the hot faucet, the geyser is full. Close the hot faucet.
  10. Dzosera Simba: Replace the access panel cover. Turn the main power supply to the geyser back ON.
Altro 2 Vertical Geyser Heating Element

Mufananidzo 1: Mberi view of the Altro 2 Vertical Geyser Heating Element. This shows the main heating coils and the thermostat probe.

Altro 2 Geyser Heating Element Flange

Mufananidzo 2: Pazasi view of the heating element flange, showing the electrical terminals and mounting holes.

Operating Instruction

Once the heating element is installed and the geyser is refilled with water, the unit is ready for operation.

  • Ensure the geyser is completely filled with water before turning on the power. Operating an empty geyser will damage the heating element.
  • Turn on the power supply to the geyser.
  • Allow sufficient time for the water to heat up. The heating time will depend on the geyser capacity and the desired temperature.
  • The geyser's thermostat will regulate the water temperature. Refer to your geyser's original manual for thermostat adjustment instructions.

Maintenance

Regular maintenance helps prolong the life of your heating element and geyser.

  • Kuongorora Kwegore: It is recommended to have your geyser and heating element inspected annually by a qualified technician.
  • Anode Rod Check: The geyser's anode rod protects the tank from corrosion. Check and replace it as needed, typically every 3-5 years, or more frequently in areas with hard water.
  • Kuchenesa Madhaka: Periodically drain and flush your geyser to remove sediment buildup, which can reduce efficiency and lifespan of the element.
  • Element Cleaning: If removing the element for inspection, gently clean any scale buildup with a non-abrasive brush. Avoid harsh chemicals.
  • Mabatirwo emagetsi: Iva nechokwadi chekuti kubatanidza kwemagetsi kunoramba kwakasimba uye kusina ngura.

Kugadzirisa matambudziko

If your geyser is not heating water or experiencing issues after element replacement, consider the following:

DambudzikoZvinogona KukonzeraSolution
Hapana mvura inopisaNo power to geyser; tripped circuit breaker; faulty thermostat; element not connected properly.Check power supply and circuit breaker. Ensure element wiring is secure. Consult a technician for thermostat issues.
Mvura isingapise zvakakwanaThermostat set too low; sediment buildup; faulty element.Adjust thermostat. Flush geyser for sediment. If element is faulty, replace it.
Leaking around elementElement not tightened sufficiently; damaged gasket; faulty element flange.Tighten element (do not overtighten). Replace gasket. Inspect element flange for damage.
Kupisa kunhuwaLoose electrical connection; element operating without water.Immediately disconnect power. Check wiring. Ensure geyser is full of water. Seek professional help.

Always disconnect power before attempting any troubleshooting or repairs. If you are unsure about any step, contact a qualified technician.

Warranty Information

This Altro 2 Geyser Heating Element typically comes with a 1-makore waranti from the date of purchase. The warranty covers manufacturing defects under normal use conditions. It does not cover damage due to improper installation, misuse, neglect, or acts of nature.

Please retain your purchase receipt as proof of warranty. For warranty claims, contact your retailer or the manufacturer.

Mutengi Support

For installation assistance, product inquiries, or technical support, please contact the manufacturer or your retailer. You may also refer to the contact information provided on the product packaging or your purchase documentation.

Manufacturer Contact: Insta Hot India +91 9420469198

Related Documents - 2 KW Geyser Heating Element

Preview Heliosa 66 Black Infrared Heater Installation and Replacement Guide
A comprehensive guide for installing and replacing the heating element in the Heliosa 66 Black infrared heater, with detailed instructions and safety precautions.
Preview EMKE Smart Heating Element: Installation and User Manual
Comprehensive installation and user manual for the EMKE Smart Heating Element, covering setup, operation, app control, safety guidelines, and disposal instructions.
Preview Eastbrook Type B Wi-Fi Heating Element: Instruction Manual
Yakakwana yekuraira bhuku reEastbrook Type B Wi-Fi Heating Element, inovhara chengetedzo, mashandiro, hunyanzvi hwekuita, uye kutonga kweapp.
Preview Bhuku reMushandisi neGwaro reKuisa reDewhot ND16CTDH 16L Gas Geyser rine Tembiricha Isingaperi
Gwaro rakakwana reDewhot ND16CTDH 16L Constant Temperature Gas Geyser, rinofukidza kuiswa, mashandiro, kuchengetedzeka, kugadzirisa, uye kugadzirisa matambudziko.
Preview Ecostrad Standard Heating Element: Installation, Usage, and Safety Manual
Comprehensive instruction manual for the Ecostrad Standard Heating Element, covering installation, technical specifications, safety precautions, warranty, and disposal. Ensure safe and correct operation of your Ecostrad heating element.
Preview SAFIELINA Smart Heating Element Installation and User Manual
Installation and user manual for the SAFIELINA Smart Heating Element, covering safety, installation, technical specifications, manual operation, app control via WiFi, troubleshooting, reset, and disposal.