Installation Guide for ASJ models including: 3KS51 Series Retrofit Battery System Inverter, 3KS51 Series, Retrofit Battery System Inverter, Battery System Inverter, System Inverter, Inverter
AS1 - SAJ Polska
AS1-3KS-5.1 Series Inverter Quick Installation Guide This installation guide applies to AS1-3KS-5.1 AC Retrofit Battery System 1. Requirements for the mounting position 30CM 50CM 50CM 50CM 30CM × × × Figure 1.1Permitted and prohibited mounting method 2. Mark the load-bearing point Figure 1.2 Minimum clearance Figure 2.1: AS1- 3KS-5.1 wall mounting bracket dimensions (master device) Figure 2.2: B1-5.1-4.8 wall mounting bracket dimensions (slave device) Figure 2.3: Drilling position of the Load-bearing point (master device) Figure 2.4: Drilling position of the Load-bearing point ((slave device) -1- 3. Mounting inverter Master Slave 1 Slave 2 Slave 1 Slave 3 Figure 3.1: Position interval between master and slave AS1-3KS-5.1 Series Figure 3.2: Install the wall mounting bracket Figure 3.3: Install the AS1- 3KS-5.1 on wall mounting bracket 4. Electrical Connection Figure 4.1: Electrical interface description Code Name A DRMS Port B CT/Meter connection C RS232 communication D Grid connection E Backup connection F Ground G BMS switches H Battery switches I BAT+ J BMS LINK K BAT- Table 1: Interface definition description -2- METER AS1-3KS-5.1 Series 4G/WiFi/RMS485 GRID BACKUP Figure 4.2: Master device wiring terminals DRMS GRID_CT PV_CT + - ON 12 34 KE ON 12 34 KE + - + - ON 12 3 4 KE Figure 4.3: AS1retrofit battery system Figure 4.4: Slave device wiring terminals -3- AS1-3KS-5.1 Series 5. Opening-closing current transformer (CT) installation GRID_CT PV_CT Figure 5.1: Open the waterproof cover 6. Meter installation CT/Meter Figure 5.2: Connect the cable to the CT/Meter wire hole Figure 5.3: Connect the cable to the corresponding terminal The RS485 port 1 NC 2 NC 3 NC 4 NC 5 NC 6 NC 7 RS485-A+ 8 RS485-B- Table 2: RS485 pin port definition Figure 6.1: Single phase meter wiring diagram Figure 6.2Description of Figure 6.3Connect the 7~8 terminals the meter terminal of RS485 to the 24~25 terminals of meter The RS485 port 1 NC 2 NC 3 NC 4 NC 5 NC 6 NC 7 RS485-A+ 8 RS485-B- Table 3: RS485 pin port definition Figure 6.4: Three phase meter wiring diagram Figure 6.5Description of Figure 6.6Connect the 7~8 terminals the meter terminal of RS485 to the 24~25 terminals of meter -4- AS1-3KS-5.1 Series 7. Initial setup Step 1Download eSolar O&M APP. a. For the iOS system, search "eSolar O&M" in App Store to download. b. For the Android system, search "eSolar O&M" in Google Play to download. Step 2: Open the software. a. Enter your account and password. b. Login. Step 3: Enter the user center. a. Tap the "MY" icon in the lower right corner of the main interface. Step 4: Connect the devices. a. Tap "Remote Configuration." Step 5: Select connection methods. a. Choose one of the connection methods. Step 6: Pair with the equipment a. Select the correct model of the module to connect. Step 7: Equipment selection a. Tap "AS×××××" series device. -5- AS1-3KS-5.1 Series Step 8: Initial setup a. Set local grid compliance and time as per the local regulations. Step 9: Working modes selection a. Tap the area marked by the black box to select the operational mode. Step 10: Measuring device a. Select one of the monitoring equipment to connect. Step 11: Device information a. View the device information on this interface and tap the icon marked with the black box in the upper right corner. Step 12: Complete the setup a. Complete the parameter setting and enter the device configuration interface. --------------------------------END------------------------------ -6-Foxit Phantom Printer 版本 10.0.226.3455