ROLL-A-SHADE-LOGO

ROLL-A-SHADE Contract Plus+ 7 Inch Dual Bottom Fascia

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-PRODUCT

Product Information

Specifications

  • Product Name: CONTRACT PLUS+ 7 DUAL BOTTOM FASCIA
  • Manufacturer: Rollashade.com
  • Contact: info@rollashade.com | 951.245.5077
  • Hardware Included:
    • Bracket Covers
    • Motor Bracket
    • Motor Bracket Idler End
    • #14 Screw Screws
    • Shades + Motors
    • Fascia
    • Zip Ties
    • Wire Tie Pads
    • Wall Switch
    • Switch Box
  • Tools Required:
    • 3/8 Hex Head Phillips Head
    • 1/8 Drill Bit
    • Drill

Product Usage Instructions

  • Inside or Outside Application
    NOTE:
    ALL SHADES MAY BE PRE-PROGRAMMED TO SENSORS, REMOTES, AND/OR WALL SWITCHES UPON ARRIVAL
  • Mounting Location
    Place your first bracket in its mounting location and mark the screw holes. Place your second bracket in its mounting location and repeat the process.

Rollashade.com

info@rollashade.com

951.245.5077

HARDWARE INCLUDED

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (1)

TOOLS REQUIRED

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (2)

INSIDE OR OUTSIDE APPLICATION
**NOTE: ALL SHADES MAY BE PRE-PROGRAMMED TO SENSORS, REMOTES, AND/OR WALL SWITCHES UPON ARRIVAL**

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (3)

MOUNTING LOCATION
Place your first bracket in its mounting location and mark the screw holes. Place your second bracket in its mounting location and repeat the process.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (4)

SCREW INSTALLATION
Next, pre-drill your screw holes using a 1/8” drill bit. Install the brackets with the provided screws using the 1/4” hex head driver.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (5)

ALIGNMENT
Check to make sure your brackets are level and aligned.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (6)

TOP SHADE PIN END INSTALLATION
Swivel ball bearing to align with idler shaft for easy installation. Press idler shaft all the way to the bracket.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (7)

TOP MOTOR END INSTALLATION
Remove locking ring. Lineup to motor bracket. Push motor into motor bracket.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (8)

TOP LOCK RING INSTALLATION
Add locking ring to motor bracket. Check motor is secured correctly.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (9)

BOTTOM SHADE PIN END INSTALLATION
Swivel ball bearing to align with idler shaft for easy installation. Press idler shaft all the way to the bracket.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (10)

BOTTOM MOTOR END INSTALLATION
Remove locking ring. Lineup to motor bracket. Push motor into motor bracket.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (11)

BOTTOM LOCK RING & FASCIA INSTALLATION
Add locking ring to motor bracket. Check motor is secured correctly. Install bottom fascia.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (12)ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (13)

PLUG IN MOTOR

  • Run motor power cord to nearest power outlet.
  • Install wire tie pads and secure with zip ties to hold wire down.
  • The path of the wire should be parallel with mullions and/or drop ceiling tiles ensuring the cable is neatly organized.
  • Any modifications to the power cable should be done by a certified electrician to meet your city/state code requirements.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (14)

ADJUSTING LIMITS (IF NECESSARY)
See programming instructions based on the motor used for your application.

SHADE ADJUSTING (IF NECESSARY)

  • Roll shade up and down to confirm hembar is level and material rolls up straight on center tube.
  • If the hembar is not level, lower shade until you see the metal tube.
  • Add layers of masking tape to the metal tube to the end that is too low until hembar is straight.
  • If the material tracks to one side, lower shade until you see the metal tube.
  • Add layers of masking tape to the metal tube to the end that is opposite the direction of tracking, until shade rolls up straight.

ROLL-A-SHADE-Contract Plus+7-Inch-Dual-Bottom-Fascia-FIG- (15)

FAQ

Q: How do I adjust the limits of the shade?
A: See programming instructions based on the motor used for your application to adjust the limits of the shade.

Q: What tools are required for installation?
A: The tools required for installation are a 3/8 Hex Head Phillips Head, a 1/8 Drill Bit, and a Drill.

Documents / Resources

ROLL-A-SHADE Contract Plus+ 7 Inch Dual Bottom Fascia [pdf] Installation Guide
Contract Plus 7 Inch Dual Bottom Fascia, Contract Plus, 7 Inch Dual Bottom Fascia, Dual Bottom Fascia, Fascia

References

Leave a comment

Your email address will not be published. Required fields are marked *