Answer
Dec 22, 2025 - 08:45 PM

To connect the eNodeB to the power source, follow these steps as per the installation guide:
1. **Prepare the Power Cable:** Assemble the power plug on one end of the cable and the power terminal on the other end. Strip the insulating layer from the cable end.
2. **Connect the Power Plug:** Connect the live wire, neutral wire, and ground wire to the corresponding terminals on the power plug. Tighten the screws securely.
3. **Connect the Power Terminal:** Connect the live wire and neutral wire to the power terminal according to the labels or diagram provided. Ensure a secure connection.
4. **Connect to the eNodeB:** Connect the power cable to the PWR interface in the wiring cavity of the eNodeB. Lay the cable neatly along the designated slot.
5. **Connect to the Power Source:** Connect the other end of the power cable to the power source outlet. If the outlet is outdoors, consider placing the power adaptor in a waterproof box.
6. **Secure the Connection:** Once the cable connection is complete, tighten the screws on the cover of the wiring cavity to close it securely.
By following these steps, you can properly connect your LEAX LBS8529 TDD eNodeB to the power source for operation.