To ensure proper connection of the measurement contacts when using the LCR205 SMD Component Fixture with the Extech LCR200 LCR meter, follow these steps:
1. **Identify the terminals:** The fixture has three terminals - High (1), Low (2), and Guard (3). High should be positioned on one side of the SMD component, Low on the other side, and the Guard terminal should be connected to ground.
2. **Place the SMD component:** Position the SMD component (4) between the measurement contacts (5) on the fixture.
3. **Adjust the fixture:** Turn the adjustment xxxx (6) to clamp the measurement contacts securely onto the SMD component. Ensure that the contacts make proper contact with the component without causing damage.
4. **Verify correct positioning:** Double-check that the High and Low terminals are correctly placed on either side of the SMD component and that the Guard terminal is connected to ground.
5. **Power on the LCR meter:** Turn on the Extech LCR200 LCR meter and select the appropriate measurement function for the SMD component being tested.
6. **Take the measurement:** Once the connections are secure and the meter is set up, proceed to take the measurement by following the meter's operating instructions.
7. **Record the results:** After obtaining the measurement, make a note of the results for reference or further analysis.
8. **Power off and remove the component:** Once the measurement is complete, turn off the LCR meter, disconnect the SMD component from the fixture, and store the equipment properly for future use.
By following these steps and ensuring the correct positioning and connection of the measurement contacts, users can effectively utilize the LCR205 SMD Component Fixture with the Extech LCR200 LCR meter for accurate and reliable measurements.