Answer
Dec 01, 2025 - 11:04 PM

To properly connect the power input and relay output for the Autonics TZN Series Dual-Speed PID Temperature Controllers, follow these steps as per the instruction manual:
1. Use AWG 20 (0.50 mm2) cable or thicker to connect the power input and relay output.
2. Tighten the terminal xxxx with a torque of 0.74 to 0.90 N m.
3. Ensure the connections are secure and within the rated specifications to avoid fire or product damage.
By following these guidelines, you can ensure a proper and safe connection for the Autonics TZN Series Dual-Speed PID Temperature Controllers.
User Manual Q&A
Add New Comment