Answer
Nov 03, 2025 - 01:50 PM
The installation of the Geezer Engineering Triple Tree Conversion Kit requires precision and attention to detail. Here is a step-by-step guide based on the provided manual:
1. **Preparation:** Ensure you have access to all necessary tools and equipment as specified in the OEM service manual for your motorcycle model and year. Disconnect your motorcycle's battery before starting the installation process.
2. **Assembly of the Lower Triple Tree:**
- Apply high-strength/permanent thread locker to the neck stem threads and xxxx the neck stem into the lower triple tree until seated.
- Torque the neck stem to 120 ft/lbs using a 12mm socket and torque wrench.
- Apply thread locker to the set xxxx and xxxx it into the lower triple tree until seated properly in the retaining groove on the neck stem.
- Torque the set xxxx securely and finish by applying epoxy or permanent thread locker on top of the set xxxx .
- Install the brake line mount using medium-strength thread locker.
- Install the lower dust shield and neck bearing, ensuring the bearing is generously packed with grease.
- Install the cow bells (for 2014-up models) by drilling out the threads in the cow bell mount and securing them with Allen head bolts using medium-strength thread locker.
- Allow the assembly to cure for a minimum of 24 hours.
3. **Disassembly of Motorcycle Front End:**
- Follow the disassembly instructions provided in your OEM service manual, paying attention to specific details for 2013-earlier and 2014-2020 touring models.
4. **Installation of Triple Trees and Fork Legs:**
- Install the lower triple tree with dust shields and bearings hand-tight.
- Tighten the large top nut to set bearing play approximately correctly.
- Loosely install the top triple tree and slide the fork legs into position.
- Tighten the lower triple tree clamp bolts in small increments, ensuring even seating and avoiding over-tightening.
- Install the front wheel, brake calipers, front/lower part of the brake line, and fender.
- Set neck bearing play according to the OEM service manual.
- Apply medium thread locker to the upper clamp bolts and torque them to specifications.
5. **Brake Line Installation:**
- Follow the specific instructions for brake line installation based on the model year of your touring motorcycle (2014 and later, 2013 and earlier Non-ABS models, 2013 and earlier ABS models).
6. **Final Steps:**
- Bleed the brake system according to your OEM service manual.
- Complete the reassembly process according to the OEM service manual for your motorcycle model and year.
By following these detailed steps and referring to the Geezer Engineering manual for additional specifics, you can successfully install the Geezer Engineering Triple Tree Conversion Kit on your touring model motorcycle.
User Manual Q&A

Add New Comment