Answer
Oct 07, 2025 - 04:45 PM
#### Installation Process:
1. **Mounting on the Ceiling (via Eyelets):**
- Measure the distance between the eyelets, mark the points on the ceiling, drill holes, and xxxx the screen in place.
2. **Mounting on the Ceiling (Screwed):**
- Measure the distance between the holes in the side caps, transfer them to the ceiling, drill holes, insert mounting material, and xxxx the screen in place.
3. **Mounting on the Wall:**
- Measure the distance between the holes in the side caps, transfer them to the wall, drill holes, use suitable dowels and screws, and hang the screen securely.
#### Operation:
- **Control via Wall Control Box:**
- Safety Check: Insert the plug, ensure correct voltage, mount the control box, and extend/retract the screen using the arrow buttons.
- **Control via Remote Control:**
- Safety Check: Insert the plug, ensure line of sight between remote and control box, extend/retract the screen using the arrow buttons on the remote.
#### Additional Information:
- **Setting Stop Points:** Contact your specialist dealer for instructions on setting stop points.
- **EU & UK Conformity:** The product meets EU and UK directives. Separate collection of electrical devices is recommended for disposal.
By following these installation and operational instructions as outlined in the manual, users can ensure a safe and proper setup of the celexon Electric Professional Plus Electric Projector Screen.
User Manual Q&A

Add New Comment