Answer
Aug 08, 2025 - 06:04 AM
To ensure that the SmartCell Sounder and Wall Beacon is installed correctly and functioning properly, follow these steps:
1. Proper Installation: Make sure the device is mounted securely on the wall using all necessary fixing positions. If mounting on a metal surface, consider using a non-metallic spacer. Ensure correct battery installation with the specified batteries and observe correct polarity.
2. Configuration: The device must be added (programmed) to the control panel. Refer to the programming manual for full programming details specific to your SmartCell panel model (TSD155 or SmartCell WZM MK067).
3. Optional Device Locking: If you have used the optional locking mechanism, ensure you have the Allen key to unlock the device if needed. Follow the instructions provided in the manual to unlock the device.
4. Testing: After installation, the device should be tested according to local requirements. Testing should only be carried out by a fully trained competent person to ensure proper functionality.
5. Specifications: Check the operating temperature, humidity range, IP rating, battery requirements, and other technical specifications to ensure the device is operating within the specified environmental conditions.
6. Regulatory Compliance: Ensure that the installation and operation of the SmartCell Sounder and Wall Beacon comply with all relevant local regulations and standards.
By following these steps and referring to the installation guide for detailed instructions, you can verify that the SmartCell Sounder and Wall Beacon is installed correctly and functioning as intended.