Answer

Apr 17, 2025 - 02:47 AM
To install the GE 48717 C-Start Smart Button Switch Timer, follow these steps:
1. Before starting, turn off the power for the switch location at the circuit breaker box and test the existing switch by toggling it on/off to ensure the lights do not turn on.
2. Remove the existing wall plate and switch from the wall. Use a voltage tester on the black wires to confirm that the power to the switch is off. Label each wire with the provided wire labels.
3. Connect the neutral (white) wire on the switch to the neutral (white label) wire from the wall. Connect the black line wire from the switch to the line (black label) wire from the wall. Connect the load red wire from the switch with the load (red label) wire from the wall. Connect the ground (green) wire on the switch with the ground (green label) wire from the wall. Cap the 3-way/multi-way traveler wire if applicable.
4. Neatly push the wires back into the wall box, rotating the switch so it's oriented correctly.
5. Secure the switch to the wall using the provided screws. xxxx on the wall plate bracket, then snap the wall plate cover onto the bracket.
6. Turn the power back on at the circuit breaker box. The light ring on the switch will flash blue, indicating that the device is wired correctly and in setup mode. The light ring will continuously flash blue until the switch is added to the CYNC App. If the light ring does not illuminate, the switch may be wired incorrectly.
If the lights don't turn on after installation, check that the air gap switch is depressed, power to the switch is on at the breaker, and the wires are securely and properly wired according to the installation guide. For more troubleshooting, visit cyncsupport.gelighting.com.
Please note that this is a general overview of the installation process. For detailed instructions and illustrations, refer to the GE 48717 C-Start Smart Button Switch Timer Instruction Manual.
Add New Comment