4. Install the feed tube 
1 Take the No. 2 hexagonal wrench and use 4PCS-M3*6 hexagonal cylindrical head screws to fix the feed inlet assembly to the print head, as shown in the picture. 24PCS-M3*6 

M3*6 x4

Gantry Frame x1
7 Sems Screw M3*6 x4 06

4. Install the Gantry Frame 
1 Take gantry + base, gantry profile on the base step position, assembly and lock according to the picture by 4PCS-M5*40 combination screw. +4PCS-M5*40 2 Take 2PCS-L type connecting piece + 8PCS-M5*18 hexagonal flat round head screws and fix and lock them as shown in the picture. 2PCS-L+8PCS-M5*18

Base Frame x1

Gantry Frame x1

L-shaped connecting piece L
M5*18 x8

6 L-shaped connecting piece |L x2

7 Sems Screw M5*40 x4

Sems Screw M5*40 x4

8 Hexagon flat round head screws M5*18 x8

07

4. Install the Pull Rod 
8 5 9

8
5 Pull rods x2
5 8 Hexagon flat round head screws  M5*12 x2

9

9 Hexagon flat round head screws

 M5*20 x2

M5 Flat padM5 x2

08

5. Circuit Wiring 

Cooling fan 

X-axis motor X 

Y- axis motor Y 

Nozzle board serial port 

Signal input 
Power input 
Hotbed control 

Thermal bed thermosensitive 

X-axis limit X

Y-axis limit Y

Screen port 

09

Z-axis signals Z

6. Cable Connection 
4 Power Cord x 1

"

#

#

$

"

$

;

%

%

&
' ;

Caution/
 Do not connect or disconnect the cables when the machine is powered on.
 

A6pin plug-in terminal block (nozzle board serial port cable + nozzle board power cable) 6pin(+
BX-axis motor X CX-axis limit switch X DMaterial breakage detection line port  EConnect it to the power cord and turn on the power  FPress the power button and wait the display screen to start 

Connect  Press  10

6. Equipment Wiring 
1 Connect the plug-in terminal block, as shown in the picture A position interface. A 2 Connect the X-axis motor, as shown in the picture B position interface. XB 3 Connect the X-axis limit switch adapter terminal male, as shown in the picture C position interface. XC
A A

B C

B C

 Note: Do not plug and unplug the motor cable with power on, otherwise the motor will be damaged. 
11

6. Equipment Wiring 
Insert the material breakage detection line terminal into the material breakage detection switch port, as shown in the picture at position F. F
D D
 Note: Do not plug and unplug the motor cable with power on, otherwise the motor will be damaged.  12

6. Equipment Wiring 
Insert the wires marked with the Z1/Z2 motor wire numbers into the corresponding Z-axis motors. Z1/Z2Z
Z2 Z1
 Note: Do not plug and unplug the motor cable with power on, otherwise the motor will be damaged. 
13

7. Load Filament 

1 Check whether the feeding tube is connected properly. 

2 The pellet (diameter 1.0~5.0mm) material is loaded into the feeding barrel. 1.0~5.0mm 

3 Fill with material and cover with barrel cover. 

14

8. Z-axis Offset Z
Select Z-axis offset, wait for the nozzle movement to complete, select the moving distance, and adjust the Z-axis compensation value up and down so that the height from the nozzle to the platform is almost the thickness of A4 paper (0.08-0.1mm). Click OK to save the Z-axis compensation value when completed.  Z  ZA4(0.08-0.1mm)  Z
EN CN
Note: The current interface is for reference only. Due to the continuous upgrade of functions, the actual version of the software/firmware UI shall prevail. :,,/UI 15

9. Level Platform 
1 Select Auto Leveling to automatically level.   2 If the automatic leveling data differs greatly (1mm), please correct the platform by adjusting the black knob under the platform. If the data is a negative value, it s hould be adjusted clockwise. If it is a positive value, it should be adjusted counterclockwise. After the adjustment is completed, automatically level it again to check the flatness of the platform. If the difference is still large, repeat the above operations; (1mm) 


EN CN

Do not beat the feeding tube or press the glass platform in the leveling process;  

Note: The current interface is for reference only. Due to the continuous upgrade of functions, the actual version of the software/firmware UI shall prevail. :,, /UI

16

10. Preheat Settings 
1 For the first printing, you need to extrude material in advance. Click Preheat and then click the nozzle preheat icon to set the corresponding preheating temperatures for the upper part of the nozzle and the lower part of the nozzle according to different materials.Wait for the nozzle to heat up to the predetermined temperature, select the extrusion distance and extrusion speed, and click Feed until the material is extruded smoothly before normal printing operations can be performed.   2 Click Preheat, click the platform preheat icon, set the corresponding platform preheat temperature according to different materials, and preheat the platform in advance before printing. 