Ogrow Large Heavy Duty Walk-In Greenhouse Product Manual

Model # OG4979-2T8, Model # OG03-GBK7449E

Pack Content

NumberPictureQTY.NumberPictureQTY.
A[Connector A]42[25 in. Rod]3
B[Connector B]66[10 in. Rod]20
C[Connector C]27[31 in. Rod]6
D[Connector D]611[17.5 in. Rod]32
E[Connector E]2616[35.5 in. Rod]30
F[Connector F]1X[Shelf Grid]8
G[Connector G]2Y[Greenhouse Cover]1
Anchors[Anchor]4Ropes[Rope]4

Capacity: 75 lbs per shelf

Assembly Instructions

IMPORTANT: Please check contents before attempting to construct growhouse. Arrange parts into groups as listed in your pack contents. Unfold cover and put to one side.

Step 1

4xD 8xE 8x16 2x2 6x6 12x11. Assemble the base with the above parts.

Step 2

8xE 4xB 4x6 12x11 6x6 8x16 4xX. This forms the next level. Once completed, build the next level with parts listed in step 3.

Step 3

8xE 2xB 4x6 8x11 2xD 6x6 8x16 4xX. This forms the next level. Once completed, build the next level with parts listed in step 4.

Step 4

4xA 2xC 2xE 1x2 4x16 2x6 6x7. This forms the next level. Once completed, build the next level with parts listed in step 5.

Step 5

2xG 1xF 2x16. This forms the final level. Once completed, place the cover (Y) over the frame and attach.

Step 6

In order to have the frame connected, you will need to assemble the frame by pushing downward while connecting two rods at a time, giving it an extra force (when frame is complete, repeat from all angles, as picture shown). This will result in a tighter and smaller frame enabling the greenhouse cover to slide on easily.

Visual description: A person is shown assembling the greenhouse frame, pushing down on the structure while connecting rods.

Anchor Kit Assembly Instructions

Step 1

Hammer the anchors into the soil, placing them on all four sides of the greenhouse.

Visual description: A hand is shown hammering an anchor into the ground next to the greenhouse base.

Step 2

Connect the top end of the rope into the strap on the top of the greenhouse for all 4 sides as image shown.

Visual description: A rope is being connected to a strap at the top corner of the greenhouse.

Step 3

Take the other end of the rope and pass it through the bended side of anchor as shown in figure. Repeat the step for all 4 sides.

Visual description: The free end of the rope is being threaded through the bent end of an anchor stake in the ground.

Models: OG4979-2T8, OG03-GBK7449E, Portable Lawn and Garden Greenhouse

File Info : application/pdf, 4 Pages, 16.45MB

PDF preview unavailable. Download the PDF instead.

1385484 Man1

References

Adobe Illustrator CS5 Adobe PDF library 9.90