Ogrow Large Heavy Duty Walk-In Greenhouse Product Manual
Model # OG4979-2T8, Model # OG03-GBK7449E
Pack Content
Number | Picture | QTY. | Number | Picture | QTY. |
---|---|---|---|---|---|
A | [Connector A] | 4 | 2 | [25 in. Rod] | 3 |
B | [Connector B] | 6 | 6 | [10 in. Rod] | 20 |
C | [Connector C] | 2 | 7 | [31 in. Rod] | 6 |
D | [Connector D] | 6 | 11 | [17.5 in. Rod] | 32 |
E | [Connector E] | 26 | 16 | [35.5 in. Rod] | 30 |
F | [Connector F] | 1 | X | [Shelf Grid] | 8 |
G | [Connector G] | 2 | Y | [Greenhouse Cover] | 1 |
Anchors | [Anchor] | 4 | Ropes | [Rope] | 4 |
Capacity: 75 lbs per shelf
Assembly Instructions
IMPORTANT: Please check contents before attempting to construct growhouse. Arrange parts into groups as listed in your pack contents. Unfold cover and put to one side.
Step 1
4xD 8xE 8x16 2x2 6x6 12x11. Assemble the base with the above parts.
Step 2
8xE 4xB 4x6 12x11 6x6 8x16 4xX. This forms the next level. Once completed, build the next level with parts listed in step 3.
Step 3
8xE 2xB 4x6 8x11 2xD 6x6 8x16 4xX. This forms the next level. Once completed, build the next level with parts listed in step 4.
Step 4
4xA 2xC 2xE 1x2 4x16 2x6 6x7. This forms the next level. Once completed, build the next level with parts listed in step 5.
Step 5
2xG 1xF 2x16. This forms the final level. Once completed, place the cover (Y) over the frame and attach.
Step 6
In order to have the frame connected, you will need to assemble the frame by pushing downward while connecting two rods at a time, giving it an extra force (when frame is complete, repeat from all angles, as picture shown). This will result in a tighter and smaller frame enabling the greenhouse cover to slide on easily.
Visual description: A person is shown assembling the greenhouse frame, pushing down on the structure while connecting rods.
Anchor Kit Assembly Instructions
Step 1
Hammer the anchors into the soil, placing them on all four sides of the greenhouse.
Visual description: A hand is shown hammering an anchor into the ground next to the greenhouse base.
Step 2
Connect the top end of the rope into the strap on the top of the greenhouse for all 4 sides as image shown.
Visual description: A rope is being connected to a strap at the top corner of the greenhouse.
Step 3
Take the other end of the rope and pass it through the bended side of anchor as shown in figure. Repeat the step for all 4 sides.
Visual description: The free end of the rope is being threaded through the bent end of an anchor stake in the ground.