
Pilot Operated Proportional DC Valve Operating instructions Series D*1FB*EE
D 1FB EE 5715-694 13 UK Bulletin HY11-5715-694/UK
Operating instructions Series D*1FB*EE
Design series 13 II 2 G c T4 Gb -20 °C < Ta < +40 °C
Pilot Operated Proportional DC Valve
Parker Hannifin Manufacturing Germany GmbH & Co. KG Hydraulic Controls Division Europe Gutenbergstr. 38 41564 Kaarst, Germany Tel.: (+49) 181 99 44 43 0 E-mail: valveshcd@parker.com Copyright © 2015, Parker Hannifin Corp.
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
WARNING -- USER RESPONSIBILITY
FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS DESCRIBED HEREIN OR RELATED ITEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from Parker-Hannifin Corporation, its subsidiaries and authorized distributors provide product or system options for further investigation by users having technical expertise. The user, through its own analysis and testing, is solely responsible for making the final selection of the system and components and assuring that all performance, endurance, maintenance, safety and warning requirements of the application are met. The user must analyze all aspects of the application, follow applicable industry standards, and follow the information concerning the product in the current product catalog and in any other materials provided from Parker or its subsidiaries or authorized distributors. To the extent that Parker or its subsidiaries or authorized distributors provide component or system options based upon data or specifications provided by the user, the user is responsible for determining that such data and specifications are suitable and sufficient for all applications and reasonably foreseeable uses of the components or systems.
Offer of Sale
Please contact your Parker representation for a detailed "Offer of Sale".
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
2
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Contents
0. EC declaration of conformity 1. Introduction
Ordering code Technical data Characteristic curves Pilot oil Dimensions Name plate
2. Safety instructions Symbols Marking, name plates Work on the valve
3. Important information Correct use Common instructions Liability Storage
4. Installation Scope of delivery Installation Electrical connection Operation limits Pressure fluids
5. Operating instructions Electronic control system Air bleeding of hydraulic system Filter Flushing
6. Maintenance
7. Troubleshooting
A1 Extract from standards/directives
A2 User guide Solenoid
A3 Type-examination certificate Solenoid
A4 Declaration of conformity Solenoid
A5 Mounting instruction cable gland
Page
4 5 6 7 7 8 9 11
11 11 11 11
12 12 12 12 12
13 13 13 13 13 13
16 16 16 16 16
16
18
19
20
22
36
37
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
3
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
0. EC declaration of conformity
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
4
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
1. Introduction
The new series of pilot operated proportional directional valves D*1FB*EE comes in 4 sizes:
D31FB*EE NG10 (CETOP 05) D41FB*EE NG16 (CETOP 07) D91FB*EE NG25 (CETOP 08) D111FB*EE NG32 (CETOP 10)
The D*1FB*EE series with explosion proof solenoids is based on the standard D*1FB series. The specific solenoid design allows the usage in hazardous environments.
The explosion proof class is
D31FB
D41FB
Ex e mb II T4 Gb for use in zone 1 and 2 (conform to ATEX).
Additionally the solenoids are IECEx compliant.
The parameters can be saved, changed and dupli- D91FB
cated in combination with the digital power ampli-
fier PWD00A-400 (to be used in an explosion proof
cabinet or outside of the hazardous area).
The valve parameters can be edited with the com-
A B
mon ProPxD software.
a 0 b
PT
Technical Features
· Progressive flow characteristics for sensitive
adjustment of flow rate
D91VW
· High flow capacity
D111FB
D91FB*EE
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
5
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Ordering code
D
1 FB
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
E0
EE
Directional control valve
Size
NG06 pilot
Dynamics standard
Proportional control
Spool type
Flow
Pilot
Solenoid
Valve
Connection
connection description accessories Explosion proof
with cable glands
Ex e mb II T4 Gb
+ IECEx
Spool
Seal
Explosion
Design conformity
position
proof
series
(not required
for ordering)
Code Nominal size 3 NG10 / CETOP 05 4 NG16 / CETOP 07 9 1) NG25 / CETOP 08 11 NG32 / CETOP 10
Code E01 E02 B31
B32
Spool type
QB = QA /2 QB = QA /2
Code
J K
Solenoid description
24 V / 1.15 A
12 V / 2.3 A
Code N V
Seals NBR FPM
Code 1 2 4 5
Inlet Internal External Internal External
Drain External External Internal Internal
Code
B C D E F H L
Flow [l/min] at Dp = 5 bar per metering edge
D31
D41
D91
D111
100 2)
75 2)
130 2)
90
120
250 2)
200
400
1000
Code C E K
Spool position
1) With enlarged connections Ø 32 mm 2) Not for spool type B31 and B32
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
6
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Technical data
General Design Actuation Size Mounting interface Mounting position Ambient temperature MTTFD value Weight Vibration resistance
Hydraulic Max. operating pressure
Fluid Fluid temperature Viscosity
permitted recommended Filtration Nominal flow at Dp=5 bar per control edge * Leakage at 100 bar Pilot supply pressure
Pilot flow at 100bar Pilot flow, step response Static / Dynamic Step response at 100% step Hysteresis Electrical characteristics Duty ratio Protection class
Solenoid Supply voltage Current consumption Resistance Solenoid connection Wiring min. Wiring lenght max.
[°C] [years]
[kg] [g]
Pilot operated DC valve
Proportional solenoid
NG10 (CETOP05) NG16 (CETOP07) NG25 (CETOP08)
DIN 24340 / ISO 4401 / CETOP RP121 / NFPA
unrestriced
-20...+40
75
9.4
12.8
20.3
10 Sinus 5...200 Hz acc. IEC 68-2-6
30 Random noise 20...20 Hz acc. IEC 68-2-36
15 Shock acc. IEC 68-2-27
NG32 (CETOP10) 69.3
[bar] [bar]
[°C]
Pilot drain internal: P, A, B, X 350; T, Y 185 Pilot drain external: P, A, B, T, X 350; Y 185 Hydraulic oil as per DIN 51524...535, other on request -20...+40
[cSt] / [mm2/s] 20...380 [cSt] / [mm2/s] 30...80
ISO 4406 (1999) 18/16/13 (acc. NAS 1638: 7)
[l/min] [ml/min]
[bar] [bar] [l/min] [l/min]
75/90/120
130/200
100
200
min. 30 (+ T/Y pressure), max. 350
optimal dynamics at 50
<0.5
<1.2
2.0
1.9
250/400 600
<1.2 4.5
1000 1000
<1.2 18
[ms]
50
[%] <5
75
100
180
[%] 100
Code [V] [A]
[Ohm]
[mm²] [m]
, Ex e mb II T4, IP66
K
J
12
24
2.3
1.15
3.7
14.8
Box with M20x1.5 entry for cableglands. Solenoid identificationas per ISO 9461.
3 x 1.5 recommended
50 recommended
With electrical connections the protective conductor (PE W) must be connected according to the relevant regulations.
* Flow rate for different p per control edge:
D*1FB Flow characteristics at p = 5 bar per metering edge Spool code E*
Qx = QNom. ·
px pNom.
Spool code B*
All characteristic curves measured with HLP46 at 50° C. D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
7
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Pilot oil inlet (supply) and outlet (drain)
D31FB
PT
T
open, closed
B M6 DIN906
Pilot oil
Inlet Drain B
C
internal external
external external
internal internal
C M6 DIN906 external internal
Y (drawn offset)
AB
a0b
)( )(
A
B
P
xy
T
B
C
D41FB
PT
open, closed
Pilot oil
Inlet Drain B
C
internal external
C M6 DIN906
external external internal internal
B 1/16 NPTF
external internal
AB
a0b
)( )(
A
B
P
xy
T
B
C
D91FB
PT
open, closed
Pilot oil
Inlet Drain B
C
C M6 DIN906
internal external
B 1/16 NPTF
external external
internal internal
external internal
AB
a0b
)( )(
A
B
P
xy
T
B
C
D111FB
PT
C 1/16 NPTF
open, closed
Pilot oil
B 1/16 NPTF
Inlet Drain B
C
internal external
external external
internal internal
external internal
AB
a0b
)( )(
A
B
P
xy
T
B
C
X
Y
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
8
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Dimensions D31FB
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Surface finish D41FB
BK385
4x M6x40 ISO 4762-12.9
13.2 Nm ±15 %
NBR: SK-D31FB-N FPM: SK-D31FB-V
Surface finish BK320
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
2x M6x55 4x M10x60 ISO 4762-12.9
13.2 Nm ±15 % 63 Nm ±15 %
NBR: SK-D41FB-N FPM: SK-D41FB-V
9
Parker Hannifin Corporation
Hydraulics Group
Operating Instructions
D91FB
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
B A
130 238
57
12 116 118
A B
Ø13.5
76
230
Surface finish D111FB
BK360
6x M12x75 ISO 4762-12.9
108 Nm ±15%
NBR: SK-D91FB-N FPM: SK-D91FB-V
B A
229 362
59
20 198 200
A B
Ø22
96
325
Surface finish
BK386
6x M20x90 ISO 4762-12.9
517 Nm ±15%
NBR: SK-D111FB-N FPM: SK-D111FB-V
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
10
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Name plate
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Code for year and month of manufacture Manufacturer's logo and address Entire name of the complete valve Hydraulic data Hydraulic symbol CE mark, Ex protection symbol and explosion protection class of the complete valve to European Directive 94/9/EC
2. Safety instructions
Read the operating instructions thoroughly before installation, commissioning, maintenance, repair and storage, and observe them. Failure to observe the operating instructions may result in damage to the valve or the parts of the system connected to it.
In particular, in the case of explosive atmospheres, any failure to observe the operating instructions may result in an explosion.
The system operator must make these operating instructions visible and easily accessible to operating and maintenance personnel.
Compliance with applicable standards/legal requirements must be enforced. This particularly applies to plant safety and environmental protection.
A list of such standards, etc. appears in the annex by way of example.
Before starting commissioning, installation, maintenance and repair work, the hydraulic system must be depressurised and power must be disconnected from the electrical installation.
In addition, the electrical installation must be secured so that power cannot be restored unexpectedly.
The valve may become hot during operation. To avoid risk of burns, do not touch the valve surface.
The system operator must monitor the temperature and cool the oil if necessary in order to the keep within the maximum temperatures set out in these operating instructions (see technical data). In this connection, observe the relevant directions in the operating instructions of the supplier (solenoid system).
Any leaks occurring at the valve must be rectified immediately.
Symbols These instructions use symbols that must be noted according to their importance:
Notes relating to the warranty
Notes relating to potential damage to the valve or connected system components
Notes relating to potential hazards
Useful additional information
Marking, Name plates Information attached directly to the valve such as circuit plans and Name plates must be observed and kept in a legible state. Work on the valve Work relating to the installation, commissioning, maintenance and repair of the valve may only be carried out by qualified persons. Qualified persons are defined as persons who, on the basis of education, experience and instruction, have sufficient knowledge of applicable requirements and accepted rules of the technology. Throughout any installation, commissioning, maintenance and repair work, it is the responsibility of the operator to ensure that there is no risk of explosion. Before starting such work, the operator has to ensure that tools and equipment are only used if they do not damage the valve and they do not leave behind residues that are inflammable. In addition, clean the valve before starting such work, in particular removing dust, liquids and other deposits. Cleaning should be done using a lint-free cloth. Tools may not be used if they might cause a static charge on use.
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
11
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
3. Important information
Correct use
These operating instructions apply to proportional DC valves of series D*1FB*EE, which are intended solely for use in mineral oil based hydraulic systems (DIN 51524).
Compliance with the operating instructions must be ensured.
It is the responsibility of the operator to ensure that the information in the technical data is followed.
Any different or modified use is not classed as correct use.
The manufacturer's warranty will not cover any resulting damage.
Storage
If the valve needs to be temporarily stored, it must be protected from dirt, the weather, and mechanical damage. Each valve is tested with hydraulic oil in the factory, so that the internal components are protected from corrosion. However, this protection can only be guaranteed under the following conditions:
Storage time 12 months
6 months
Storage requirements constant air humidity < 60 % constant temperature < 25 °C varying air humidity,
varying temperature < 35 °C
Common instructions
We reserve the right to make technical changes as a result of further development of the product described in these operating instructions. Figures and drawings in these instructions are simplified depictions. As a result of further development, improvements and changes to the product, it is possible that the figures are not fully consistent with the described valve. The technical details and dimensions are nonbinding.They may not form the basis of any claims. Copyright reserved.
Storage outside or in maritime or tropical climates leads to corrosion and may make the valve unusable.
Liability The manufacturer cannot accept liability for loss or damage resulting from the following faults: · incorrect installation · unqualified operation · inadequate maintenance · use beyond specification
Do not dismantle the valve. If you suspect a defect, return the valve to Parker.
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
12
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
4. Installation
Scope of delivery
As soon as you receive the valve you should check if the package has the specified contents. In particular, check whether the type of protection indicated on the valve is as described in these operating instructions. The scope of delivery includes:
· Valve
· Operating instructions (including operating instructions of the valve as well as of the solenoid and the declarations of conformity of the manufactures)
As soon as you receive the shipment, please check for any obvious signs of damage caused by careless transport. Document the transport damage and immediately notify the carrier, the insurance company and the supplier.
Installation
· Compare the valve type as stated on the Name plate with the parts list/circuit diagram.
· The valve can be installed in any position, either fixed or movable.
Check the fixing surface and the cavity for the valve. Permitted values: unevenness 0.01 mm/100 mm, roughness Rmax = 6.3 m. Keep the valve mounting surface and the area clean.
· Before installation, remove the protective cover from the valve ports.
· Check that the valve ports and the O-rings are in the correct position.
· Use fastening screws as indicated in the catalogue, property class 12.9 to ISO 4762.
Parker can supply the correct screw sets, see the catalogue for order numbers.
· Tighten the screws diagonally, torque as specified in the catalogue.
· Any deficiencies of the valve mounting surface may result in operating disruptions. Faulty fixing and incorrect screw tightening torques may lead to the sudden escape of hydraulic fluid at the ports.
The valve must be connected to the equipotential bonding system of the hydraulic system.
Electrical connection
Observe operating instruction D14-2114PD-* in the annex.
Operation limits
The valve may only be deployed with the specified limits of use. The relevant details can be found in the catalogue sheet under "Technical data" and "Characteristic curves".
Observe the ambient conditions. Unauthorised temperatures, shocks, the effects of aggressive chemicals, radiation, unauthorised electromagnetic emissions may result in disruptions and failures. Observe the limits of operation set out in "Technical data".
Excessive temperatures may cause the solenoid to overheat, creating the risk of explosion. To permit adequate heat dissipation, the solenoid coil should not be painted.
Pressure fluids
The following rules applies for the operation with various pressure fluids:
This information serves for orientation and does not substitute user tests among the particular operating conditions. Particularly no liabiliy for media compatibility may be derived out of it.
Mineral oil: usable without restriction.
For operation with the following pressure fluids please consult Parker:
HFA HFB HFC HFD
oil-in-water emulsion water-in-oil emulsion aqueous solution (glycols) unhydrous fluids (Phosphor-Ester)
For detailed information concerning pressure fluids note VDMA-document 24317 as well as DIN 51524 & 51502.
Special gaskets may be available depending on the utilized fluid. In case of insecurity please consult Parker.
The pressure fluid must have an ignition temperature of at least 50 K above the maximum surface temperature of the valve (see EN 13463-5 and IEC 60079-4).
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
13
Parker Hannifin Corporation
Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Size 10, mounting pattern ISO 4401-05-05-0-05
Size 16, mounting pattern ISO 4401-07-07-0-05
With * marked dimensions ± 0.1mm. All other dimensions ± 0.2mm.
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
14
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
Size 25, mounting pattern ISO 4401-08-08-0-05
Size 32, mounting pattern ISO 4401-10-09-0-05
With * marked dimensions ± 0.1mm. All other dimensions ± 0.2mm.
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
15
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
5. Operating instructions Electronic control system The valve must be operated by a suitable electronic control system.
The appropriate electronic control system can be selected from the catalogue ("Electronics" section). Please ask the factory. if further guidance is required. Connecting to an unsuitable electronic control system may result in irreparable damage to the valve or the electronic control system. If you are using the Parker PCD00A-400 digital module, make sure that the module runs outside the Ex area or inside an electrical cabinet certified for use in the Ex zone.
Air bleeding of hydraulic system During initial startup, after an oil change as well as after the opening of lines or valves the hydraulic system must be air bleeded.
Filter The function and lifetime of the valve are strongly affected by the cleanliness of the fluid. Purity level class of 18/16/13 acc. ISO4406 is required.
Pay attention to maintenance details!
6. Maintenance
Maintenance procedures may only be carried out by specialist personnel. A detailed knowledge is required of how the machine is switched on and off and also of the necessary safety measures.
Regular maintenance is essential in prolonging the service life of the systems, and safeguards plant safety and operational availability. The following items must be checked at regular and short intervals:
· Oil level in tank · Max. medium temperature · Max. surface temperature · Condition of the pressure fluid (sight check,
colour and smell of hydraulic fluid) · Operating pressures · Preload pressure of pressure vessel (if present) · No leaks at any system components · Condition of the filter elements · Condition of the hose lines · Cleanliness of components After a certain period of service, the hydraulic fluid must be replaced. The frequency of the change depends on the following circumstances: · Type and grade of pressure fluid (ageing) · Filtration · Operating temperature and ambient conditions
Flushing
It is recommended to flush the pipelines by short circuiting the pressure and return lines.This prevents the installation dirt from entering the valve.
Replacement of a coil
In case of a necessary replacement of a coil the disassembly and assembly instructions on drawing 35015707 (see next page) have to be observed. Before exchanging a coil the name plates of old and new coil have to be checked. It must be ensured that only coils with identical voltages are used. Available coil kits are: AK-D1FBCJEE318 AK-D1FBCKEE318 The coils of series D1FB*18 are suitable for D*1FB valves of series 12 and 13.
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
16
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
17
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
7. Troubleshooting
A systematic approach must always be used in the troubleshooting process. Begin by answering the following questions:
· Does anyone have practical experience with similar faults?
· Have any of the settings been changed in the system?
Now try to identify the fault using a prioritised list of the most likely causes.
· If you suspect that the valve is not moving freely, you should flush the valve with clean pressure fluid.
· A systematic approach should always be adopted when troubleshooting a hydraulic system.
The work must only be carried out by specialist personnel because detailed knowledge of the function and structure of the system is required. Always think carefully about changing settings or removing components. Before starting work, check that the system was working correctly before the fault occurred.
Following any repair, commissioning must be carried out as instructed.
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
18
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
A1.
Standards, directives and provisions relating to the operation of systems in potentially explosive areas (extract)
1999/92/EC
Minimum requirements for improving the safety and health protection of workers potentially at risk from explosive atmospheres
2004/108/EC
Electromagnetic compatibility directive (EMC)
EN ISO 12100:2010 Safety of machinery General principles for design risk assessment and risk reduction
EN 15198:2007 Methodology for risk assessment of non-electrical equipment and components for intended use in potentially explosive atmospheres
EN 60079-0:2009 Explosive atmospheres Part 0: Equipment General requirements
EN 60079-7:2007 Explosive atmospheres Part 7: Equipment protection by increased safety "e"
EN 60079-14:2009 Explosive atmospheres Part 14: Electrical installations design, selection and erection (IEC 60079-14:2013)
EN 60079-17:2014 Explosive atmospheres Part 17: Electrical installations inspection and maintenance (IEC 60079-17:2013)
EN 60529:2014 Degrees of protection provided by enclosures (IP code) (IEC 60529:1989 + A1:1999 + A2:2013)
BetrSichV
Ordinance on industrial safety and health
TRBS 2153:2009 Technical rules for operating safety Avoiding ignition hazards as a result of electrostatic charges
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
19
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
A2. User guide Solenoid
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
20
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
21
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
A3. Type-examination certificate Solenoid
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
22
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
23
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
24
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
25
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
26
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
27
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
28
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
29
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
30
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
31
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
32
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
33
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
34
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
35
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
A4. Declaration of conformity - Solenoid
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
36
Parker Hannifin Corporation Hydraulics Group
Operating Instructions
A5. Mounting instruction cable gland
Pilot Operated Proportional DC Valve Series D*1FB*EE Explosion Proof
D_1FB_EE 5715-694_13 UK.indd CM 26.05.15
37
Parker Hannifin Corporation Hydraulics Group
Adobe PDF Library 9.9 Adobe InDesign CS5.5 (7.5.3)