Autofill Storm POU Water Cooler Quick Start Guide
External Parts of the Autofill Storm POU
The water cooler has several external parts labeled for identification:
- 1: Child Resistant
- 2: Hot Water Lever
- 3: Cold Water Lever
- 4: Low Water Level Indicator
- 5: SmartFlo™ Plus Change indicator
- 6: Water Outlet
- 7: Drip Tray and Cover
- 8: Dispense Light
- 9: Hot Tank Power Switch
- 10: Corrugated Tube
- 11: Water Reservoir
- 12: Blue Elbow Fitting
- 13: Water Reservoir Cover
- 14: Water Supply/Water Line
- 15: Blue Fitting
Diagram showing the external parts of the water cooler with numbered callouts, including the SmartFlo™ Plus Water Cartridge.
Important Safety Information: This unit dispenses water at temperatures that can cause severe burns. It is not intended for use by persons with reduced physical, sensory, or mental capabilities, or lack of experience and knowledge, unless supervised. Children should be supervised to ensure they do not play with the appliance.
The customer acknowledges that liquids can cause damage to surfaces and takes responsibility for cooler placement. The customer is responsible for addressing drips, leaks, or spillages. For technical questions or problems, contact the local water company or water dispenser supplier.
Setup Instructions
Step 1: Preparation
Remove all packaging and shipping materials. Position the dispenser at least 4 inches (10 cm) away from the wall for ventilation and within 5 feet of a 115V AC receptacle. Ensure the dispenser stands upright for 24 hours before proceeding. DO NOT plug in the cooler yet.
Step 2: Open Bottle Compartment
Open the bottle compartment by lifting upwards on the door window.
Diagram showing how to open the bottle compartment door.
Step 3: Install Filters
Install filters (not provided) onto the metal bracket using the provided mounting holes.
Diagram showing filter installation onto a metal bracket.
Step 4: Connect Water Supply
Connect the mains water supply using the provided 1/4 inch supply tube. Route the tube through the condenser bushing and affix it to the condenser. If using filters, connect the line to the filters before routing to the reservoir white cap fitting.
Water Inlet Pressure Requirements: Minimum 20PSI (0.138MPa), Maximum 80PSI (0.552MPa). A pressure reducing valve is required if pressure exceeds 80PSI.
Ensure tubing is not kinked or cut. If no filtration system is installed, the water line can connect directly to the POU system's water line. Ensure the indicator is GREEN; if RED, slide the lever forward to reset.
Diagram illustrating the connection of the water supply line, including routing through the condenser bushing and connection to filters.
Step 5: Connect Reservoir Adaptor
Carefully push the reservoir adaptor corrugated tube through the reservoir cover until the blue elbow is flush with the cover and the tube end touches the bottom of the reservoir. Locate the SmartFlo™ Plus water supply tube dangling from the mid shelf. Remove the red protective silicone cap from the blue fitting on this tube. Connect the corrugated tube to the reservoir adaptor blue elbow, pushing firmly with a slight turning action for a tight connection.
Diagram showing the connection of the corrugated tube to the reservoir adaptor blue elbow and the SmartFlo™ Plus water supply tube.
Step 6: Initial Water Flow Check
With the POU Assembly outside the cooler compartment on a flat surface, turn on the water supply and check for leaks. Ensure the reservoir is filling. DO NOT turn on the Hot Tank Power Switch yet (ensure it is in the OFF position).
Electrical Safety Note: For protection against shock, this unit MUST be connected to a Ground Fault Circuit Interrupter (GFCI) outlet. DO NOT USE AN EXTENSION CORD. Doing so may result in personal injury or property damage and will void manufacturer warranties.
Diagram showing the initial water flow check and the location of the Hot Tank Power Switch.
Step 7: Priming the System
Once the reservoir is at least 1/2 full, slide the POU Assembly into the cabinet and close the lower door. The system will automatically prime, taking approximately 90 seconds. You should hear the SmartFlo™ Plus water pump running. If not, confirm the unit is plugged into an active power supply.
Diagram showing the POU Assembly being inserted into the cabinet and the priming process.
Step 8: Dispense and Power On
After the pump stops priming, dispense 2-3 oz of water by placing a cup under the dispense nozzle and depressing the hot and cold levers separately for a few seconds each. The Hot Tank Power Switch can now be turned to the ON position.
Diagram showing dispensing water and turning on the Hot Tank Power Switch.
Step 9: Optimal Temperature
For best results, do not draw water until it has had time to heat and chill to optimum temperatures. This may take 1-2 hours depending on room temperature.
Illustration of a person enjoying a glass of water from the cooler.
Final Check: Ensure the cooler stands upright for 24 hours before plugging it in. Read all instructions completely before setting up for operation.
Document Reference: DOC-C100226 Rev0724