(BAGUO)SKU1,3,4PoolLadders-20241010 1728877301028 Technical Support and E-Warranty Certificate www.vevor.com/support
Pool Ladders
MODEL: U12 taupe / U12 white / U12 gray
We continue to be committed to provide you tools with competitive price. "Save Half", "Half Price" or any other similar expressions used by us only represents an estimate of savings you might benefit from buying certain tools with us compared to the major top brands and does not necessarily mean to cover all categories of tools offered by us. You are kindly reminded to verify carefully
when you are placing an order with us if you are actually Saving Half in comparison with the top major brands.
Pool Ladders
MODEL: U12 taupe / U12 white / U12 gray
NEED HELP? CONTACT US! Have product questions? Need technical support? Please feel free to contact us:
Technical Support and E-Warranty Certificate www.vevor.com/support
This is the original instruction, please read all manual instructions carefully before operating. VEVOR reserves a clear interpretation of our
user manual. The appearance of the product shall be subject to the product you received. Please forgive us that we won't inform you again if
there are any technology or software updates on our product.
-1-
Part List
-2-
Installation Procedure
Step 01:Assemble side panels, same on both sides.
Step 02:Secure the side panels with screws.
-3-
Step 03:Install the base. Note: The "H" printed face up.
Step 04:Install the connecting rod as shown.
-4-
Step 05:Install the first step riser and pedal successively as shown in the figure.Other steps need to be installed after sand filling.
Step 06:Install the handrail as shown.
-5-
Step 07:After installing the handrail, fill a total of 20kg of clean sand according to the figure.Make the pool sink better.
Step 08:Install the remaining riser and pedals as shown in step 05.
-6-
Step 09:Slip the retaining plate into the rear armrest standpipe.
Step 10:Assemble the upper handrail as shown.
-7-
Step 11:Place the ladder into the pool and make sure the back of the ladder is next to the pool wall. Finally, fasten the ladder to the ground with screws.
-8-
Manufacturer: Shanghaimuxinmuyeyouxiangongsi Address: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Imported to AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia Imported to USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
YH CONSULTING LIMITED.
UK REP C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX E-CrossStu GmbH
EC REP Mainzer Landstr.69, 60329 Frankfurt am Main.
-9-
Technical Support and E-Warranty Certificate www.vevor.com/support
Machine Translated by Google
Assistance technique et certificat de garantie électronique www.vevor.com/support
Échelles de piscine
MODÈLE : U12 taupe / U12 blanc / U12 gris
Nous continuons à nous engager à vous fournir des outils à des prix compétitifs. « Économisez la moitié », « Moitié prix » ou toute autre expression similaire utilisée par nous ne représente qu'une estimation des économies que vous pourriez réaliser en achetant certains outils chez nous par rapport aux grandes marques et ne couvre pas nécessairement toutes les catégories d'outils que nous proposons. Nous vous rappelons de bien vouloir vérifier
soigneusement lorsque vous passez une commande chez nous si vous économisez réellement la moitié par rapport aux grandes marques.
Machine Translated by Google
Machine Translated by Google MODÈLE : U12 taupe / U12 blanc / U12 gris
Échelles de piscine
BESOIN D'AIDE? CONTACTEZNOUS!
Vous avez des questions sur nos produits ? Vous avez besoin d'assistance technique ? N'hésitez pas
à nous contacter : Assistance technique et certificat de garantie électronique www.vevor.com/support
Il s'agit de la notice d'utilisation d'origine. Veuillez lire attentivement toutes les instructions du manuel avant de l'utiliser. VEVOR se réserve le droit d'interpréter clairement
notre manuel d'utilisation. L'apparence du produit dépend du produit que vous avez reçu. Veuillez nous excuser, nous ne vous informerons plus si des mises à jour technologiques
ou logicielles sont disponibles sur notre produit.
1
Machine Translated by Google
Liste des pièces
2
Machine Translated by Google
Procédure d'installation
Étape 01 : Assemblez les panneaux latéraux, identiques des deux côtés.
Étape 02 : Fixez les panneaux latéraux avec des vis.
3
Machine Translated by Google
Étape 03 : Installez la base. Remarque : le « H » imprimé est orienté vers le haut.
Étape 04 : Installez la bielle comme indiqué.
4
Machine Translated by Google
Étape 05 : Installez successivement la première marche et la pédale comme indiqué sur la figure. Les autres marches doivent être installées après le remplissage de sable.
Étape 06 : Installez la main courante comme indiqué.
5
Machine Translated by Google
Étape 07 : Après avoir installé la main courante, remplissez un total de 20 kg de sable propre selon la figure. Améliorez l'enfoncement de la piscine.
Étape 08 : Installez la colonne montante et les pédales restantes comme indiqué à l'étape 05.
6
Machine Translated by Google
Étape 09 : Faites glisser la plaque de retenue dans le tube de support de l'accoudoir arrière.
Étape 10 : Assemblez la rampe supérieure comme indiqué.
7
Machine Translated by Google
Étape 11 : Placez l'échelle dans la piscine et assurezvous que l'arrière de la l'échelle est à côté du mur de la piscine. Enfin, fixez l'échelle au sol avec des vis.
8
Machine Translated by Google
Fabricant : Shanghaimuxinmuyeyouxiangongsi Adresse : Shuangchenglu 803nong11hao1602A1609shi, baoshanqu, Shanghai 200000 CN. Importé en Australie : SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australie
Importé aux ÉtatsUnis : Sanven Technology Ltd. Suite 250, 9166 Anaheim Lieu, Rancho Cucamonga, CA 91730
REPRÉSENTANT DU ROYAUMEUNI
YH CONSULTING LIMITÉE. A/S YH Consulting Limited Bureau 147, Centurion House, London Road, StainesuponThames, Surrey, TW18 4AX
REPRÉSENTANT DE LA CE
ECrossStu GmbH
Mainzer Landstr.69, 60329 FrancfortsurleMain.
9
Machine Translated by Google
Assistance technique et certificat de garantie électronique www.vevor.com/support
Machine Translated by Google
Technischer Support und E-Garantie-Zertifikat www.vevor.com/support
Poolleitern
MODELL: U12 taupe / U12 weiß / U12 grau
Wir sind weiterhin bestrebt, Ihnen Werkzeuge zu wettbewerbsfähigen Preisen anzubieten. ,,Sparen Sie die Hälfte", ,,Halber Preis" oder andere ähnliche Ausdrücke, die wir verwenden, stellen nur eine Schätzung der Ersparnis dar, die Sie beim Kauf bestimmter Werkzeuge bei uns im Vergleich zu den großen Topmarken erzielen können, und decken nicht unbedingt alle von uns angebotenen Werkzeugkategorien ab. Wir möchten Sie freundlich daran erinnern, bei der
Bestellung bei uns sorgfältig zu prüfen, ob Sie im Vergleich zu den großen Topmarken tatsächlich die Hälfte sparen.
Machine Translated by Google
Machine Translated by Google MODELL: U12 taupe / U12 weiß / U12 grau
Poolleitern
Brauchen Sie Hilfe? Kontaktieren Sie uns!
Haben Sie Fragen zum Produkt? Benötigen Sie technischen Support? Bitte kontaktieren Sie uns:
Technischer Support und E-Garantie-Zertifikat www.vevor.com/ support
Dies ist die Originalanleitung. Bitte lesen Sie alle Anweisungen sorgfältig durch, bevor Sie das Gerät in Betrieb nehmen. VEVOR behält sich eine klare Auslegung unserer
Bedienungsanleitung vor. Das Erscheinungsbild des Produkts richtet sich nach dem Produkt, das Sie erhalten haben. Bitte verzeihen Sie uns, dass wir Sie nicht erneut informieren,
wenn es Technologie- oder Software-Updates für unser Produkt gibt.
- 1 -
Machine Translated by Google
Stückliste
- 2 -
Machine Translated by Google
Installationsverfahren
Schritt 01: Seitenteile montieren, auf beiden Seiten gleich.
Schritt 02: Befestigen Sie die Seitenteile mit Schrauben. - 3 -
Machine Translated by Google
Schritt 03: Installieren Sie die Basis. Hinweis: Das aufgedruckte ,,H" zeigt nach oben.
Schritt 04: Installieren Sie die Pleuelstange wie gezeigt.
- 4 -
Machine Translated by Google
Schritt 05: Installieren Sie nacheinander die erste Stufenerhöhung und das Pedal, wie in der Abbildung gezeigt. Die anderen Stufen müssen nach dem Auffüllen des Sandes installiert werden.
Schritt 06: Installieren Sie den Handlauf wie gezeigt.
- 5 -
Machine Translated by Google
Schritt 07: Füllen Sie nach der Montage des Handlaufs insgesamt 20 kg sauberen Sand gemäß der Abbildung ein. Sorgen Sie für ein besseres Einsinken des Pools.
Schritt 08: Installieren Sie die restlichen Erhöhungen und Pedale wie in Schritt 05 gezeigt.
- 6 -
Machine Translated by Google
Schritt 09: Stecken Sie die Halteplatte in das Standrohr der hinteren Armlehne.
Schritt 10: Montieren Sie den oberen Handlauf wie gezeigt. - 7 -
Machine Translated by Google
Schritt 11:Stellen Sie die Leiter in den Pool und stellen Sie sicher, dass die Rückseite der Leiter ist neben der Poolwand. Befestigen Sie zum Schluss die Leiter am Boden mit Schrauben.
- 8 -
Machine Translated by Google
Hersteller: Shanghaimuxinmuyeyouxiangongsi Adresse: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, Shanghai 200000 CN. Nach AUS importiert: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australien
Importiert in die USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Ort, Rancho Cucamonga, CA 91730
UK REP
YH CONSULTING LIMITED. C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
Vertreter der EG
E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
- 9 -
Machine Translated by Google
Technischer Support und E-Garantie-Zertifikat www.vevor.com/support
Machine Translated by Google
Supporto tecnico e certificato di garanzia elettronica www.vevor.com/support
Scale per piscina
MODELLO: U12 tortora / U12 bianco / U12 grigio
Continuiamo a impegnarci per fornirvi strumenti a prezzi competitivi. "Risparmia la metà", "Metà prezzo" o qualsiasi altra espressione simile da noi utilizzata rappresenta solo una stima del risparmio che potresti ottenere acquistando determinati utensili con noi rispetto ai principali marchi principali e non significa necessariamente coprire tutte le categorie di utensili da noi offerti. Ti ricordiamo
gentilmente di verificare attentamente quando effettui un ordine con noi se stai effettivamente risparmiando la metà rispetto ai principali marchi principali.
Machine Translated by Google
Machine Translated by Google MODELLO: U12 tortora / U12 bianco / U12 grigio
Scale per piscina
HAI BISOGNO DI AIUTO? CONTATTACI!
Hai domande sul prodotto? Hai bisogno di supporto tecnico? Non esitare a contattarci: Supporto
tecnico e certificato di garanzia elettronica www.vevor.com/ support
Questa è l'istruzione originale, si prega di leggere attentamente tutte le istruzioni del manuale prima di utilizzare. VEVOR si riserva una chiara interpretazione del nostro manuale
utente. L'aspetto del prodotto sarà soggetto al prodotto ricevuto. Vi preghiamo di perdonarci se non vi informeremo di nuovo se ci sono aggiornamenti tecnologici o software sul
nostro prodotto.
- 1 -
Machine Translated by Google
Elenco delle parti
- 2 -
Machine Translated by Google
Procedura di installazione
Fase 01: Assemblare i pannelli laterali, uguali su entrambi i lati.
Fase 02: Fissare i pannelli laterali con le viti. - 3 -
Machine Translated by Google
Fase 03: Installare la base. Nota: la "H" stampata rivolta verso l'alto.
Fase 04: Installare la biella come mostrato. - 4 -
Machine Translated by Google
Fase 05: Installare il primo gradino e il pedale in successione come mostrato in figura. Gli altri gradini devono essere installati dopo il riempimento con sabbia.
Fase 06: Installare il corrimano come mostrato. - 5 -
Machine Translated by Google
Fase 07: Dopo aver installato il corrimano, riempire con un totale di 20 kg di sabbia pulita, come indicato nella figura. In questo modo la piscina sprofonderà meglio.
Fase 08: Installare il montante e i pedali rimanenti come mostrato nella fase 05.
- 6 -
Machine Translated by Google
Fase 09: Inserire la piastra di fissaggio nel tubo di supporto del bracciolo posteriore.
Fase 10: Montare il corrimano superiore come mostrato. - 7 -
Machine Translated by Google
Fase 11: Posizionare la scaletta nella piscina e assicurarsi che la parte posteriore della
la scala è accanto alla parete della piscina. Infine, fissa la scala a terra con viti.
- 8 -
Machine Translated by Google
Produttore: Shanghaimuxinmuyeyouxiangongsi Indirizzo: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Importato in AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD
Nuovo Galles del Sud 2122 Australia
Importato negli USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Luogo, Rancho Cucamonga, CA 91730
RAPPRESENTANZA DEL REGNO UNITO
CONSULENZA YH LIMITATA. C/O YH Consulting Limited Ufficio 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
Rappresentante della CE
E-CrossStu GmbH Mainzer Landstr.69, 60329 Francoforte sul Meno.
- 9 -
Machine Translated by Google
Supporto tecnico e certificato di garanzia elettronica www.vevor.com/support
Machine Translated by Google
Soporte técnico y certificado de garantía electrónica www.vevor.com/support Escaleras para piscinas
MODELO: U12 gris topo / U12 blanco / U12 gris
Seguimos comprometidos a brindarle herramientas a precios competitivos. "Ahorre la mitad", "mitad de precio" o cualquier otra expresión similar que utilicemos solo representa una estimación del ahorro que podría obtener al comprar ciertas herramientas con nosotros en comparación con las principales marcas y no necesariamente significa que cubra todas las categorías de herramientas que ofrecemos. Le recordamos
que, al realizar un pedido con nosotros, verifique cuidadosamente si realmente está ahorrando la mitad en comparación con las principales marcas.
Machine Translated by Google
Machine Translated by Google MODELO: U12 gris topo / U12 blanco / U12 gris
Escaleras para piscinas
¿NECESITAS AYUDA? ¡CONTÁCTANOS!
¿Tiene preguntas sobre el producto? ¿Necesita asistencia técnica? No dude en ponerse en contacto con
nosotros: Asistencia técnica y certificado de garantía electrónica www.vevor.com/support
Estas son las instrucciones originales, lea atentamente todas las instrucciones del manual antes de utilizar el producto. VEVOR se reserva una interpretación clara de nuestro
manual de usuario. La apariencia del producto estará sujeta al producto que recibió. Perdónenos por no informarle nuevamente si hay actualizaciones de tecnología o software en
nuestro producto.
1
Machine Translated by Google
Lista de piezas
2
Machine Translated by Google
Procedimiento de instalación
Paso 01: Ensamble los paneles laterales, igual en ambos lados.
Paso 02: Asegure los paneles laterales con tornillos. 3
Machine Translated by Google
Paso 03: Instale la base. Nota: La letra "H" impresa debe estar hacia arriba.
Paso 04: Instale la biela como se muestra. 4
Machine Translated by Google
Paso 05: Instale el primer escalón y el pedal sucesivamente como se muestra en la figura. Los demás escalones deben instalarse después del relleno de arena.
Paso 06: Instale el pasamanos como se muestra. 5
Machine Translated by Google
Paso 07: Después de instalar el pasamanos, llene un total de 20 kg de arena limpia según la figura. Haga que la piscina se hunda mejor.
Paso 08: Instale el elevador y los pedales restantes como se muestra en el paso 05. 6
Machine Translated by Google
Paso 09: Deslice la placa de retención en el tubo vertical del apoyabrazos trasero.
Paso 10: Ensamble el pasamanos superior como se muestra. 7
Machine Translated by Google
Paso 11: Coloque la escalera en la piscina y asegúrese de que la parte trasera de la misma La escalera está junto a la pared de la piscina. Por último, fija la escalera al suelo. con tornillos.
8
Machine Translated by Google
Fabricante: Shanghaimuxinmuyeyouxiangongsi Dirección: Shuangchenglu 803nong11hao1602A1609shi, baoshanqu, shanghai 200000 CN. Importado a Australia: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD
Nueva Gales del Sur 2122 Australia
Importado a EE. UU.: Sanven Technology Ltd. Suite 250, 9166 Anaheim Lugar, Rancho Cucamonga, CA 91730
REPRESENTANTE DEL REINO UNIDO
YH CONSULTING LIMITADA.
C/O YH Consulting Limited Oficina 147, Centurion House, London Road, StainesuponThames, Surrey, TW18 4AX
REPRESENTANTE CE
ECrossStu GmbH
Mainzer Landstr.69, 60329 Fráncfort del Meno.
9
Machine Translated by Google
Soporte técnico y certificado de garantía electrónica www.vevor.com/support
Machine Translated by Google
Wsparcie techniczne i certyfikat gwarancji elektronicznej www.vevor.com/support
Drabinki basenowe
MODEL: U12 taupe / U12 bialy / U12 szary
Nadal staramy si oferowa Pastwu narzdzia w konkurencyjnych cenach. ,,Oszczd polow", ,,Polowa ceny" lub inne podobne wyraenia uywane przez nas stanowi jedynie szacunkowe oszczdnoci, jakie moesz uzyska, kupujc u nas okrelone narzdzia w porównaniu z glównymi markami i niekoniecznie oznaczaj one objcie wszystkich kategorii narzdzi oferowanych przez nas. Uprzejmie przypominamy,
aby dokladnie sprawdzi, czy skladajc u nas zamówienie faktycznie oszczdzasz polow w porównaniu z glównymi markami.
Machine Translated by Google
Machine Translated by Google MODEL: U12 taupe / U12 bialy / U12 szary
Drabinki basenowe
POTRZEBUJESZ POMOCY? SKONTAKTUJ SI Z NAMI!
Masz pytania dotyczce produktu? Potrzebujesz wsparcia technicznego? Skontaktuj si z nami: Wsparcie
techniczne i certyfikat E-Gwarancji www.vevor.com/support
To jest oryginalna instrukcja, przed uyciem naley uwanie przeczyta wszystkie instrukcje. VEVOR zastrzega sobie jasn interpretacj naszej instrukcji obslugi. Wygld produktu
bdzie zaleal od produktu, który otrzymale. Prosimy o wybaczenie, e nie poinformujemy Ci ponownie, jeli w naszym produkcie pojawi si jakiekolwiek aktualizacje technologiczne lub
oprogramowania.
- 1 -
Machine Translated by Google
Lista czci
- 2 -
Machine Translated by Google
Procedura instalacji
Krok 01: Zló panele boczne, tak samo po obu stronach.
Krok 02: Przykr panele boczne. - 3 -
Machine Translated by Google
Krok 03: Zainstaluj podstaw. Uwaga: ,,H" wydrukowane do góry.
Krok 04: Zamontuj korbowód zgodnie z rysunkiem. - 4 -
Machine Translated by Google
Krok 05: Zamontuj pierwszy stopie i pedal kolejno, tak jak pokazano na rysunku. Pozostale stopnie naley zamontowa po wypelnieniu ich piaskiem.
Krok 06: Zamontuj porcz tak, jak pokazano. - 5 -
Machine Translated by Google
Krok 7: Po zamontowaniu porczy wsyp do basenu lcznie 20 kg czystego piasku zgodnie z rysunkiem. Poprawi to komfort basenu.
Krok 08: Zamontuj pozostal cz podestu i pedalów, jak pokazano w kroku 05. - 6 -
Machine Translated by Google
Krok 09: Wsu plytk mocujc do rury podlokietnika tylnego.
Krok 10: Zló górn porcz tak, jak pokazano.
- 7 -
Machine Translated by Google
Krok 11: Umie drabin w basenie i upewnij si, e tylna cz drabina jest obok ciany basenu. Na koniec przymocuj drabin do podloa ze rubami.
- 8 -
Machine Translated by Google
Producent: Shanghaimuxinmuyeyouxiangongsi Adres: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, szanghaj 200000 CN. Importowane do AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australia
Importowane do USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Miejsce, Rancho Cucamonga, CA 91730
REP WIELKIEJ BRYTANII
YH CONSULTING LIMITED. C/O YH Consulting Limited Biuro 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
Przedstawiciel UE
E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt nad Menem.
- 9 -
Machine Translated by Google
Wsparcie techniczne i certyfikat gwarancji elektronicznej www.vevor.com/support
Machine Translated by Google
Technische ondersteuning en e-garantiecertificaat www.vevor.com/support
Zwembadladders
MODEL: U12 taupe / U12 wit / U12 grijs
Wij streven er voortdurend naar om u gereedschappen tegen concurrerende prijzen te leveren. "Save Half", "Half Price" of andere soortgelijke uitdrukkingen die wij gebruiken, geven alleen een schatting van de besparingen die u kunt behalen door bepaalde gereedschappen bij ons te kopen in vergelijking met de grote topmerken en betekent niet noodzakelijkerwijs dat alle categorieën gereedschappen die wij aanbieden, worden gedekt. Wij herinneren u eraan om zorgvuldig te
controleren of u daadwerkelijk de helft bespaart in vergelijking met de grote topmerken wanneer u een bestelling bij ons plaatst.
Machine Translated by Google
Machine Translated by Google MODEL: U12 taupe / U12 wit / U12 grijs
Zwembadladders
HULP NODIG? NEEM CONTACT MET ONS OP!
Heeft u vragen over het product? Heeft u technische ondersteuning nodig? Neem dan gerust contact met
ons op: Technische ondersteuning en E-garantiecertificaat www.vevor.com/support
Dit is de originele instructie, lees alle handleidingen zorgvuldig door voordat u het product gebruikt. VEVOR behoudt zich een duidelijke interpretatie van onze
gebruikershandleiding voor. Het uiterlijk van het product is afhankelijk van het product dat u hebt ontvangen. Vergeef ons dat we u niet opnieuw zullen informeren als er technologie-
of software-updates voor ons product zijn.
- 1 -
Machine Translated by Google
Onderdelenlijst
- 2 -
Machine Translated by Google
Installatieprocedure
Stap 01: Monteer de zijpanelen, aan beide kanten hetzelfde.
Stap 02: Bevestig de zijpanelen met schroeven. - 3 -
Machine Translated by Google
Stap 03: Installeer de basis. Let op: De bedrukte "H" moet naar boven wijzen.
Stap 04: Monteer de drijfstang zoals afgebeeld.
- 4 -
Machine Translated by Google
Stap 05: Installeer achtereenvolgens de eerste trede en het pedaal zoals weergegeven in de afbeelding. De andere treden moeten worden geïnstalleerd nadat u het zand hebt opgevuld.
Stap 06: Monteer de leuning zoals afgebeeld.
- 5 -
Machine Translated by Google
Stap 07: Nadat u de leuning hebt geïnstalleerd, vult u het bad met in totaal 20 kg schoon zand volgens de afbeelding. Hierdoor zakt het zwembad beter weg.
Stap 08: Installeer de resterende riser en pedalen zoals getoond in stap 05.
- 6 -
Machine Translated by Google
Stap 09: Schuif de bevestigingsplaat in de standbuis van de achterarmsteun.
Stap 10: Monteer de bovenste leuning zoals afgebeeld. - 7 -
Machine Translated by Google
Stap 11: Plaats de ladder in het zwembad en zorg ervoor dat de achterkant van de ladder staat naast de zwembadwand. Bevestig de ladder ten slotte aan de grond met schroeven.
- 8 -
Machine Translated by Google
Fabrikant: Shanghaimuxinmuyeyouxiangongsi Adres: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Geïmporteerd naar AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australië
Geïmporteerd naar de VS: Sanven Technology Ltd. Suite 250, 9166 Anaheim Plaats, Rancho Cucamonga, CA 91730
VK REP
YH CONSULTING LIMITED. C/O YH Consulting Limited Kantoor 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
EC-REP
E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
- 9 -
Machine Translated by Google
Technische ondersteuning en egarantiecertificaat www.vevor.com/support
Machine Translated by Google
Teknisk support och e-garanticertifikat www.vevor.com/support
Poolstegar
MODELL: U12 taupe / U12 vit / U12 grå
Vi fortsätter att vara engagerade i att ge dig verktyg till konkurrenskraftiga priser. "Spara hälften", "halva priset" eller andra liknande uttryck som används av oss representerar bara en uppskattning av besparingar du kan dra nytta av att köpa vissa verktyg hos oss jämfört med de stora toppmärkena och betyder inte nödvändigtvis att täcka alla kategorier av verktyg som erbjuds av oss. Du påminns om att noggrant kontrollera
när du gör en beställning hos oss om du verkligen sparar hälften i jämförelse med de främsta varumärkena.
Machine Translated by Google
Machine Translated by Google MODELL: U12 taupe / U12 vit / U12 grå
Poolstegar
BEHÖVER HJÄLP? KONTAKTA OSS!
Har du produktfrågor? Behöver du teknisk support? Kontakta oss gärna: Teknisk support och e-
garanticertifikat www.vevor.com/support
Detta är den ursprungliga instruktionen, läs alla instruktioner noggrant innan du använder den. VEVOR reserverar sig för en tydlig tolkning av vår användarmanual. Utseendet
på produkten är beroende av den produkt du fått. Ursäkta oss att vi inte kommer att informera dig igen om det finns någon teknik eller mjukvaruuppdateringar på vår produkt.
- 1 -
Machine Translated by Google
Dellista
- 2 -
Machine Translated by Google
Installationsprocedur
Steg 01: Montera sidopaneler, samma på båda sidor.
Steg 02: Fäst sidopanelerna med skruvar.
- 3 -
Machine Translated by Google
Steg 03: Installera basen. Obs: "H" tryckt med framsidan uppåt.
Steg 04: Installera vevstaken enligt bilden. - 4 -
Machine Translated by Google
Steg 05: Installera det första steget och pedalen i tur och ordning som visas i figuren. Andra steg måste installeras efter sandfyllning.
Steg 06: Installera ledstången enligt bilden. - 5 -
Machine Translated by Google
Steg 07: Efter att ha installerat ledstången, fyll på totalt 20 kg ren sand enligt figuren. Gör poolen sjunka bättre.
Steg 08: Installera den återstående stigaren och pedalerna som visas i steg 05. - 6 -
Machine Translated by Google
Steg 09: Skjut in fästplattan i det bakre armstödets ståndrör.
Steg 10: Montera den övre ledstången enligt bilden.
- 7 -
Machine Translated by Google
Steg 11: Placera stegen i poolen och se till att baksidan av poolen stegen är bredvid poolväggen. Fäst slutligen stegen i marken med skruvar.
- 8 -
Machine Translated by Google
Tillverkare: Shanghaimuxinmuyeyouxiangongsi Adress: Shuangchenglu 803nong11hao1602A-1609shi, baoshanqu, shanghai 200000 CN. Importerad till AUS: SIHAO PTY LTD. 1 ROKEVA STREETEASTWOOD NSW 2122 Australien
Importerad till USA: Sanven Technology Ltd. Suite 250, 9166 Anaheim Place, Rancho Cucamonga, CA 91730
UK REP
YH CONSULTING LIMITED. C/O YH Consulting Limited Office 147, Centurion House, London Road, Staines-upon-Thames, Surrey, TW18 4AX
EC REP
E-CrossStu GmbH Mainzer Landstr.69, 60329 Frankfurt am Main.
- 9 -
Machine Translated by Google
Teknisk support och e-garanticertifikat www.vevor.com/support