
HP ENVY Notebook PC 17 Product End-of-Life Disassembly instructions
standards, Annex II, Directive 2002/96/EC, disassemble, disassembly, disposal, dispose, electrical, electronic, end-of-life, equipment, EU WEEE, instructions, recycle, recycler, selective, treatment, waste, WEEE, e-waste, ewaste, product
HP
disassembly notebo 201651219522 Product End-of-Life Disassembly Instructions
Product Category: Personal Computers
Marketing Name / Model [List multiple models if applicable.] HP ENVY Notebook PC 17
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description
Notes
Quantity of items included
in product
Printed Circuit Boards (PCB) or Printed Circuit
With a surface greater than 10 sq cm
1
Assemblies (PCA)
Batteries
All types including standard alkaline and lithium coin 2 or button style batteries
Mercury-containing components
For example, mercury in lamps, display backlights, 0 scanner lamps, switches, batteries
Liquid Crystal Displays (LCD) with a surface greater Includes background illuminated displays with gas 0
than 100 sq cm
discharge lamps
Cathode Ray Tubes (CRT)
0
Capacitors / condensers (Containing PCB/PCT)
0
Electrolytic Capacitors / Condensers measuring
0
greater than 2.5 cm in diameter or height
External electrical cables and cords
0
Gas Discharge Lamps
0
Plastics containing Brominated Flame Retardants
0
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink,
Include the cartridges, print heads, tubes, vent
0
including liquids, semi-liquids (gel/paste) and toner chambers, and service stations.
Components and waste containing asbestos
0
Components, parts and materials containing
0
refractory ceramic fibers
EL-MF877-00 Template Revision B
Page 1
PSG instructions for this template are available at EL-MF877-01
Components, parts and materials containing
0
radioactive substances
2.0 Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.
Tool Description
Tool Size (if applicable)
Electric cross screwdriver
D73 1 * 3.0 * 20 * 40
Electric cross screwdriver
TORX T8 (2.31mm)
3.0 Product Disassembly Process 3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first 3. Use correct screwdriver and torque value before unlock the screw. 4. Disconnect RTC battery cable and remove battery from M/B. 5. Dispose of all removed components according to regulation requirements. 6. 7. 8. 9.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).
EL-MF877-00 Template Revision B
PSG instructions for this template are available at EL-MF877-01
Page 2
MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Sage
Sub-assembly name: Cleanroom DIS ASS`Y
Document No.:
Sage Cleanroom DIS ASS'Y SOP
Written by:
Vick Weng
Revision:
0.1
Date:
2016/03/16
Page:
1
A. Current station version list
Station Ver. Station Ver. Station Ver.
Station
Ver.
1
0.1
2
0.1
3
0.1
4
0.1
5
0.1
6
0.1
7
0.1
8
0.1
B. Version Modify list
Revision
Date
Station
Content
0.1
2016/03/16
ALL
FIRST VERSION
Ver.
Design
0.1
Vick Weng
Auditor Vick Weng Tabulator Alicia Chien
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Disassemble Bezel
Station : 1(1/1) Ver. : 0.1 Date : 2016/03/16
Step
1
1. Disassemble bezel by tool.
2 3
Fig.1
Fig.2
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Station : 2(1/1)
Name
: Disassemble LVDS Cable & Touch/B Ver. : 0.1 Date : 2016/03/16
Step
1. Disassemble LVDS cable (6017B0739901/ 6017B0739902) and touch/B.
Fig.1
Fig.2
Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Disassemble LCD
Station : 3(1/1) Ver. : 0.1 Date : 2016/03/16
Step
4
1 1. Loosen screw (6052A0034801) * 4. (Fig.1)
2. Remove sponge * 4. (Fig.2)
3
2
Fig.1
4
2
3
1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Rip Gaskets & Loosen Screws
Station : 4(1/1) Ver. : 0.1 Date : 2016/03/16
Step
1. Rip the gasket (6054A0022301) * 2. (Fig.1)
2. Loosen screw (6052B0120001) * 2. (Fig.2)
Fig.1
1
2
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Disassemble Hinges
Station : 5(1/1) Ver. : 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0131901) * 6. (Fig.2)
2. Disassemble hinges. (Fig.1)
4 65
Fig.1
1 3
2
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Disassemble Camera Cable
Station : 6(1/1) Ver. : 0.1 Date : 2016/03/16
Step
1. Disassemble camera cable. (Fig.1)
2. Disassemble camera module& MIC. (Fig.2 / Fig.3 / Fig.4)
Fig.1
Fig.3 Fig.4
Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Disassemble Antenna Cable
Station : 7(1/1) Ver. : 0.1 Date : 2016/03/16
Step
1. Disassemble antenna cable.
Fig.1
Fig.3
Fig.4
Fig.3
Fig.5
Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage Cleanroom DIS ASS'Y SOP
Name
: Package (Cover)
Ver. : 0.1
Step
1. Inspect cover .
Station : 8(1/1) Date : 2016/03/16
2. Put the cover into box.
Fig.1
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY
MODEL : Sage
Sub-assembly name: Document No.: Written by: Date:
FA DIS ASS`Y Sage FA DIS ASS'Y SOP Vick Weng 2016/03/16
Revision:
0.1
Page:
1
A. Current station version list
Station Ver. Station Ver. Station Ver.
1
0.1
10
0.1
19
0.1
2
0.1
11
0.1
20
0.1
3
0.1
12
0.1
21
0.1
4
0.1
13
0.1
22
0.1
5
0.1
14
0.1
23
0.1
6
0.1
15
0.1
24
0.1
7
0.1
16
0.1
25
0.1
8
0.1
17
0.1
26
0.1
9
0.1
18
0.1
27
0.1
B. Version Modify list
Revision
Date
Station
Content
0.1
2016/03/16
ALL
FIRST VERSION
Station
Ver.
28
0.1
Ver.
Design
0.1
Vick Weng
Auditor Vick Weng Tabulator Alicia Chien
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Remove Rubber
Ver. :
Station : 1(1/1) 0.1 Date : 2016/03/16
Step
1. Remove the rubber (6054B1752901). (Fig.1)
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Loosen D Case Screws
Ver. :
Station : 2(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0352701) * 4. (Fig.1)
4
3
2
1
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric screwdriver (T5)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Loosen D Case Screws
Step
Ver. :
Station : 3(1/1) 0.1 Date : 2016/03/16
1. Loosen screw (6052B0352601) * 4. (Fig.1)
3 1
2 4
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric screwdriver (T5)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Loosen D Case Screws
Ver. :
Station : 4(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0352701) * 3. (Fig.1)
3
2
1
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble D Case
Ver. :
Station : 5(1/1) 0.1 Date : 2016/03/16
Step
1. Disassemble D case. (Fig.1/Fig.2)
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble Battery
Ver. :
Station : 6(1/1) 0.1 Date : 2016/03/16
Step
1. Disconnect battery cable. (Fig.1)
2. Loosen screw (6052B0127601) * 4. (Fig.2)
3. Disassemble battery.
Fig.1
4
1
3 2 Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble ODD
1
4
Ver. :
Station : 7(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen ODD screw (6052B0127601) * 4, disassemble the ODD. (Fig.1)
2. Disassemble ODD bezel (6070B1018501). (Fig.2)
2
3
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble ODD Bracket
Ver. :
Station : 8(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0360201) * 2, disassemble ODD bracket L (6053B1281001). (Fig.1)
2. Loosen screw (6052B0360201) * 2, disassemble ODD bracket R (6053B1281101). (Fig.2)
1 2
Fig.1
2
1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Electric cross screwdriver (#1) ODD Support Fixture
Qty Holding fixture list (holding fixture standard) Qty 1 1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble DDR & LVDS Cable
Ver. :
Station : 9(1/1) 0.1 Date : 2016/03/16
Step
1. Disassemble DDR. (Fig.1)
2. Rip acid tape (6054A0076201), disconnect webcam & LVDS cable from M/B CNTR. (Fig.2)
Fig.1
Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble Antenna Cable
Ver. :
Station : 10(1/1) 0.1 Date : 2016/03/16
Step
1. Disassemble antenna cable. (Fig.1)
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble WLAN Card
Step
Ver. :
Station : 11(1/1) 0.1 Date : 2016/03/16
1. Loosen screw (6052B0127601) * 1, disassemble WLAN module. (Fig.1)
2. Rip the sponge that is on USB/B (6054B1784601). (Fig.2)
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble HOOK, Touch pad FFC Ver. :
Station : 12(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0127601) * 2, disassemble HOOK L (6051B1072901) & HOOK R (6051B1072601). (Fig.1)
1
2 2. Disconnect touch pad FFC from M/B CNTR.
(Fig.1)
3. Rip the gasket (6054B0365701) that is on
Fig.1
HDMI CNTR. (Fig.2)
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble I/O Bracket, K/B FFC
Ver. :
Station : 13(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0127601) * 2, disassemble I/O Bracket L. (Fig.1)
2. Rip the gasket (6054064A0207). (Fig.2)
3. Disconnect K/B membrane from M/B CNTR. (Fig.3)
2
1 Fig.2
Fig.1
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble I/O Bracket, K/B backlight FFC Ver. :
Station : 14(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0127601) * 3, disassemble I/O Bracket - R (6053B1278601) (Fig.2)
3 2. Rip the gasket (6054064A0207). (Fig.1)
3. Disconnect K/B backlight FFC from M/B CNTR. (Fig.3)
1
2 Fig.1
Fig.2
Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble DC-IN Cable
Ver. :
Station : 15(1/1) 0.1 Date : 2016/03/16
Step
1. Rip acid tape (6054A0076201).
2. Disconnect DC-IN cable from M/B CNTR, take out the DC-IN cable. (Fig.1 / Fig.2)
Fig.1
Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble USB/B Cable & SSD
Step
Ver. :
Station : 16(1/1) 0.1 Date : 2016/03/16
1. Disassemble USB/B cable from M/B CNTR. (Fig.1)
For W/ SSD 2. Loosen screw (6052B0127601) * 1,
disassemble SSD. (Fig.2)
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble HDD
Ver. :
Station : 17(1/1) 0.1 Date : 2016/03/16
Step
1. Disassemble USB/B FFC from M/B CNTR. (Fig.1)
For W/ HDD 2. Disassemble HDD cable from M/B CNTR.
(Fig.2) 3. Disassemble HDD from TPCB. (Fig.2) 4. Disassemble HDD FFC (6017B0739801)
from HDD. (Fig.3) 5. Disassemble HDD ear (6051B1077101) cover.
Fig.1
Fig.2
Fig.3
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Loosen Hinge Screws
Ver. :
Station : 18(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052A0034701) * 13.
6
2
1
4
3
5
6 1
2 7
3
4
5
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble USB/B
2 1
Ver. :
Station : 19(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052A0035101) * 3, disassemble USB/B (1310A2839001). (Fig.1)
2. Disassemble speaker cable from M/B CNTR. (Fig.2)
3 Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
:Disassemble M/B
Step
Ver. :
Station : 20(1/2) 0.1 Date : 2016/03/16
1. Disassemble FAN cable from M/B CNTR. (Fig.1)
2. Loosen screw (6052B0127601) * 2. (Fig.2)
Fig.1
2 1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
:Disassemble M/B
Ver. :
Station : 20(2/2) 0.1 Date : 2016/03/16
Step
1 2
1. Loosen screw (6052A0035101) * 3. (Fig.1) 2. Disassemble M/B. 3. Rip the rubber. (Fig.2)
3 Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
:Disassemble Thermal Module
Ver. :
Station : 21(1/1) 0.1 Date : 2016/03/16
Step
1. Put M/B on support fixture, B side upward. (Fig.1)
2. Loosen thermal module (6043B0203801 / 6043B0203811) set screw * 8, disassemble thermal module. (Fig.1)
68 75
42
1
3
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Electric cross screwdriver (#1) Thermal module support fixture
Qty Holding fixture list (holding fixture standard) Qty 1 1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble Speaker
Ver. :
Station : 22(1/1) 0.1 Date : 2016/03/16
Step
1. Disassemble speaker. (Fig.1)
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Rip Gaskets
Ver. :
Station : 23(1/1) 0.1 Date : 2016/03/16
Step
1. Rip KB BRKT mylar (6054B1751801). (Fig.1)
2. Rip all gasket (6054A0022301) * 12.
Fig.1
Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble T/P FFC & Rip Gaskets Ver. :
Station : 24(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052A0034701) * 1. (Fig.1)
2. Disassemble T/P FFC (6035B0153401) from T/P CNTR. (Fig.2)
Fig.1 3. Rip the gasket (6054B0572101) * 2. (Fig.3)
4. Rip the gasket (6054A0069701) * 2. (Fig.4)
Fig.2
Fig.3
Fig.4
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble T/P Bracket
Ver. :
Station : 25(1/1) 0.1 Date : 2016/03/16
Step
1. Loosen screw (6052B0120001) * 4,
disassemble T/P bracket (6053B1281301).
(Fig.1)
1 34
2 Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble T/P Holder Bracket
Ver. :
Station : 26(1/1) 0.1 Date : 2016/03/16
2
Step
1
3
1. Rip the T/P rubber (6054B1753901). (Fig.2)
2. Loosen screw (6052B0131701) * 3,
disassemble T/P holder bracket. (Fig.2)
Rubber
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Electric cross screwdriver (#1)
1
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble Bracket
Ver. :
Station : 27(1/1) 0.1 Date : 2016/03/16
Step
1. Disassemble KB BRKT-L (6053B1287201). (Fig.1)
2. Disassemble KB BRKT (6053B1287101). (Fig.2)
Fig.2
Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Standard Operation Procedure
Document No. Sage FA DIS ASS'Y SOP
Name
: Disassemble Keyboard
Step
Ver. :
Station : 28(1/1) 0.1 Date : 2016/03/16
1. Disassemble keyboard backlight board from keyboard.
2. Disassemble keyboard.
Fig.1
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator Alicia Chien
Auditor Vick Weng
Issue department NPSU-PPE
Adobe PDF Library 11.0