HP ENVY Notebook PC 17 Product End-of-Life Disassembly instructions

standards, Annex II, Directive 2002/96/EC, disassemble, disassembly, disposal, dispose, electrical, electronic, end-of-life, equipment, EU WEEE, instructions, recycle, recycler, selective, treatment, waste, WEEE, e-waste, ewaste, product

HP

PDF preview unavailable. Download the PDF instead.

disassembly notebo 201651219522
Product End-of-Life Disassembly Instructions
Product Category: Personal Computers
Marketing Name / Model [List multiple models if applicable.] HP ENVY Notebook PC 17

Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).

1.0 Items Requiring Selective Treatment

1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.

Item Description

Notes

Quantity of items included

in product

Printed Circuit Boards (PCB) or Printed Circuit

With a surface greater than 10 sq cm

1

Assemblies (PCA)

Batteries

All types including standard alkaline and lithium coin 2 or button style batteries

Mercury-containing components

For example, mercury in lamps, display backlights, 0 scanner lamps, switches, batteries

Liquid Crystal Displays (LCD) with a surface greater Includes background illuminated displays with gas 0

than 100 sq cm

discharge lamps

Cathode Ray Tubes (CRT)

0

Capacitors / condensers (Containing PCB/PCT)

0

Electrolytic Capacitors / Condensers measuring

0

greater than 2.5 cm in diameter or height

External electrical cables and cords

0

Gas Discharge Lamps

0

Plastics containing Brominated Flame Retardants

0

weighing > 25 grams (not including PCBs or PCAs

already listed as a separate item above)

Components and parts containing toner and ink,

Include the cartridges, print heads, tubes, vent

0

including liquids, semi-liquids (gel/paste) and toner chambers, and service stations.

Components and waste containing asbestos

0

Components, parts and materials containing

0

refractory ceramic fibers

EL-MF877-00 Template Revision B

Page 1

PSG instructions for this template are available at EL-MF877-01

Components, parts and materials containing

0

radioactive substances

2.0 Tools Required

List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.

Tool Description

Tool Size (if applicable)

Electric cross screwdriver

D73 1 * 3.0 * 20 * 40

Electric cross screwdriver

TORX T8 (2.31mm)

3.0 Product Disassembly Process 3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first 3. Use correct screwdriver and torque value before unlock the screw. 4. Disconnect RTC battery cable and remove battery from M/B. 5. Dispose of all removed components according to regulation requirements. 6. 7. 8. 9.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).

EL-MF877-00 Template Revision B

PSG instructions for this template are available at EL-MF877-01

Page 2

MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Sage

Sub-assembly name: Cleanroom DIS ASS`Y

Document No.:

Sage Cleanroom DIS ASS'Y SOP

Written by:

Vick Weng

Revision:

0.1

Date:

2016/03/16

Page:

1

A. Current station version list

Station Ver. Station Ver. Station Ver.

Station

Ver.

1

0.1

2

0.1

3

0.1

4

0.1

5

0.1

6

0.1

7

0.1

8

0.1

B. Version Modify list

Revision

Date

Station

Content

0.1

2016/03/16

ALL

FIRST VERSION

Ver.

Design

0.1

Vick Weng

Auditor  Vick Weng Tabulator Alicia Chien

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Disassemble Bezel

Station : 1(1/1) Ver. : 0.1 Date : 2016/03/16

Step

1

1. Disassemble bezel by tool.

2 3

Fig.1

Fig.2

Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Station : 2(1/1)

Name

: Disassemble LVDS Cable & Touch/B Ver. : 0.1 Date : 2016/03/16

Step

1. Disassemble LVDS cable (6017B0739901/ 6017B0739902) and touch/B.

Fig.1

Fig.2

Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Disassemble LCD

Station : 3(1/1) Ver. : 0.1 Date : 2016/03/16

Step

4

1 1. Loosen screw (6052A0034801) * 4. (Fig.1)

2. Remove sponge * 4. (Fig.2)

3

2

Fig.1

4

2

3

1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Rip Gaskets & Loosen Screws

Station : 4(1/1) Ver. : 0.1 Date : 2016/03/16

Step
1. Rip the gasket (6054A0022301) * 2. (Fig.1)

2. Loosen screw (6052B0120001) * 2. (Fig.2)

Fig.1

1

2

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Disassemble Hinges

Station : 5(1/1) Ver. : 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0131901) * 6. (Fig.2)

2. Disassemble hinges. (Fig.1)

4 65

Fig.1
1 3
2
Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Disassemble Camera Cable

Station : 6(1/1) Ver. : 0.1 Date : 2016/03/16

Step
1. Disassemble camera cable. (Fig.1)

2. Disassemble camera module& MIC. (Fig.2 / Fig.3 / Fig.4)

Fig.1

Fig.3 Fig.4

Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Disassemble Antenna Cable

Station : 7(1/1) Ver. : 0.1 Date : 2016/03/16

Step

1. Disassemble antenna cable.

Fig.1

Fig.3

Fig.4

Fig.3

Fig.5

Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage Cleanroom DIS ASS'Y SOP

Name

: Package (Cover)

Ver. : 0.1

Step

1. Inspect cover .

Station : 8(1/1) Date : 2016/03/16

2. Put the cover into box.



Fig.1

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY
MODEL : Sage

Sub-assembly name: Document No.: Written by: Date:

FA DIS ASS`Y Sage FA DIS ASS'Y SOP Vick Weng 2016/03/16

Revision:

0.1

Page:

1

A. Current station version list

Station Ver. Station Ver. Station Ver.

1

0.1

10

0.1

19

0.1

2

0.1

11

0.1

20

0.1

3

0.1

12

0.1

21

0.1

4

0.1

13

0.1

22

0.1

5

0.1

14

0.1

23

0.1

6

0.1

15

0.1

24

0.1

7

0.1

16

0.1

25

0.1

8

0.1

17

0.1

26

0.1

9

0.1

18

0.1

27

0.1

B. Version Modify list

Revision

Date

Station

Content

0.1

2016/03/16

ALL

FIRST VERSION

Station

Ver.

28

0.1

Ver.

Design

0.1

Vick Weng

Auditor  Vick Weng Tabulator Alicia Chien

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Remove Rubber

Ver. :

Station : 1(1/1) 0.1 Date : 2016/03/16

Step

1. Remove the rubber (6054B1752901). (Fig.1)

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Loosen D Case Screws

Ver. :

Station : 2(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0352701) * 4. (Fig.1)

4

3

2

1

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric screwdriver (T5)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Loosen D Case Screws

Step

Ver. :

Station : 3(1/1) 0.1 Date : 2016/03/16

1. Loosen screw (6052B0352601) * 4. (Fig.1)

3 1
2 4

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric screwdriver (T5)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Loosen D Case Screws

Ver. :

Station : 4(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0352701) * 3. (Fig.1)

3

2

1

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble D Case

Ver. :

Station : 5(1/1) 0.1 Date : 2016/03/16

Step

1. Disassemble D case. (Fig.1/Fig.2)

Fig.1

Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble Battery

Ver. :

Station : 6(1/1) 0.1 Date : 2016/03/16

Step

1. Disconnect battery cable. (Fig.1)

2. Loosen screw (6052B0127601) * 4. (Fig.2)

3. Disassemble battery.

Fig.1

4

1

3 2 Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble ODD

1

4

Ver. :

Station : 7(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen ODD screw (6052B0127601) * 4, disassemble the ODD. (Fig.1)

2. Disassemble ODD bezel (6070B1018501). (Fig.2)

2

3

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble ODD Bracket

Ver. :

Station : 8(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0360201) * 2, disassemble ODD bracket ­ L (6053B1281001). (Fig.1)

2. Loosen screw (6052B0360201) * 2, disassemble ODD bracket ­ R (6053B1281101). (Fig.2)

1 2

Fig.1

2

1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Electric cross screwdriver (#1) ODD Support Fixture

Qty Holding fixture list (holding fixture standard) Qty 1 1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble DDR & LVDS Cable

Ver. :

Station : 9(1/1) 0.1 Date : 2016/03/16

Step

1. Disassemble DDR. (Fig.1)

2. Rip acid tape (6054A0076201), disconnect webcam & LVDS cable from M/B CNTR. (Fig.2)

Fig.1

Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble Antenna Cable

Ver. :

Station : 10(1/1) 0.1 Date : 2016/03/16

Step

1. Disassemble antenna cable. (Fig.1)

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble WLAN Card

Step

Ver. :

Station : 11(1/1) 0.1 Date : 2016/03/16

1. Loosen screw (6052B0127601) * 1, disassemble WLAN module. (Fig.1)

2. Rip the sponge that is on USB/B (6054B1784601). (Fig.2)

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble HOOK, Touch pad FFC Ver. :

Station : 12(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0127601) * 2, disassemble HOOK ­ L (6051B1072901) & HOOK ­ R (6051B1072601). (Fig.1)

1

2 2. Disconnect touch pad FFC from M/B CNTR.

(Fig.1)

3. Rip the gasket (6054B0365701) that is on

Fig.1

HDMI CNTR. (Fig.2)

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble I/O Bracket, K/B FFC

Ver. :

Station : 13(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0127601) * 2, disassemble I/O Bracket ­ L. (Fig.1)

2. Rip the gasket (6054064A0207). (Fig.2)

3. Disconnect K/B membrane from M/B CNTR. (Fig.3)

2

1 Fig.2

Fig.1

Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble I/O Bracket, K/B backlight FFC Ver. :

Station : 14(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0127601) * 3, disassemble I/O Bracket - R (6053B1278601) (Fig.2)
3 2. Rip the gasket (6054064A0207). (Fig.1)

3. Disconnect K/B backlight FFC from M/B CNTR. (Fig.3)

1

2 Fig.1

Fig.2

Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble DC-IN Cable

Ver. :

Station : 15(1/1) 0.1 Date : 2016/03/16

Step

1. Rip acid tape (6054A0076201).

2. Disconnect DC-IN cable from M/B CNTR, take out the DC-IN cable. (Fig.1 / Fig.2)

Fig.1

Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble USB/B Cable & SSD

Step

Ver. :

Station : 16(1/1) 0.1 Date : 2016/03/16

1. Disassemble USB/B cable from M/B CNTR. (Fig.1)

For W/ SSD 2. Loosen screw (6052B0127601) * 1,
disassemble SSD. (Fig.2)

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble HDD

Ver. :

Station : 17(1/1) 0.1 Date : 2016/03/16

Step
1. Disassemble USB/B FFC from M/B CNTR. (Fig.1)

For W/ HDD 2. Disassemble HDD cable from M/B CNTR.
(Fig.2) 3. Disassemble HDD from TPCB. (Fig.2) 4. Disassemble HDD FFC (6017B0739801)
from HDD. (Fig.3) 5. Disassemble HDD ear (6051B1077101) cover.

Fig.1

Fig.2

Fig.3

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Loosen Hinge Screws

Ver. :

Station : 18(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052A0034701) * 13.

6

2

1

4

3

5

6 1
2 7

3

4

5

Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble USB/B

2 1

Ver. :

Station : 19(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052A0035101) * 3, disassemble USB/B (1310A2839001). (Fig.1)

2. Disassemble speaker cable from M/B CNTR. (Fig.2)

3 Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

:Disassemble M/B

Step

Ver. :

Station : 20(1/2) 0.1 Date : 2016/03/16

1. Disassemble FAN cable from M/B CNTR. (Fig.1)

2. Loosen screw (6052B0127601) * 2. (Fig.2)

Fig.1
2 1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

:Disassemble M/B

Ver. :

Station : 20(2/2) 0.1 Date : 2016/03/16

Step

1 2

1. Loosen screw (6052A0035101) * 3. (Fig.1) 2. Disassemble M/B. 3. Rip the rubber. (Fig.2)

3 Fig.1

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

:Disassemble Thermal Module

Ver. :

Station : 21(1/1) 0.1 Date : 2016/03/16

Step

1. Put M/B on support fixture, B side upward. (Fig.1)

2. Loosen thermal module (6043B0203801 / 6043B0203811) set screw * 8, disassemble thermal module. (Fig.1)

68 75
42

1

3

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard)
Electric cross screwdriver (#1) Thermal module support fixture

Qty Holding fixture list (holding fixture standard) Qty 1 1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble Speaker

Ver. :

Station : 22(1/1) 0.1 Date : 2016/03/16

Step

1. Disassemble speaker. (Fig.1)

Fig.2

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Rip Gaskets

Ver. :

Station : 23(1/1) 0.1 Date : 2016/03/16

Step

1. Rip KB BRKT mylar (6054B1751801). (Fig.1)

2. Rip all gasket (6054A0022301) * 12.

Fig.1

Fig.2
Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble T/P FFC & Rip Gaskets Ver. :

Station : 24(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052A0034701) * 1. (Fig.1)

2. Disassemble T/P FFC (6035B0153401) from T/P CNTR. (Fig.2)
Fig.1 3. Rip the gasket (6054B0572101) * 2. (Fig.3)

4. Rip the gasket (6054A0069701) * 2. (Fig.4)

Fig.2

Fig.3

Fig.4

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble T/P Bracket

Ver. :

Station : 25(1/1) 0.1 Date : 2016/03/16

Step

1. Loosen screw (6052B0120001) * 4,

disassemble T/P bracket (6053B1281301).

(Fig.1)

1 34

2 Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble T/P Holder Bracket

Ver. :

Station : 26(1/1) 0.1 Date : 2016/03/16

2

Step

1

3

1. Rip the T/P rubber (6054B1753901). (Fig.2)

2. Loosen screw (6052B0131701) * 3,

disassemble T/P holder bracket. (Fig.2)

Rubber

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once.

Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Electric cross screwdriver (#1)

1

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble Bracket

Ver. :

Station : 27(1/1) 0.1 Date : 2016/03/16

Step

1. Disassemble KB BRKT-L (6053B1287201). (Fig.1)

2. Disassemble KB BRKT (6053B1287101). (Fig.2)

Fig.2
Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE

Standard Operation Procedure

Document No. Sage FA DIS ASS'Y SOP

Name

: Disassemble Keyboard

Step

Ver. :

Station : 28(1/1) 0.1 Date : 2016/03/16

1. Disassemble keyboard backlight board from keyboard.

2. Disassemble keyboard.

Fig.1

Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty

Tabulator Alicia Chien

Auditor  Vick Weng

Issue department NPSU-PPE


Adobe PDF Library 11.0