Soho Radiator Installation Manual
This document provides instructions for installing Soho radiators, covering both electric and hydraulic operation models.
Electric Operation - Vertical Wall Mount
Version: VERTICAL WALL MOUNT Additional screws and fasteners are also shown. Presentation of the Soho radiator structure. Shows a wall with an electrical outlet, indicating the installation area. Depicts using a [power drill] to create holes in the wall. It shows screws and wall plugs being inserted into the wall for bracket mounting. Illustrates securing the wall mounting brackets (02) to the wall using screws and wall plugs. Shows the radiator unit being connected to the wall-mounted brackets. Displays the final dimensions for two Soho models: Soho 140 cm (Height = 121.0 cm) and Soho 180 cm (Height = 161.0 cm). Similar to Step 3, shows drilling holes in the wall with a [power drill]. Shows fixing the wall mounting brackets (02) to the wall using screws. Illustrates attaching screws (03, 04) and plates (05) to the radiator structure. Shows securing various components with screws (08, 07). Depicts attaching fasteners/clips (06) to the radiator structure. Shows the electrical connection process. Wires labeled N (Neutral) and F (Phase) are shown connecting to the SOHO unit. It indicates "NON FORNITI" ([not supplied]) for certain electrical components. A detailed wiring diagram shows the connections for N, F, and a ground symbol. Shows attaching a component (03) to the radiator structure. Illustrates securing parts with screws (02, 06). Shows the final assembly of the radiator tubes. Shows the final mounting of the radiator for both Soho 140 cm and Soho 180 cm models, using screws (07, 08). Depicts attaching the central mounting bracket (09). Shows the final assembled radiator structure.Parts Included (Electric Model)
Installation Steps
Step 1: Radiator Unit Overview
Step 2: Wall Preparation
Step 3: Drilling Mounting Holes
Step 4: Fixing Wall Brackets
Step 5: Attaching Radiator to Brackets
Step 6: Final Dimensions
Step 7: Drilling Mounting Holes (Repeat)
Step 8: Fixing Wall Brackets (Repeat)
Step 9: Attaching Components to Radiator
Step 10: Securing Components
Step 11: Attaching Fasteners
Step 12: Electrical Connection
Step 13: Attaching Component
Step 14: Securing Parts
Step 15: Final Assembly of Radiator Tubes
Step 16: Final Radiator Mounting
Step 17: Attaching Central Bracket
Step 18: Final Assembled View
Hydraulic Operation - Horizontal Wall Mount
Version: HORIZONTAL WALL MOUNT Fig. 1.1: Mark the radiator installation point on the wall. Mark the fixing holes for the brackets (02), considering the radiator length and the inter-axis dimension 'A' specified in Table 1. Fig. 1.2: Attach the support screws (04) with mounting plates (05) to the radiator, ensuring the correct dimension 'A' is maintained. All dimensions are expressed in mm. Fig. 2.1: Fix the brackets (02) to the wall using appropriate screws and wall plugs. Note: "Fissaggi non forniti" ([Fixing screws not supplied]). Fig. 3.1 & 3.2: Position the Soho radiator by inserting the screws (04) into the slots of the brackets (02). Follow the movement indicated by the arrows. Fig. 4.1 & 4.2: Connect the system to the radiator's connection points (07). Follow the diagram for the remote valve group. This shows the connection of the Soho unit to the remote valve group, indicating "IN" and "OUT" ports, a "Valvola" (Valve), and a "Detentore" (Lockshield valve). It also illustrates the connection from the wall to the valve group. Fig. 5.1: Complete the installation by securing the radiator using screws (03) and washers (03a) to the mounting plates (06).Installation Kit Contents
Installation Phases
Phase 1: Positioning and Initial Attachment
Table 1: Inter-axis Dimensions
L (Radiator Length) [mm] 600 800 1000 1400 1600 1800 2000 2200 2400 2800 A (max inter-axis) [mm] 460 660 860 1260 1460 1660 1860 2060 2260 2660 Phase 2: Fixing Brackets to Wall
Phase 3: Positioning Radiator on Brackets
Phase 4: Connecting to Hydraulic System
Phase 5: Final Securing