User Manual for APsystems models including: ECU-B, Energy Communication Unit

TABLE OF CONTENTS

TABLE OF CONTENTS

APsystemsECU-BInstallation/UserManual 2 TableofContents 1.Introduction.....3

PDF Table of contents

4. ECU-B User Interface. 4.1 Connecting to the ECU-B via the Local Wireless. 4.2 Enter microinverters UID (serial numbers) into. 4.4 Delete UID. 4.5 Grid Profile. 4.6 Time management. 4.7 ECU Network...

APsystems Energy Communication Unit ECU-B - Paneles ...

The wireless password will be changed to “88888888”. Interface Explanat. 2.3 Power Connection Port. The power connection port connects power through the power ...


File Info : application/pdf, 23 Pages, 2.54MB

PDF preview unavailable. Download the PDF instead.

APS-ECU-B ManualUsuario
Installation / User Manual APsystems Energy Communication Unit ECU-B

Please scan this QR code to download our APPs or click the link below: http://q-r.to/1OrC

© All Rights Reserved

Table of Contents
1. Introduction........................................................................................................................................ 3 2. Interface Explanation..................................................................................................................... 4
2.1 Interface Layout................................................................................................... 4 2.2 Reset....................................................................................................................... 5 2.3 Power Connection Port.................................................................................... 5 2.4 Antenna................................................................................................................. 5 2.5 USB port................................................................................................................ 5 2.6 AP............................................................................................................................ 5 2.7 LED1.........................................................................................................................6 2.8 LED2........................................................................................................................6 3. Hardware Installation..................................................................................................................... 7 3.1 Preparation.............................................................................................................7 3.2 Selecting an Installation Location for the ECU-B....................................7 3.3 Installation.............................................................................................................7 3.4 Cable Connection...............................................................................................8 3.5 Internet Connection...........................................................................................9 4. ECU-B User Interface....................................................................................................................10 4.1 Connecting to the ECU-B via the Local Wireless...................................10 4.2 Enter microinverters UID (serial numbers) into the ECU-B............... 11 4.3 Historical ID........................................................................................................ 12 4.4 Delete UID...........................................................................................................12 4.5 Grid Profile..........................................................................................................13 4.6 Time management........................................................................................... 14 4.7 ECU Network Settings....................................................................................14 4.8 Checking the commissioning of the ECU-B............................................16 4.9 Module................................................................................................................. 17 4.10 Data..................................................................................................................... 18 4.11 Inverter Connection Progress...................................................................... 18 4.12 Automatic System Check............................................................................. 19 4.13 ECU AP Settings..............................................................................................19 4.14 Do-It-Yourself Registration.......................................................................... 20 4.15 Settings...............................................................................................................20 5. Technical Data.................................................................................................................................21 6. Contact Information..................................................................................................................... 23

APsystems ECU-B Installation/User Manual

2

1. Introduction

The APsystems Energy Communication Unit (ECU-B) is the information gateway for our inverters.ECU-B has been specially developed to monitor small PV systems up to 4 PV modules.The unit collects module performance data from each individual inverter and transfers this information to an Internet database in real time, requiring only a single data and power cable. Through the APsystems Energy Monitoring and Analysis software, the ECU-B gives you precise analysis of each inverter and module in your solar installation from APP. The user-friendly interface lets you access your solar array in seconds.

Features  Collects individual PV module and microinverter statistics  Communicates in real time  Requires no additional wiring
The APsystems ECU-B is used in utility-interactive grid-tied applications, typically consisting of five key elements:
 APsystems microinverter(s)  APsystems Energy Communication Unit (ECU-B)  EMA Manager APP: for installer to set-up the ECU-B  EMA APP: to enable end-users to have access to the data and
performance of their system anytime, anywhere  APsystems Energy Monitoring and Analysis (EMA): web-based
monitoring and analysis system, for both end-users and installers

Inverter
PV Module

Inverter
PV Module

Junction Box

Meter Junction Box

Meter

AAppssyysstetemmssCCoommmmuunniciactaotror ((EECCUU-B-R) )

Apsystems Communicator (ECU-R)

Neutral Ground

Neutral Ground

ECU APP

InterneEtCU APP

EMA Internet

EMA
Figure 1

APsystems ECU-B Installation/User Manual

3

2. Interface Explanation

2.1 Interface Layout

The ECU-B interface includes, (figure 2) from left to right  Reset button  Wifi antenna connector (WLAN communication between ECU and
router)  power connection port  Zigbee antenna connector (communication between ECU and
microinverters)

Reset Antenna(WIFI)

Antenna(ZIGBEE)

Power Connection Port

Invalid Ports

On the side ECU: from top to bottom are:  USB port : the USB interface is reserved.  AP button: in case there is need to activate the ECU-B hotspot (see
later in the document)

USB AP

Figure 2

APsystems ECU-B Installation/User Manual

4

2. Interface Explanation
2.2 Reset
Press the Reset button for three seconds or longer, and the ECU-B will automatically return to the default settings.
The wireless password will be changed to "88888888".
Interface Explanat
2.3 Power Connection Port
The power connection port connects power through the power adapter.
2.4 Antenna
The antennas in the package should be connected to ECU-B. One antenna is used for the communication between ECU-B and inverters, the other antenna is used for the Wi-Fi connection between ECU-B and router.
2.5 USB port
The USB interface is reserved.
2.6 AP
The AP button enables to turn on the ECU wifi hotspot. When setting up the ECU, installer needs to first connect to the ECU hotspot via his smart phone or tablet. Press the AP button for a few seconds: the ECU hotspot will be live for one hour. If more time is needed to set-up the ECU, press the AP button to reactivate the hotspot.

APsystems ECU-B Installation/User Manual

5

2. Interface Explanation
LED1 LED2
Figure 3
2.7 LED1
LED1 will be ON (green light) when the ECU is powered ON.
2.8 LED2
LED2 will be ON (green light) when the ECU is exchanging data with the EMA server. When you haven't entered microinverters UID into the ECU-B, or The ECU cannot connect to the EMA server, LED2 is OFF.

APsystems ECU-B Installation/User Manual

6

3. Hardware Installation
3.1 Preparation
Make sure you have the following components ready before beginning to install the ECU-B:
 A dedicated standard AC electrical outlet (located as close as possible of the PV array to ensure good communication between ECU and microinverters).
 A wireless router.  A smartphone or tablet with EMA Manager APP ready to use (see
page 10).
3.2 Selecting an Installation Location for the ECU-B
 Choose a location that is as close as possible of the PV array.  The ECU-B is NOT rated for outdoor use. If installing outdoor,
ensure that the ECU-B is put in a waterproof box, and that the antenna (wifi and Zigee) are placed outside of the box to ensure optimum communication. In case you need to use extension antennas to be closer to the PV array, please make sure the extension antennas are Wifi 2.4GHz with SMA connectors male/female. These extension antennas are not supplied by APsystems, but can be purchased at any electrical/PV shop.
3.3 Installation
1) Using a Wall Mount When mounting the ECU-B to a wall, make sure to select a cool, dry indoor location.  Depending on the wall surface you are mounting the ECU-B to, use either two drywall screws or wall anchors, installed 100 mm apart (The drywall screws and wall anchors are not included in the ECU-B kit).  Align and slide the ECU-B onto the mounting screws.
Figure 4

APsystems ECU-B Installation/User Manual

7

3. Hardware Installation
2) if the ECU-B is not mounted on a wall mont, you can put it anywhere on a flat surface or furniture, close to a power outlet.
3.4 Cable Connection
1) Using a Wall Mount  Connect the adapter to the power connection port on the top of the ECU-B.
Figure 5
The antennas used for Zigbee port and WI-FI port are exactly the same type, no need to distinguish.

APsystems ECU-B Installation/User Manual

8

3. Hardware Instrallation
2Power Distribution Cabinet Installation  Install the socket on the guide rail (The socket will not be supplied by APsystems Please prepare it yourself).  Connect the adapter to the power connection port on the top of the ECU-B.

Figure 6
ECU antennas must be left outside of the cabinet, even if the cabinet is made of plastic. Please make sure the extension antennas are Wifi 2.4GHz with SMA connectors male/female. These extension antennas are not supplied by APsystems, but can be purchased at any electrical/PV shop.
3.5 Internet Connection

Figure 7
Use ECU-B internal WLAN (see Manage the WLAN connection ).

APsystems ECU-B Installation/User Manual

9

4. ECU-B User Interface
Please scan QR code below to have access to our products and APP catalogue, or click this link to download our APPs: http://q-r.to/1OrC.
 EMA Manager APP: for installers  Professional installers: all features available  DIY (Do It Yourself) installers: only ECU_APP features available
 EMA APP: for end-users only 4.1 Connecting to the ECU-B via the Local Wireless
 Make sure you have downloaded the EMA Manager APP on your smartphone or tablet
 Make sure the ECU-B hotspot is activated (if not, press the AP button for a few second)
 Open Settings > Wi-Fi in your smartphone or tablet  Select ECU-B hotspot: name is ECU_B_2163XXXX (mimicking
ECU-B serial number)  Connect your smartphone or tablet to the ECU-B hotspot. Default
password is "88888888" (8 times 8)  Once the connection is established with the ECU-B hotspot, open
the EMA Manager APP.
 Select "ECU APP" to enter into the commissioning tool (you can
access to ECU APP without any login or password).

APsystems ECU-B Installation/User Manual

10

4. ECU-B User Interface
4.2 Enter microinverters UID (serial numbers) into the ECU-B
 Click "Workspace", select "ID Management", input the microinverters UID (serial number: 12 digits starting with a 4, a 5, a 7 or a 8) manually or scan the UID with your smartphone or tablet scanner.
 Once the microinverters UID have been entered, please press "Sync"
Please do not enter the ECU UID into the ID management menu (serial number of 12 digits starting with 2163-).

APsystems ECU-B Installation/User Manual

11

4. ECU-B User Interface
4.3 Historical ID
 If the ECU accidentally emptied the inverter list, you can use the same mobile phone to quickly restore the inverter id list.
Eser Ierface
4.4 Delete UID
 In case of wrong entry or typo, select the microinverter UIDs, click "Delete" then click "Sync". The selected UID(s) will be removed from the ECU-B.
 Note: when deleting, please press also "Sync". Otherwise the microinverter will not be removed from the ECU-B.
Once the microinverters UID have been successfully entered into the ECU-B, you need to select grid profile and define time zone of your ECU.

APsystems ECU-B Installation/User Manual

12

4. ECU-B User Interface
4.5 Grid Profile
 From the work space, select "Grid profile"  First select country and then the city.

If you select the wrong grid profile, the microinverters may not start or may not produce as per optimal performance.

APsystems ECU-B Installation/User Manual

13

4. ECU-B User Interface
4.6 Time management
 From the workspace, please select menu "ECU Date Settings" manual set-up, click "Date", "Time" and "Timezone" to modify.
 Automated set-up: Click "Time quick setting": the APP will synchronise on the time and time zone as per smartphone or tablet settings.

4.7 ECU Network Settings
4.7.1 WLAN
 From the Workspace menu, select "ECU Network settings"  Swipe down the screen, the available SSIDs will be displayed  Select the network of your choice and enter its password  When connecting to the local Wifi, the smartphone or tablet may
lose its connection to the ECU hotspot and connect to other wifi network or 4G.
 If more operations are needed to finish-up the ECU commissioning,
please make sure to reconnect your smartphone or tablet to the ECU hotspot (may have to press the AP button to re-activate the hotspot)

APsystems ECU-B Installation/User Manual

14

4. ECU-B User Interface

 When your smartphone or tablet is connected to the ECU hotspot again, you can open the ECU APP home page and check the internet connection status.
 The first bullet (with ECU UID) when green shows that the smartphone/tablet is properly connected to the ECU hotspot.
 The 2nd bullet shall be green if the wifi connection has been successfully established.

APsystems ECU-B Installation/User Manual

15

4. ECU-B User Interface
4.8 Checking the commissioning of the ECU-B
 Once the ECU-B has been commissioned, installer can check status on the home page of the ECU APP:
 Several infos are displayed - Systems info (ECU UID, serial number) - number of microinverters communicating with the ECU / total number of microinverters entered in the ECU (with ID Management menu).

 Status of connectivity  The traffic light (on the left) in front of the ECU UID shows
connectivity status between smartphone or tablet and ECU hotspot:  Smartphone or tablet is connected to the ECU hotspot.  Smartphone or tablet is not connected to the ECU hotspot. Please try again by pressing the AP button.  The traffic light (on the right) shows connectivity status between the ECU and the local internet  The ECU is connected to the local internet.  The ECU is not connected to the internet.
Other info visible from the home page power output of the day -Total power output since installation -COReduction since installation.

APsystems ECU-B Installation/User Manual

16

4. ECU-B User Interface
4.9 Module
 This page displays the microinverters entered in the ECU (Menu ID Management) and properly registered by the ECU
A dual microinverter will be shown by default with 2 PV modules, while a quad microinverters will be shown by default with 4 PV modules. if some DC channels are not connected on purpose, the ECU_APP will display the maximum number of panels which can be connected to a given microinverter
 Removing un-used channel needs to be done from the EMA installer account when creating end-user account.
 On the module page, installer can visualize the performance of microinverters registered into the ECU.
Click "Panel": the detailed information of the microinverter is displayed, including inverter UID, PV module DC power, grid voltage, frequency and temperature.

APsystems ECU-B Installation/User Manual

17

4. ECU-B User Interface
4.10 Data
 In this Menu, you can view the detailed data at system level: -Per day -Per month
B ser Interface
4.11 Inverter Connection Progress
 This menu shows the connection progress and communication quality between microinverter and ECU, 100% means the connection is over.



The invereters with "OK" have connected ECU

APsystems ECU-B Installation/User Manual

18

4. ECU-B User Interface
4.12 Automatic System Check
 Once the ECU has been commissioned, the menu "Automatic System Check" can help you to check proper communication and production of each microinveters.
 This menu also gives some basic troubleshooting tips.
4.13 ECU AP Settings
 This menu can be used if you would like to change the default password of the ECU-B hotspot.
 Please connect to the ECU hostpot first, open the menu "ECU APP settings" and change the password at your convenience.
 If doing a reset of the ECU, password will be reinitialized as 88888888.

APsystems ECU-B Installation/User Manual

19

4. ECU-B User Interface
4.14 Do-It-Yourself Registration
 This menu is only for DIY installers: it will allow DIY installer to create their EMA account by themselves. They can later on access to their account via the EMA APP.
 Once the ECU has been properly commissioned, make sure to connect your smartphone or tablet to local internet.
 Enter "Do it Yourself Registration Menu" and follow instructions to create your own EMA account.
4. ECU-B User Interface
4.15 Settings
 This basic menu allows you to change the Language: 6 languages are available: English, French, Spanish, Portuguese, Simplified Chinese and traditional Chinese.

APsystems ECU-B Installation/User Manual

20

5. Technical Data

Communication Interface

Integrated Wi-Fi

802.11g/n

Communication

ZigBee 2.4 GHz

Wireless security

WEP,WPA2-PSK

USB Interface

5Vdc-0.5A Output

Power Requirements

AC Adapter

5V, 2A

Power Consumption

1.7W

Maximum Communicating PV Module 4
Qty

Mechanical Data

Dimensions (W×H×D)

122mm×87mm×25mm(4.8''×3.4''×0.98'')

Weight

150g (0.33lbs)

Ambient Temperature Range

-20°C to +65°C (-4 to +149)

Cooling

Nature Convection; No Fans

Enclosure Environmental Rating

Indoor - NEMA 1 (IP20)

Features

Compliance

IEC 60950-1, EN60950-1, IEC 60529, EN 60529, ANSI/UL 60950-1, CAN/CSA C22.2 No.60950-1, UL50E, FCC part 15, EN61000-6-1,

EN61000-6-3, ICES-003, AS NZS 60950-1, GB/T17799 Specifications subject to change without notice. Please ensure you are using the most recent update found at www.APsystems.com.

This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
This Class B digital apparatus complies with Canadian ICES-003.
2021/09/08 REV1.0

APsystems ECU-B Installation/User Manual

21

5. Technical Data

Disposal of your old appliance
1. When this crossed-out wheeled bin symbol is attached to a product, it means the product is covered by the European Directive 2002/96/EC.
2. All electrical and electronic products should be disposed of separately from the municipal waste stream via designated collection facilities appointed by the government or the local authorities.
3. The correct disposal of your old appliance will help prevent potential negative consequences for the environment and human health.
4. For more detailed information about disposal of your old appliance, please contact your city office, waste disposal service or the shop where you purchased the product.
CAUTION
The professional person is allowed to replace the battery. Do not ingest battery, Chemical Burn Hazard. This product contains a coin/button cell battery. If the coin/button cell battery is swallowed, it can cause severe internal burns in just 2 hours and can lead to death.Keep new and used batteries away from children.If you think batteries might have been swallowed or placed inside any part of the body, seek immediate medical attention.

APsystems ECU-B Installation/User Manual

22

6. Contact Information
ALTENERGY POWER SYSTEM Inc.
www.APsystems.com
APsystems Jiaxing China No. 1, Yatai Road, Nanhu District, Jiaxing, Zhejiang Tel: +86 573 8398 6967 Mail: info@altenergy-power.com
APsystems Shanghai China B305 No. 188, Zhangyang Road, Pudong, Shanghai Tel: +86 021 3392 8205 Mail: info@altenergy-power.com
APsystems Australia Suite 502, 8 Help Street, Chatswood NSW 2067 Australia Tel: +61 (0)2 8034 6587 Mail: info@altenergy-power.com
APsystems America 600 Ericksen Ave NE, Suite 200 Seattle, WA 98110 Tel: 844-666-7035 Mail: info@APsystems.com
APsystems Europe Rue des Monts dor ZAC de Folliouses Sud-Les Echets 01700 Miribel, France Tel: +33-481 65 60 40 Mail: emea@APsystems.com

APsystems ECU-B Installation/User Manual

23


WPS 文字