Super Sukkah Building Instructions
Safety Warnings - Please Read Before Use
Your Sukkahmart Sukkah and/or Rain Roof is intended for use in a protected garden or yard. Do not install your Sukkah in an open area which is exposed to high winds which may blow your Sukkah over.
If you are installing a Sukkah in an open area, it is recommended to use the Super Sukkah ONLY.
Wherever you place your Sukkah, it is vital that you anchor your Sukkah down so that it cannot lift off the ground. If wind lifts the Sukkah off the ground, the Sukkah may collapse upon landing. This is especially important when using a Sukkah Roof.
You can weigh your Sukkah down by placing sandbags or heavy objects on the bottom horizontal beam, or, for a Hard-Walled Sukkah, on the anchoring brackets supplied. The Hard-Walled Sukkah also comes with adaptors which can be used to tie-down the Sukkah, or to fix the Sukkah to your house.
Super Sukkah 3 x 4m Assembly Parts
Quantity of items for a 3x4 Sukkah:
- Part 1: Upright Corner Pole (x4) - 2m length, 5cm diameter
- Part 2: Upright Joiner Pole (x2) - 2m length, 5cm diameter
- Part 3: 2m Horizontal Pole for Top (x7) - Joins with Part 4, 5cm diameter
- Part 4: 1m Horizontal Pole for Top (x3) - Joins with Part 3, 5cm diameter
- Part 5: 2m Horizontal Pole for Middle (x3) - 2.5cm diameter
- Part 6: 2m Horizontal Pole for Middle (x2) - Joins with Part 7, 2.5cm diameter
- Part 7: 1m Horizontal Pole for Middle (x2) - Joins with Part 6, 2.5cm diameter
- Part 8: 2m Horizontal Pole for Base (x6) - Joins with Part 9, 2.5cm diameter
- Part 9: 1m Horizontal Pole for Base (x2) - Joins with Part 8, 2.5cm diameter
- Part 10: Joiner for Base Corner (x4) - 5cm diameter
- Part 11: Joiner for Base Middle (x2) - 5cm diameter
- Part 12: Joiner for Top Corner (x4) - 5cm diameter
- Part 13: Joiner for Top Middle (x2) - 5cm diameter
- Part 14: Lavud Straps (x3)
- Part 15: Material Covering (x1)
Super Sukkah 2 x 3m Assembly Parts
Quantity of items for a 2x3 Sukkah:
- Part 1: Upright Corner Pole (x4) - 2m length, 5cm diameter
- Part 2: Upright Joiner Pole (x0)
- Part 3: 2m Horizontal Pole for Top (x4) - Joins with Part 4, 5cm diameter
- Part 4: 1m Horizontal Pole for Top (x2) - Joins with Part 3, 5cm diameter
- Part 5: 2m Horizontal Pole for Middle (x2) - 2.5cm diameter
- Part 6: 2m Horizontal Pole for Middle (x1) - Joins with Part 7, 2.5cm diameter
- Part 7: 1m Horizontal Pole for Middle (x1) - Joins with Part 6, 2.5cm diameter
- Part 8: 2m Horizontal Pole for Base (x4) - Joins with Part 9, 2.5cm diameter
- Part 9: 1m Horizontal Pole for Base (x2) - Joins with Part 8, 2.5cm diameter
- Part 10: Joiner for Base Corner (x4) - 5cm diameter
- Part 11: Joiner for Base Middle (x0)
- Part 12: Joiner for Top Corner (x4) - 5cm diameter
- Part 13: Joiner for Top Middle (x0)
- Part 14: Lavud Straps (x3)
- Part 15: Material Covering (x1)
Super Sukkah 3 x 3m Assembly Parts
Quantity of items for a 3x3 Sukkah:
- Part 1: Upright Corner Pole (x4) - 2m length, 5cm diameter
- Part 2: Upright Joiner Pole (x0)
- Part 3: 2m Horizontal Pole for Top (x4) - Joins with Part 4, 5cm diameter
- Part 4: 1m Horizontal Pole for Top (x4) - Joins with Part 3, 5cm diameter
- Part 5: 2m Horizontal Pole for Middle (x3) - 2.5cm diameter
- Part 6: 2m Horizontal Pole for Middle (x3) - Joins with Part 7, 2.5cm diameter
- Part 7: 1m Horizontal Pole for Middle (x3) - Joins with Part 6, 2.5cm diameter
- Part 8: 2m Horizontal Pole for Base (x4) - Joins with Part 9, 2.5cm diameter
- Part 9: 1m Horizontal Pole for Base (x4) - Joins with Part 8, 2.5cm diameter
- Part 10: Joiner for Base Corner (x4) - 5cm diameter
- Part 11: Joiner for Base Middle (x0)
- Part 12: Joiner for Top Corner (x4) - 5cm diameter
- Part 13: Joiner for Top Middle (x0)
- Part 14: Lavud Straps (x3)
- Part 15: Material Covering (x1)
Super Sukkah 3 x 6m Assembly Parts
Quantity of items for a 3x6 Sukkah:
- Part 1: Upright Corner Pole (x4) - 2m length, 5cm diameter
- Part 2: Upright Joiner Pole (x2) - 2m length, 5cm diameter
- Part 3: 2m Horizontal Pole for Top (x7) - Joins with Part 4, 5cm diameter
- Part 4: 1m Horizontal Pole for Top (x7) - Joins with Part 3, 5cm diameter
- Part 5: 2m Horizontal Pole for Middle (x5) - 2.5cm diameter
- Part 6: 2m Horizontal Pole for Middle (x5) - Joins with Part 7, 2.5cm diameter
- Part 7: 1m Horizontal Pole for Middle (x5) - Joins with Part 6, 2.5cm diameter
- Part 8: 2m Horizontal Pole for Base (x6) - Joins with Part 9, 2.5cm diameter
- Part 9: 1m Horizontal Pole for Base (x6) - Joins with Part 8, 2.5cm diameter
- Part 10: Joiner for Base Corner (x4) - 5cm diameter
- Part 11: Joiner for Base Middle (x2) - 5cm diameter
- Part 12: Joiner for Top Corner (x4) - 5cm diameter
- Part 13: Joiner for Top Middle (x2) - 5cm diameter
- Part 14: Lavud Straps (x3)
- Part 15: Material Covering (x1)
Assembly Instructions
Step 1: Construct the Frame
Follow the diagram to construct the Sukkah frame.
- Begin by laying the base poles (Part 8 and Part 9) on the ground. Join the base poles together; they click into place.
- Attach the base corner joiners (Part 10) and middle base joiners (Part 11) to the base poles.
- Affix the upright corner poles (Part 1) to the base joiners (Part 10). Then affix the upright joiner pole (Part 2) to the middle base joiner (Part 11).
- Add the top corner and middle joiners (Part 12 and Part 13) to the corner and middle poles (Part 1 and Part 2).
- Join together the horizontal top poles (Part 3 and Part 4) and connect these poles to the top corner joiners (Part 12) and top middle joiners (Part 13).
- Join the horizontal middle poles (Part 6 and Part 7) together.
- Insert the horizontal middle poles (Part 5, Part 6, and Part 7) into the cavities on the upright poles (Part 1 and Part 2).
The full frame will now be standing on its own and should not fall over.
Diagram Description for Step 1: A wireframe illustration showing the Sukkah frame assembly. It depicts base poles connected to base joiners, upright poles attached to these, and top joiners fitted onto uprights. Horizontal poles are shown connecting the uprights at top and middle levels, with base horizontal poles also in place.
Step 2: Attach Material Covering
Unravel the material covering (Part 15) and place it around the frame. Ensure the door is in the correct position.
Fold and fasten the velcro around the top poles.
Do the same around the base poles.
Fasten all the velcro strips around the middle poles.
Diagram Description for Step 2: Shows the Sukkah frame with the material covering (Part 15) being attached. The covering is draped over the frame, with velcro fastenings indicated around the top, base, and middle poles.
Step 3: Secure with Straps
Take the black straps (Part 14) and secure one around a corner pole. Bring it around the pole and across to the next vertical pole, slipping it through the grooves on the pole.
Continue around the Sukkah and secure it around the last corner pole with the velcro. Repeat this for all three straps.
Note: Ensure that these straps are pulled taut.
This process will make your Sukkah kosher l'mehadrin.
Diagram Description for Step 3: Illustrates the final stage of assembly, showing the black straps (Part 14) being secured around the upright poles. One strap is shown wrapped around a corner pole and extending to the next vertical pole, passing through grooves. The diagram indicates the straps are pulled taut.
Completion and Further Information
Your Sukkah is now complete!
For more help and instruction videos, visit the Sukkahmart website: www.sukkahmart.co.uk.
You can now add your Permanent Schach and decorate your Sukkah!