Yitahome 6x4 ft Outdoor Resin Storage Shed Assembly Instructions
Site Preparation
Ensure the ground surface is level. The external floor measurements are approximately 1235mm (width) x 1705mm (depth).
Recommendation: Construct a wooden or concrete base as a foundation.
Visuals show the process of leveling the ground, preparing a foundation, and using tools for site preparation.
Care and Safety Guidelines
Read the care and safety guidelines at the end of this manual. Check to ensure that there are no missing or damaged parts BEFORE starting or arranging assembly. Remove all parts from the package(s) and spread them out on a clean work surface. Review all assembly instructions. Assemble all the parts according to the directions in this manual. Do not skip any steps.
Required Tools
- Spatula (part "SG8") - used for easier insertion of panels into profiles.
- 👥 Assembly requires two people.
Parts List
Part Number | Description | Quantity |
---|---|---|
CW4-3 | Panel | 1 |
CW4-1 | Panel | 1 |
CW3L | Panel | 1 |
CR1-2 | Panel | 1 |
CW2-2 | Panel | 2 |
CF1-2 | Floor Panel | 1 |
CA4 | Panel | 2 |
CS1 | Profile/Bracket | 2 |
CP1 | Profile | 1 |
CP2 | Profile | 2 |
CP3 | Profile | 2 |
CP5 | Profile | 4 |
CP4 | Base Profile | 1 |
CP6 | Profile | 2 |
CA1R | Bracket | 1 |
CA1L | Bracket | 1 |
CA3 | Bracket | 1 |
CA2 | Bracket | 1 |
CA2R | Bracket | 1 |
CA2L | Bracket | 1 |
CPA1 | Profile | 1 |
CPA2 | Profile | 1 |
CP7 | Profile | 4 |
CA1 | Bracket | 1 |
SG10 | Window Frame | 1 |
SG101 | Window Pane | 1 |
SG102 | Hinge/Bracket | 2 |
SG103 | Hinge/Bracket | 2 |
CR1-1 | Roof Panel | 2 |
CR1-3 | Roof Panel | 1 |
CW1-2 | Panel | 1 |
CF1-1 | Floor Panel | 2 |
CW1-1 | Panel | 3 |
CW2-1 | Panel | 4 |
CW3-1 | Panel | 4 |
CW1-3 | Panel | 1 |
CW1-4 | Panel | 1 |
CD1-4 | Door Panel | 1 |
CD1-1 | Door Panel | 1 |
CD1-6 | Door Panel | 1 |
CD1-5 | Door Panel | 1 |
CD1-2 | Door Panel | 1 |
CD1-3 | Door Panel | 1 |
M01 | Bracket | 4 |
M03-6L | Lock Part | 1 |
M03-7 | Lock Part | 1 |
SG6 | Bracket | 4 |
SG2 | Bracket | 4 |
SG7-2 | Bracket | 1 |
SG7-1 | Bracket | 1 |
SG8 | Spatula | 2 |
SG9 | Connector | 5 |
BY | Vent/Grille | 2 |
SG12 | Bracket | 2 |
Drill | Tool | 1 |
DC | Hinge | 2 |
SG13 | Bracket | 2 |
SG14 | Bracket | 4 |
M04 | Lock Part | 1 |
Z410 | Screw | 90 |
Z420 | Screw | 120 |
Z425 | Screw | 4 |
ZW413 | Screw | 28 |
CW3R | Panel | 1 |
Assembly Steps
Step 1: Floor Assembly
Assemble the floor panels. Connect two CF1-1 panels to one CF1-2 panel using the interlocking profiles. Ensure panels are fully fitted into the profiles.
Diagram shows interlocking floor panels. A checkmark indicates correct assembly, and a cross indicates incorrect assembly. Close-ups show the profile connection.
Parts used: CF1-1 (2x), CF1-2 (1x).
Step 2: Floor Assembly
Continue assembling the floor. Connect CF1-2 to CF1-1 panels. Ensure panels are fully fitted into the profiles.
Diagram shows connecting more floor panels, with close-ups of the interlocking mechanism and indicators for correct/incorrect fit.
Parts used: CF1-1 (2x), CF1-2 (1x).
Step 3: Floor Assembly
Attach profile CP1 and CP2 to the floor panels. Use bracket SG6. Ensure panels are fully fitted into the profiles.
Diagram shows attaching profile pieces to the floor assembly. Close-ups highlight the connection points and the use of SG6 brackets. Indicates correct fit with a checkmark.
Parts used: CP1 (1x), CP2 (1x), SG6 (1x).
Step 4: Floor Assembly
Attach profile CP2 to the floor assembly. Use bracket SG6. Ensure panels are fully fitted into the profiles.
Diagram shows attaching another profile piece (CP2) to the floor assembly using bracket SG6. Highlights correct fit.
Parts used: CP2 (1x), SG6 (1x).
Step 5: Floor Assembly
Attach profile CP3 to the floor assembly. Use bracket SG6 and SG7-1. Ensure panels are fully fitted into the profiles.
Diagram shows attaching profile CP3 using brackets SG6 and SG7-1. Close-ups detail the connection. Indicates correct fit.
Parts used: CP3 (1x), SG6 (1x), SG7-1 (1x).
Step 6: Floor Assembly
Attach profile CP4 to the floor assembly. Use bracket SG7-1. Ensure panels are fully fitted into the profiles.
Diagram shows attaching profile CP4 using bracket SG7-1. Close-ups detail the connection. Indicates correct fit.
Parts used: CP4 (1x), SG7-1 (1x).
Step 7: Floor Assembly
Attach profile CP3 and CP4 to the assembly. Use brackets SG6, SG7-2. Ensure panels are fully fitted into the profiles.
Diagram shows attaching profile pieces CP3 and CP4 using brackets SG6 and SG7-2. Close-ups detail the connection points. Indicates correct fit.
Parts used: CP3 (1x), CP4 (1x), SG6 (1x), SG7-2 (1x).
Step 8: Frame Assembly
Assemble the main frame. Attach corner pieces and diagonal bracing. The diagram indicates that AB=CD, suggesting symmetry.
Diagram shows the base frame with four corner points labeled A, B, C, D, and diagonal bracing lines. Screws (Z410) are shown being inserted at the corners.
Parts used: Z410 (4x).
Step 9: Base Panel Attachment
Attach base panel CP4. Ensure the side marked "This side down" is oriented correctly.
Diagram shows attaching a base panel (CP4) to the frame. Close-ups show the connection detail.
Parts used: CP4 (1x).
Step 10: Side Panel Attachment
Attach side panels using screws (Z420). Screw along the marked lines in the profile.
Diagram shows attaching side panels to the base frame using screws (Z420). The side marked "This side down" should be oriented correctly. A caution note advises using a drill to predrill holes at a depth of 1mm before screwing.
Parts used: Z420 (21x).
Step 11: Side Panel Attachment
Continue attaching side panels using screws (Z420). Ensure the side marked "This side down" is oriented correctly.
Diagram shows attaching more side panels to the base frame. Close-ups show the connection detail.
Parts used: CP4 (1x).
Step 12: Corner Profile Attachment
Attach corner profile CP5 to the structure. Ensure panels are fully fitted into the profiles.
Diagram shows attaching a vertical corner profile (CP5) to the assembled base and side panels. Close-ups detail the insertion method.
Parts used: CP5 (1x).
Step 13: Wall Panel Assembly
Attach wall panels CW1-1, CW1-2, CW1-3, CW2-1, CW2-2. Ensure panels are fully fitted into the profiles.
Diagram shows the assembly of wall panels onto the frame. Close-ups illustrate the interlocking mechanism and the use of SG8 spatula for insertion. Indicates correct fit with a checkmark.
Parts used: CW1-1 (1x), CW1-2 (1x), CW1-3 (1x), CW2-1 (2x), CW2-2 (2x), SG8 (1x).
Step 14: Wall Panel Alignment
Ensure wall panels are correctly aligned and fully fitted into the profiles. The two boards must be in line.
Diagram shows the partially assembled structure with wall panels. Checkmarks and crosses indicate correct and incorrect alignment of panels.
Parts used: CP4 (1x).
Step 15: Wall Panel Securing
Secure the wall panels using screws (Z420). Screw along the marked lines in the profile. A caution note advises using a drill to predrill holes at a depth of 1mm before screwing.
Diagram shows screws (Z420) being inserted into the wall panels along the profiles. Close-ups show the screw detail.
Parts used: Z420 (8x).
Step 16: Vertical Profile Attachment
Attach vertical profile CPA2 to the structure. Ensure panels are fully fitted into the profiles.
Diagram shows attaching a vertical profile (CPA2) to the wall assembly. Close-ups detail the connection.
Parts used: CPA2 (1x), SG8 (1x).
Step 17: Wall Panel Assembly
Attach wall panels CW2-1 and CW2-2. Ensure panels are fully fitted into the profiles.
Diagram shows attaching more wall panels (CW2-1, CW2-2) to the structure. Close-ups illustrate the interlocking mechanism. Indicates correct fit with a checkmark.
Parts used: CW2-1 (2x), CW2-2 (1x), SG8 (1x).
Step 18: Vertical Profile Attachment
Attach vertical profile CP5 to the structure. Ensure panels are fully fitted into the profiles.
Diagram shows attaching a vertical corner profile (CP5) to the wall assembly. Close-ups detail the insertion method. Indicates correct fit.
Parts used: CP5 (1x), SG8 (1x).
Step 19: Wall Panel Attachment
Attach wall panels CW1-4 and CW1-1. Ensure panels are fully fitted into the profiles.
Diagram shows attaching wall panels CW1-4 and CW1-1 to the structure. Close-ups illustrate the interlocking mechanism. Indicates correct fit with a checkmark.
Parts used: CW1-4 (1x), CW1-1 (2x), SG8 (2x).
Step 20: Panel Alignment
Ensure the panel joint is horizontal and the panels are correctly aligned.
Diagram shows the structure with panels, highlighting the horizontal panel joint. Checkmarks and crosses indicate correct and incorrect alignment.
Parts used: CP4 (1x).
Step 21: Wall Panel Securing
Secure the wall panels using screws (Z420). Screw along the marked lines in the profile. A caution note advises using a drill to predrill holes at a depth of 1mm before screwing.
Diagram shows screws (Z420) being inserted into the wall panels along the profiles. Close-ups show the screw detail.
Parts used: Z420 (8x).
Step 22: Horizontal Profile Attachment
Attach horizontal profile CPA1 to the structure. Ensure panels are fully fitted into the profiles.
Diagram shows attaching a horizontal profile (CPA1) to the wall assembly. Close-ups detail the connection.
Parts used: CPA1 (1x).
Step 23: Roof Support Attachment
Attach roof support panel CW4-1 and vent BY. Use screws (Z410).
Diagram shows attaching roof support panel CW4-1 and vent BY to the top of the structure using screws (Z410).
Parts used: CW4-1 (1x), BY (1x), Z410 (2x).
Step 24: Roof Panel Attachment
Attach roof panels. Ensure panels are fully fitted into the profiles. The two boards must be in line.
Diagram shows attaching roof panels. Close-ups show the connection detail. Indicates correct fit with a checkmark and incorrect fit with a cross. The diagram also shows the structure from the front with points A, B, C, D and the relation AB=CD.
Parts used: CP4 (1x).
Step 25: Roof Securing
Secure the roof structure using screws (Z410). Screw along the marked lines in the profiles. A caution note advises using a drill to predrill holes at a depth of 1mm before screwing.
Diagram shows screws (Z410) being inserted into the roof structure. Close-ups show the screw detail.
Parts used: Z410 (14x).
Step 26: Corner Profile Attachment
Attach corner profiles CP5 to the structure. Ensure panels are fully fitted into the profiles.
Diagram shows attaching vertical corner profiles (CP5) to the structure. Close-ups detail the insertion method. Indicates correct fit with a checkmark.
Parts used: CP5 (2x).
Step 27: Wall Panel Attachment
Attach wall panels CW3-1. Ensure panels are fully fitted into the profiles.
Diagram shows attaching wall panels (CW3-1) to the structure. Close-ups illustrate the interlocking mechanism. Indicates correct fit with a checkmark.
Parts used: CW3-1 (4x).
Step 28: Wall Panel Attachment
Attach wall panels CW3L and CW3R. Ensure panels are fully fitted into the profiles.
Diagram shows attaching wall panels CW3L and CW3R to the structure. Close-ups illustrate the interlocking mechanism. Indicates correct fit with a checkmark.
Parts used: CW3L (1x), CW3R (1x).
Step 29: Door Frame Attachment
Attach door frame profiles CA1L and CA1R. Use screws (Z410).
Diagram shows attaching vertical door frame profiles (CA1L, CA1R) to the structure. Close-ups show the connection and screw insertion.
Parts used: CA1L (1x), CA1R (1x), Z410 (2x).
Step 30: Top Beam Attachment
Attach top beam CA3. Ensure correct alignment.
Diagram shows attaching the top beam (CA3) to the door frame. Close-ups show the connection. An exclamation mark icon indicates a warning, and checkmarks/crosses show correct/incorrect alignment.
Parts used: CA3 (1x).
Step 31: Roof Support Attachment
Attach roof support panel CW4-3 and vent BY. Use screws (Z410).
Diagram shows attaching roof support panel CW4-3 and vent BY to the roof structure using screws (Z410).
Parts used: CW4-3 (1x), BY (1x), Z410 (2x).
Step 32: Roof Assembly
Attach the assembled roof section (CW4-3+BY) to the main structure.
Diagram shows the roof assembly being placed onto the main structure, aligning with the top beam CA3.
Parts used: CA3 (1x), CP4 (1x).
Step 33: Frame Alignment Check
Check frame alignment. The diagram indicates AB=CD, suggesting symmetry of the structure.
Diagram shows the assembled structure with points A, B, C, D marked on the corners, and diagonal lines indicating measurements. The relation AB=CD is highlighted.
Parts used: CP4 (1x).
Step 34: Bracing Attachment
Attach bracing elements SG12 and ZW413. Ensure fixation after aligning.
Diagram shows attaching brackets (SG12) and screws (ZW413) to reinforce the structure. Close-ups show the connection points and the alignment process with checkmarks and crosses.
Parts used: ZW413 (6x), SG12 (2x).
Step 35: Wall Securing
Secure the wall panels using screws (Z420). Screw when the boards are in position. A caution note advises using a drill to predrill holes at a depth of 1mm before screwing.
Diagram shows screws (Z420) being inserted into the wall panels along the profiles. Multiple views show the screw placement. Indicates correct fit with a checkmark.
Parts used: Z420 (32x).
Step 36: Window Frame Installation
Install the window frame (SG10) into the designated opening. Ensure it is fully fitted.
Diagram shows the window frame (SG10) being inserted into the opening on the shed wall. Arrows indicate the direction of insertion. The window frame is shown from different angles.
Parts used: SG10 (1x).
Step 37: Window Pane Installation
Install the window pane (SG101). Remove protective film before fixing. This step requires two people: one to press and one to assemble.
Diagram shows the window pane (SG101) being fitted into the window frame (SG10). Arrows indicate insertion. Close-ups show the process. The need for two people is indicated.
Parts used: SG101 (1x).
Step 38: Window Hinge/Bracket Installation
Install window hinges/brackets (SG102, SG103) and secure with screws (Z410). Press the plate boss section against SG101. Note the side with the bending edge pressed to SG101. It's better to fix just one screw on each SG102 & SG103 before adjusting into the right location.
Diagram shows the installation of window hinges/brackets (SG102, SG103) and screws (Z410). Steps 1, 2, and 3 illustrate the process of alignment and initial screw placement. A warning icon is present.
Parts used: SG102 (2x), SG103 (2x), Z410 (4x).
Step 39: Window Final Securing
Adjust SG102 & SG103 in the right location, then fix all screws (Z410). Ensure non-interference.
Diagram shows the final securing of the window components with screws (Z410). A view of the installed windows is provided. The diagram also shows a checkmark and cross indicating correct and incorrect installation.
Parts used: Z410 (12x).
Step 40: Roof Panel Assembly
Assemble roof panels CR1-1, CR1-2, CR1-3. Ensure the stripes should be upwards and panels are fully fitted inside the profile.
Diagram shows the assembly of roof panels. Close-ups illustrate the interlocking mechanism and the orientation of the panels (stripes upwards). Checkmarks and crosses indicate correct and incorrect assembly.
Parts used: CR1-1 (2x), CR1-3 (1x), CR1-2 (1x).
Step 41: Roof Panel Attachment
Attach roof panels to the structure using brackets SG2, SG6, SG7, CP6, CP7. Ensure panels are fully fitted inside the profile. Please note the measurement dimensions (approx. 75mm).
Diagram shows the roof panels being attached to the shed's upper frame using various brackets and profiles. Close-ups highlight the connection points and approximate measurements.
Parts used: SG2 (4x), CP6 (2x), CP7 (4x).
Step 42: Roof Frame Securing
Secure the roof frame using screws (Z410). The diagram indicates AB=CD, suggesting symmetry.
Diagram shows screws (Z410) being inserted to secure the roof frame. Points A, B, C, D are marked, and diagonal lines indicate measurements. The side marked "This side down" should be oriented correctly.
Parts used: Z410 (8x).
Step 43: Roof Panel Inversion
Turn the roof boards over. Ensure the side marked "This side down" is oriented correctly.
Diagram shows the roof assembly being flipped over.
Step 44: Roof Panel Securing
Secure the roof panels using screws (Z420). Screw along the marked lines in the profile. A caution note advises using a drill to predrill holes at a depth of 1mm before screwing. The distance from the profile edge to the first screw is about 40mm.
Diagram shows screws (Z420) being inserted into the roof panels. Close-ups show the screw placement and distance from the edge. SG2 brackets are also shown.
Parts used: Z420 (24x).
Step 45: Roof Panel Installation
Install the roof panels into the profiles. Ensure panels are fully fitted inside the profile.
Diagram shows the roof panels being slotted into the upper profiles of the shed. Close-ups illustrate the insertion process.
Parts used: CP4 (1x).
Step 46: Roof Panel Final Fit
Fully fit the roof panels inside the profiles of the roof. Use spatula SG8 if needed.
Diagram shows the final fitting of roof panels. The use of SG8 spatula is indicated. A visual of the completed roof fitting is shown.
Parts used: SG8 (1x).
Step 47: Roof Securing
Secure the roof panels using screws (Z420). A caution note advises using a drill to predrill holes at a depth of 1mm before screwing.
Diagram shows screws (Z420) being inserted into the roof panels from the inside. Checkmarks and crosses indicate correct and incorrect screw placement.
Parts used: Z420 (18x).
Step 48: Roof Edge Brackets
Attach brackets (SG1) and secure with screws (Z425).
Diagram shows brackets (SG1) being attached to the roof edges and secured with screws (Z425). Close-ups show the connection.
Parts used: SG1 (4x), Z425 (4x).
Step 49: Door Panel Preparation
Prepare the door panels (CD1-1 to CD1-6) for assembly. Use connectors (SG9). The stripes should be outside. The door mount is above.
Diagram shows the individual door panels laid out. Connectors (SG9) are shown being inserted into the grooves of the panels. Close-ups illustrate the connection. Indicates correct fit with a checkmark.
Parts used: CD1-1 (1x), CD1-2 (1x), CD1-3 (1x), CD1-4 (1x), CD1-5 (1x), CD1-6 (1x), SG9 (5x).
Step 50: Door Assembly
Assemble the left and right doors by connecting the prepared panels. Use connectors (SG9) as indicated.
Diagram shows the left and right door assemblies being formed by joining the panels. Arrows indicate insertion. Close-ups show the connection points. Checkmarks and crosses indicate correct and incorrect assembly.
Parts used: CD1-1 (1x), CD1-2 (1x), CD1-3 (1x), CD1-4 (1x), CD1-5 (1x), CD1-6 (1x), SG9 (5x).
Step 51: Door Frame Attachment
Attach door frame profiles CA2L, CA2R, CA2, and CA1 to the door panels. Use spatula SG8.
Diagram shows door frame profiles being attached to the assembled door panels. Close-ups illustrate the connection points labeled A and B.
Parts used: CA2R (1x), CA2L (1x), CA2 (1x), CA1 (1x), SG8 (1x).
Step 52: Left Door Panel Reinforcement
Reinforce the left door panels using profiles CA4 and CS1.
Diagram shows profiles CA4 and CS1 being attached to the left door panels. Close-ups illustrate the connection.
Parts used: CA4 (1x), CS1 (1x).
Step 53: Right Door Panel Reinforcement
Reinforce the right door panels using profiles CA4 and CS1.
Diagram shows profiles CA4 and CS1 being attached to the right door panels. Close-ups illustrate the connection.
Parts used: CA4 (1x), CS1 (1x).
Step 54: Door Inversion
Turn the assembled doors over.
Diagram shows the left and right door assemblies being flipped over.
Step 55: Door Alignment Check
Check door alignment. The diagram indicates AB=CD and ab=cd, suggesting symmetry and correct positioning.
Diagram shows the left and right doors with points A, B, C, D and a, b, c, d marked, indicating alignment checks.
Step 56: Door Securing
Secure the door frames using screws (ZW413).
Diagram shows screws (ZW413) being inserted to secure the door frames. Close-ups show the screw placement.
Parts used: ZW413 (20x).
Step 57: Door Hinge Attachment
Attach hinges (DC) and secure with screws (Z410) to the door panels.
Diagram shows hinges (DC) being attached to the door panels and secured with screws (Z410). Close-ups illustrate the connection.
Parts used: DC (2x), Z410 (8x).
Step 58: Door Inversion
Turn the assembled doors over.
Diagram shows the left and right door assemblies being flipped over.
Step 59: Lock Mechanism Assembly
Assemble the lock mechanism parts M03-6L and M03-7.
Diagram shows a four-step process for assembling the lock components M03-6L and M03-7.
Parts used: M03-6L (1x), M03-7 (1x).
Step 60: Door Hinge and Lock Attachment
Attach door hinges and lock mechanism. Use screws (Z410) and part MO4. Do not fasten screws tightly in this step; allow for adjustment of door positions.
Diagram shows hinges and lock parts being attached to the door frames. Points A and B are marked for alignment. Close-ups show the connection of M03-6L + M03-7 and MO4.
Parts used: Z410 (12x), MO1 (4x), MO4 (1x), M03-6L (1x), M03-7 (1x).
Step 61: Door Installation and Final Securing
Install the doors onto the shed. Ensure the joints of both left and right doors are in line. Nail the door after placement adjustment and fasten all screws (Z410).
Diagram shows the doors being hung on the shed. Points A are marked for screw locations. Close-ups show the alignment and screw fastening. The final structure with doors is shown.
Parts used: Z410 (20x).
Step 62: Lock Securing
Secure the lock mechanism using screws (ZW413) and part M04.
Diagram shows the lock mechanism on the doors being secured with screws (ZW413) and part M04. Close-ups illustrate the connection.
Parts used: ZW413 (2x), M04 (1x).
Step 63: Final Bracing
Attach final bracing brackets (SG14, SG13) using screws (Z420).
Diagram shows brackets (SG14, SG13) being attached to the interior of the shed structure and secured with screws (Z420). Close-ups show the connection points labeled A and B.
Parts used: SG14 (4x), SG13 (2x), Z420 (8x).
Parts Schematic
This section provides a visual overview of all parts, grouped by their location on the shed (Roof Parts, Rear Side, Front, Left, Right, Floor Parts, Door Parts). It serves as a reference for identifying individual components.