3 Door 2 Drawer Wardrobe Assembly Instructions

Important Information

Please Read Before You Continue Further

For Domestic Use Only

Care and Maintenance

Important Information!

Please read the entire manual before starting to assemble and/or using this product. Follow the manual thoroughly and keep it for further reference.

Illustration: A person looking confused at a furniture panel, with a question mark above their head, emphasizing the importance of reading instructions.

Avoid Scratches!

In order to avoid scratching, this furniture should be assembled on a soft layer, such as a rug.

Illustration: A person assembling furniture on a soft rug to prevent scratches.

Improve Efficiency!

Try to find a partner to install with you, which can speed up the installation efficiency and shorten the time.

Illustration: Two people working together to assemble furniture, indicating improved efficiency.

Anti-Tipple Warning!

Overturned furniture can cause serious or fatal crush injuries. To prevent tipping over, be sure to use the wall attachment, if not included with this product. Please purchase the wall attachment that fits your wall. If unsure, seek professional advice. Please read and follow each step of the instructions carefully.

Illustrations showing potential tipping hazards with 'X' marks, emphasizing the need for the anti-topple system.

Important!

It is important that any product assembled using any kind of screw is re-tightened 2 weeks after assembly, and once every 3 months to assure stability throughout the lifespan of the product.

For regular maintenance and cleaning of the product: for the frame, please use a rag dipped in neutral detergent to fully wipe it, and then dry it with a clean rag. For glass materials, wipe with a rag dampened with water glass cleaner, and then dry with a dry rag.

Do not use an electric screwdriver, and do not use too much force when installing, because the board is easy to break.

Parts List

The parts below have been stamped with the part number/color to help identify them during assembly.

Part NumberPart DescriptionQuantityCarton
1Large Base Panel - Black12/3
2Small Base Panel - Green12/3
3Division Panel - Green11/3
4Top Panel - Green12/3
5Left Side Panel - Red11/3
6Right Side Panel - Blue11/3
7Shelf - Blue12/3
8Front Baseboard - Green12/3
9Back Baseboard - Black12/3
10Small Back Panel23/3
11Large Back Panel13/3
12Frame11/3
13Large Door13/3
14Right Small Door13/3
15Left Small Door13/3
16Drawer Side - Blue42/3
17Drawer Back Panel - Red22/3
18Drawer Front22/3
19Drawer Bottom21/3
20Drawer Bottom Support Bar - Black22/3
21Movable Shelf - Red22/3
22Anti Tip Device - Red11/3

Diagram: An isometric view of the wardrobe assembly, illustrating the placement of various numbered parts (e.g., panels, shelves, doors, drawers) with color coding (GREEN, RED, BLUE, BLACK) and numerical labels.

Fittings

LetterDescriptionQuantity
AFlat Head Screw Ø6,0 x 10mm8x
BSupport Pin 6X88x
CFlat Head Screw Ø4,0 x 14 mm52x
DFlan Head Screw Ø4,0 x 20mm10x
EFlat Head Screw Ø3,5 x 40mm4x
FFlat Head Screw Ø4,0 x 50 mm30x
GDowel Ø6,0 x 30mm48x
HNail 10 x 1098x
IDoor Stopper2x
J'L' Metallic Support8x
KHanging Rail Support2x
LFlan Head Screw Ø5,0 x 50mm2x
MPlastic Foot3x
NHanging Rail1x
OHinge9x
PHinge Plate9x
QDrawer Runners2x
RBack Panel Strip1x
SFlan Head Screw 3,5 x14mm9x
THandle5x
UHole Plugs22x
VGlue2x
WCam Nut4x
XCam Bolt4x
YHanging Rail (1x)1x
ZFlat Head Screw Ø4,0 x 12mm25x
A1Back Panel Bracket16x
B1(2x)(2x)

Diagram: A grid displaying various hardware components labeled with letters (A-Z, A1, B1), showing their shape and quantity. Includes tools required: screwdriver ? and hammer ?.

Tools Required: Screwdriver ?, Hammer ?.

Important Notes:

Step 1: Base Assembly

Parts Required: 01-Large Base Panel - Black (x1), 02-Small Base Panel - Green (x1), 07-Shelf - Blue (x1)

Hardware Required: G (Dowel Ø6,0 x 30mm) (x12), V (Glue) (x1), Z (Flat Head Screw Ø4,0 x 12mm) (x2)

This step involves assembling the base of the wardrobe. Part 1 (Large Base Panel - Black) is positioned. Part 7 (Shelf - Blue) is attached to Part 1 using hardware G (Dowels) and Z (Screws). Part 2 (Small Base Panel - Green) is then attached to Part 1 and Part 7 using hardware G (Dowels) and V (Glue). The diagram highlights pre-marked holes for accurate placement.

Diagram: Shows Part 1 (Black) being prepared. Dowels (G) are inserted into Part 1. Part 7 (Blue) is then aligned and attached to Part 1 with dowels and screws (Z). Part 2 (Green) is shown being attached to the assembly using dowels (G) and glue (V). Arrows indicate the connection points.

Step 2: Baseboard Attachment

Parts Required: 08-Front Baseboard - Green (x1), 09-Back Baseboard - Black (x1)

Hardware Required: G (Dowel Ø6,0 x 30mm) (x10), H (Nail 10 x 10) (x1), L (Flan Head Screw Ø5,0 x 50mm) (x1), V (Glue) (x1)

This step attaches the baseboards to the assembled base. Part 8 (Front Baseboard - Green) is attached to the front of the base assembly using hardware G (Dowels), L (Screw), and V (Glue). Part 9 (Back Baseboard - Black) is attached to the back using hardware G (Dowels) and H (Nails). The diagram shows the placement of these panels and hardware.

Diagram: Shows Part 8 (Green) being attached to the front of the base structure using dowels (G), screws (L), and glue (V). Part 9 (Black) is shown being attached to the back using dowels (G) and nails (H). Close-ups show the hardware insertion points.

Step 3: Division Panel Attachment

Parts Required: 03-Division Panel - Green (x1)

Hardware Required: B (Support Pin 6X8) (x4), C (Flat Head Screw Ø4,0 x 14 mm) (x4)

This step involves attaching the division panel. Part 3 (Division Panel - Green) is positioned vertically within the wardrobe structure. Hardware B (Support Pins) are inserted into the base panel, and then Part 3 is secured to these pins. Hardware C (Screws) are used to further secure the panel.

Diagram: Shows Part 3 (Green) being placed vertically. Support pins (B) are inserted into the base. Part 3 is then aligned and secured with screws (C). The diagram highlights pre-drilled holes.

Step 4: Attaching Drawer Runners to Division Panel

Parts Required: 03-Division Panel - Green (x1)

Hardware Required: A (Flat Head Screw Ø6,0 x 10mm) (x4), C (Flat Head Screw Ø4,0 x 14 mm) (x8), G (Dowel Ø6,0 x 30mm) (x2), M (Plastic Foot) (x1), P (Hinge Plate) (x3), Q (Drawer Runners) (x2)

This step attaches drawer runners and hinge plates to the division panel. Part 3 (Division Panel - Green) is laid flat. Drawer runners (Q) are attached to the panel using screws (A and C). Plastic feet (M) and hinge plates (P) are also attached to the panel using screws (C and G). The diagram indicates specific holes for attachment, including "SECOND HOLE" and "LAST SEVENTH HOLE" for the runners.

Diagram: Shows Part 3 (Green) flat. Drawer runners (Q) are screwed into place using hardware A and C, with specific hole references. Plastic feet (M) and hinge plates (P) are also attached using screws C and G. Arrows indicate the orientation and placement.

Step 5: Attaching Drawer Runners to Left Side Panel

Parts Required: 05-Left Side Panel - Red (x1)

Hardware Required: A (Flat Head Screw Ø6,0 x 10mm) (x4), C (Flat Head Screw Ø4,0 x 14 mm) (x8), H (Nail 10 x 10) (x1), L (Flan Head Screw Ø5,0 x 50mm) (x1), M (Plastic Foot) (x1), P (Hinge Plate) (x3), Q (Drawer Runners) (x2)

This step attaches drawer runners and hinge plates to the left side panel. Part 5 (Left Side Panel - Red) is laid flat. Drawer runners (Q) are attached using screws (A and C). Plastic feet (M) and hinge plates (P) are also attached using screws (C and H, L). The diagram indicates specific holes for attachment, including "SECOND HOLE" and "LAST SEVENTH HOLE" for the runners.

Diagram: Shows Part 5 (Red) flat. Drawer runners (Q) are screwed into place using hardware A and C, with specific hole references. Plastic feet (M) and hinge plates (P) are also attached using screws C, H, and L. Arrows indicate the orientation and placement.

Step 6: Attaching Drawer Runners to Right Side Panel

Parts Required: 06-Right Side Panel - Blue (x1)

Hardware Required: B (Support Pin 6X8) (x4), C (Flat Head Screw Ø4,0 x 14 mm) (x6), H (Nail 10 x 10) (x1), L (Flan Head Screw Ø5,0 x 50mm) (x1), P (Hinge Plate) (x3)

This step attaches drawer runners and hinge plates to the right side panel. Part 6 (Right Side Panel - Blue) is laid flat. Drawer runners (Q) are attached using screws (C). Plastic feet (M) are attached using screws (H, L). Hinge plates (P) are also attached using screws (C). The diagram indicates specific holes for attachment, including "SECOND HOLE" and "LAST SEVENTH HOLE" for the runners.

Diagram: Shows Part 6 (Blue) flat. Drawer runners (Q) are screwed into place using hardware C. Plastic feet (M) are attached using screws H and L. Hinge plates (P) are also attached using screws C. Arrows indicate the orientation and placement.

Step 7: Attaching Drawer Runners to Top Panel

Parts Required: 04-Top Panel - Green (x1)

Hardware Required: G (Dowel Ø6,0 x 30mm) (x4), I (Door Stopper) (x1), V (Glue) (x1), Z (Flat Head Screw Ø4,0 x 12mm) (x2)

This step attaches drawer runners to the top panel. Part 4 (Top Panel - Green) is laid flat. Drawer runners (Q) are attached using hardware G (Dowels) and Z (Screws). A door stopper (I) is also attached using V (Glue). The diagram indicates pre-marked holes for alignment.

Diagram: Shows Part 4 (Green) flat. Drawer runners (Q) are attached using dowels (G) and screws (Z). A door stopper (I) is attached with glue (V). Arrows indicate connection points.

Step 8: Attaching Dowels to Top Panel

Parts Required: 04-Top Panel - Green (x1)

Hardware Required: J (L' Metallic Support) (x3), Z (Flat Head Screw Ø4,0 x 12mm) (x3)

This step involves attaching metallic supports to the top panel. Part 4 (Top Panel - Green) is shown. Hardware J (L' Metallic Supports) are attached to the panel using hardware Z (Screws). The diagram indicates pre-drilled holes for precise placement.

Diagram: Shows Part 4 (Green). Metallic supports (J) are screwed into the panel using screws (Z). Close-up views show the insertion of screws into pre-drilled holes.

Step 9: Assembling Main Frame - Base and Division Panel

Parts Required: 01-Large Base Panel - Black (x1), 02-Small Base Panel - Green (x1), 03-Division Panel - Green (x1), 04-Top Panel - Green (x1)

Hardware Required: F (Flat Head Screw Ø4,0 x 50 mm) (x6), V (Glue) (x1)

This step begins assembling the main structure. Part 1 (Large Base Panel - Black) and Part 2 (Small Base Panel - Green) are joined. Part 3 (Division Panel - Green) is attached to these base panels. Part 4 (Top Panel - Green) is then attached to the top of the structure. Hardware F (Screws) and V (Glue) are used for these connections. The diagram shows the orientation and connection points.

Diagram: Shows Part 1 (Black) and Part 2 (Green) being joined. Part 3 (Green) is attached to the base panels. Part 4 (Green) is then placed on top and secured. Screws (F) and glue (V) are used. Arrows indicate the assembly direction.

Step 10: Attaching Left Side Panel

Parts Required: 05-Left Side Panel - Red (x1)

Hardware Required: F (Flat Head Screw Ø4,0 x 50 mm) (x4), V (Glue) (x1)

This step attaches the left side panel to the main structure. Part 5 (Left Side Panel - Red) is aligned with the assembled frame. Hardware F (Screws) and V (Glue) are used to secure the panel. The diagram shows the panel being attached to the base and top panels.

Diagram: Shows Part 5 (Red) being attached to the left side of the main wardrobe frame. Screws (F) and glue (V) are used. Arrows indicate the connection points.

Step 11: Attaching Right Side Panel and Shelves

Parts Required: 06-Right Side Panel - Blue (x1), 07-Shelf - Blue (x1), 08-Front Baseboard - Green (x1), 09-Back Baseboard - Black (x1)

Hardware Required: F (Flat Head Screw Ø4,0 x 50 mm) (x12), V (Glue) (x1)

This step attaches the right side panel and the shelf. Part 6 (Right Side Panel - Blue) is attached to the main structure using hardware F (Screws) and V (Glue). Part 7 (Shelf - Blue) is inserted and secured. The baseboards (Parts 8 and 9) are also attached. The diagram shows the placement of these components and the hardware used.

Diagram: Shows Part 6 (Blue) being attached to the right side of the wardrobe frame using screws (F) and glue (V). Part 7 (Blue) is shown being placed and secured. Parts 8 (Green) and 9 (Black) baseboards are also attached. Arrows indicate connection points.

Step 12: Attaching Back Panels

Parts Required: 10-Small Back Panel (x2), 11-Large Back Panel (x1)

Hardware Required: H (Nail 10 x 10) (x9), R (Back Panel Strip) (x1), S (Flan Head Screw 3,5 x14mm) (x9)

This step involves attaching the back panels. Parts 10 (Small Back Panels) and 11 (Large Back Panel) are positioned on the rear of the wardrobe. A back panel strip (R) is used to join the panels. Hardware S (Screws) and H (Nails) are used to secure the back panels to the frame. The diagram emphasizes aligning Part 10/11 correctly at the top before fitting hardware H, and ensuring Part 10/11 does not overhang before screwing fitting B into the plinth.

Diagram: Shows the back of the wardrobe. Two small back panels (10) and one large back panel (11) are placed. A back panel strip (R) is used to join them. Screws (S) and nails (H) secure the panels. Close-ups show the alignment and screwing process.

Step 13: Drawer Assembly - Sides and Bottom

Parts Required: (Implicitly drawer sides and bottom)

Hardware Required: H (Nail 10 x 10) (x50), A1 (Back Panel Bracket) (x16)

This step appears to be part of the drawer assembly, focusing on securing the drawer sides and bottom. It shows a drawer box structure being assembled. Hardware H (Nails) and A1 (Back Panel Brackets) are used to reinforce the structure. The diagram shows numerous nails being hammered in and brackets being attached.

Diagram: Shows a drawer box structure. Numerous nails (H) are hammered into the edges to join the panels. Back panel brackets (A1) are also attached to reinforce the corners.

Step 14: Drawer Assembly - Continued

Parts Required: (Implicitly drawer parts)

Hardware Required: H (Nail 10 x 10) (x3), J (L' Metallic Support) (x2), Z (Flat Head Screw Ø4,0 x 12mm) (x4)

This step continues the drawer assembly. It shows the drawer box structure with dimensions indicated (816mm, 1304mm). Hardware H (Nails), J (Metallic Supports), and Z (Screws) are used to further assemble and reinforce the drawer. The diagram shows the placement of these components.

Diagram: Shows the drawer box assembly with dimensions. Nails (H) are used for joining. Metallic supports (J) are attached using screws (Z). Arrows indicate the connection points.

Step 15: Frame Assembly

Parts Required: 12-Frame (x1)

Hardware Required: J (L' Metallic Support) (x2), Z (Flat Head Screw Ø4,0 x 12mm) (x7)

This step involves assembling the frame, likely for the drawers or internal structure. Part 12 (Frame) is shown. Hardware J (Metallic Supports) are attached using hardware Z (Screws). The diagram indicates "Align corners" for proper assembly.

Diagram: Shows Part 12 (Frame). Metallic supports (J) are attached using screws (Z). The diagram emphasizes aligning the corners of the frame.

Step 16: Attaching Anti-Tip Device

Parts Required: 22-Anti Tip Device - Red (x1)

Hardware Required: F (Flat Head Screw Ø4,0 x 50 mm) (x4)

This step attaches the anti-tip device. Part 22 (Anti Tip Device - Red) is shown being attached to the top rear of the wardrobe structure using hardware F (Screws). The diagram indicates the placement of the device.

Diagram: Shows the anti-tip device (22) being attached to the top rear of the wardrobe using screws (F). The red color indicates the part. Arrows show the attachment points.

Step 17: Installing Hanging Rail

Parts Required: (Implicitly hanging rail components)

Hardware Required: Y (Hanging Rail) (x1)

This step installs the hanging rail. Hardware Y (Hanging Rail) is shown being inserted into the hanging rail supports (K) previously installed in the wardrobe. An arrow indicates the direction of insertion.

Diagram: Shows the interior of the wardrobe. A hanging rail (Y) is being inserted into the hanging rail supports (K) on the side panels.

Step 18: Installing Anti-Tip System (Wall Attachment)

Instructions: Install anti-tipping device as shown. First, approach the furniture as close as possible to the wall.

Tools Required: Pencil, 3/8'' drill bit.

Hardware Required: K (Hanging Rail Support) (x2), N (Hanging Rail) (x2), B1 (Hardware for wall attachment) (x2), Z (Flat Head Screw Ø4,0 x 12mm) (x4)

This step details the process of securing the wardrobe to the wall using the anti-tip system. It shows how to attach the bracket (K) to the wall using hardware B1 and N (screws). A pencil is used to mark the wall for drilling. The diagram shows the bracket (K) being attached to the wall with screws (N) and then the wardrobe part (4) being attached to the bracket with screws (Z). It also shows the use of a 3/8'' drill bit.

Diagram: Shows the wardrobe positioned near a wall. Brackets (K) are attached to the wall using hardware B1 and N. The wardrobe's top panel (4) is then secured to these brackets using screws (Z). A close-up shows the drilling process and hardware placement. The diagram indicates K = 02x, N = 02x, Z = 04x.

Step 19: Installing Anti-Tip System (Securing)

Instructions: Put hardware (B1) into the hole that you drilled on the wall. Connect the hardware (K) on the wall using the hardware (N). Connect the hardware (K) on the part 4 (green) with hardware (Z).

Hardware Required: B1 (Hardware for wall attachment) (x2), K (Hanging Rail Support) (x2), N (Hanging Rail) (x2), Z (Flat Head Screw Ø4,0 x 12mm) (x4)

This step provides further detail on securing the anti-tip system. It explains inserting wall plugs (B1), attaching the bracket (K) to the wall with screws (N), and then attaching the bracket (K) to the furniture (part 4) with screws (Z). The diagram visually confirms these connections.

Diagram: Illustrates the sequence: 1. Wall plugs (B1) inserted into the wall. 2. Bracket (K) attached to the wall with screws (N). 3. Bracket (K) attached to the furniture panel (4) with screws (Z). The quantities are reiterated: B1 = 02x, N = 02x, Z = 04x.

Step 20: Final Product View

After installing the anti-tip system, your product is ready to use.

Diagram: An isometric view of the fully assembled wardrobe, indicating it is ready for use after the anti-tip system installation.

Step 21: Drawer Assembly - Sides and Support Bars

Parts Required: 16-Drawer Side - Blue (x4), 17-Drawer Back Panel - Red (x2), 20-Drawer Bottom Support Bar - Black (x2)

Hardware Required: G (Dowel Ø6,0 x 30mm) (x20), V (Glue) (x1)

This step focuses on assembling the drawer components. It shows drawer sides (16 - Blue), drawer back panels (17 - Red), and drawer bottom support bars (20 - Black). Hardware G (Dowels) and V (Glue) are used to join these parts. The diagram shows multiple drawer sides and support bars being prepared.

Diagram: Shows four drawer sides (16 - Blue), two drawer back panels (17 - Red), and two drawer bottom support bars (20 - Black). Dowels (G) are inserted into the parts, and glue (V) is applied for assembly.

Step 22: Drawer Assembly - Front Panel

Parts Required: 18-Drawer Front (x2)

Hardware Required: X (Cam Bolt) (x4)

This step attaches the drawer front panels. Part 18 (Drawer Front) is shown being attached to the drawer box. Hardware X (Cam Bolts) are used for this connection. The diagram shows two drawer fronts being attached.

Diagram: Shows two drawer front panels (18) being attached to the drawer boxes. Cam bolts (X) are used for this connection. Arrows indicate the insertion points.

Step 23: Drawer Assembly - Sides to Back Panel

Parts Required: 16-Drawer Side - Blue (x4), 17-Drawer Back Panel - Red (x2)

Hardware Required: F (Flat Head Screw Ø4,0 x 50 mm) (x4)

This step connects the drawer sides to the drawer back panel. Two drawer sides (16 - Blue) are attached to a drawer back panel (17 - Red) using hardware F (Screws). This is repeated for the second drawer. The diagram shows the orientation and connection points.

Diagram: Shows two drawer sides (16 - Blue) being attached to a drawer back panel (17 - Red) using screws (F). This process is shown for two drawers.

Step 24: Drawer Assembly - Completing the Box

Parts Required: 18-Drawer Front (x2)

Hardware Required: U (Hole Plugs) (x8), V (Glue) (x1), W (Cam Nut) (x4), X (Cam Bolt) (x4)

This step completes the drawer box assembly. The drawer front (18) is attached using cam bolts (X) and cam nuts (W). Hole plugs (U) are used to cover the holes, and glue (V) is used for adhesion. The diagram shows the cam bolt head needing to be in the center for proper locking.

Diagram: Shows the drawer front (18) being attached to the drawer box. Cam bolts (X) are inserted into the front panel, and cam nuts (W) are used to secure them from the inside. Hole plugs (U) are inserted to cover the cam nuts. The diagram emphasizes correct cam bolt head positioning.

Step 25: Drawer Assembly - Bottom Panel

Parts Required: 19-Drawer Bottom (x2)

Hardware Required: H (Nail 10 x 10) (x8)

This step attaches the drawer bottom panels. Part 19 (Drawer Bottom) is shown being secured to the assembled drawer box using hardware H (Nails). The diagram shows nails being hammered into the edges at specific distances (43mm).

Diagram: Shows two drawer bottom panels (19) being attached to the drawer boxes. Nails (H) are hammered along the edges at 43mm intervals to secure the bottom.

Step 26: Drawer Assembly - Bottom Support Bar

Parts Required: 20-Drawer Bottom Support Bar - Black (x2)

Hardware Required: E (Flat Head Screw Ø3,5 x 40mm) (x4), H (Nail 10 x 10) (x12)

This step attaches the drawer bottom support bars. Part 20 (Drawer Bottom Support Bar - Black) is shown being attached to the drawer assembly using hardware E (Screws) and H (Nails). The diagram shows the placement and securing of these bars.

Diagram: Shows two drawer bottom support bars (20 - Black) being attached to the drawer assembly. Screws (E) and nails (H) are used. The diagram indicates the position of the bars and the hardware.

Step 27: Drawer Assembly - Runners and Handles

Hardware Required: C (Flat Head Screw Ø4,0 x 14 mm) (x8), D (Flan Head Screw Ø4,0 x 20mm) (x4), Q (Drawer Runners) (x4), T (Handle) (x2)

This step attaches the drawer runners and handles to the assembled drawers. Drawer runners (Q) are attached to the sides of the drawers using screws (C). Handles (T) are attached to the drawer fronts using screws (D). The diagram shows the placement of runners and handles, referencing "THIRD HOLE" and "LAST THIRD HOLE" for runner alignment.

Diagram: Shows drawer runners (Q) being attached to the sides of the drawers using screws (C), referencing specific holes. Handles (T) are attached to the drawer fronts using screws (D).

Step 28: Attaching Doors

Parts Required: 13-Large Door (x1), 14-Right Small Door (x1), 15-Left Small Door (x1)

Hardware Required: C (Flat Head Screw Ø4,0 x 14 mm) (x18), O (Hinge) (x9)

This step attaches the doors to the wardrobe. The large door (13) and small doors (14, 15) are shown being attached using hinges (O) and screws (C). The diagram shows multiple hinges being attached to the doors and the wardrobe frame. It indicates that doors are labeled LEFT or RIGHT.

Diagram: Shows the large door (13) and small doors (14, 15) being attached to the wardrobe frame using hinges (O) and screws (C). The diagram highlights the hinge attachment points on both the doors and the wardrobe panels.

Step 29: Installing Movable Shelves

Parts Required: 13-Large Door (x1), 14-Right Small Door (x1), 15-Left Small Door (x1), 21-Movable Shelf - Red (x2)

Hardware Required: U (Hole Plugs) (x14)

This step involves installing the movable shelves. Two movable shelves (21 - Red) are shown being placed inside the wardrobe. The diagram indicates shelf placement within the wardrobe compartments. It also reiterates that doors are labeled LEFT or RIGHT for easier identification. Dimensions for door height are shown (670mm, 495mm).

Diagram: Shows the wardrobe interior. Two movable shelves (21 - Red) are being inserted into the designated shelf supports. Arrows indicate the placement. Door labels (LEFT/RIGHT) are mentioned.

Step 30: Attaching Handles to Doors

Hardware Required: D (Flan Head Screw Ø4,0 x 20mm) (x6), T (Handle) (x3)

This step attaches the handles to the doors. Handles (T) are shown being attached to the large door (13) and the small doors (14, 15) using hardware D (Screws). The diagram shows the handles being screwed into place from the inside of the doors.

Diagram: Shows handles (T) being attached to the doors using screws (D). The diagram focuses on the attachment points on the doors.

Step 31: Door and Drawer Adjustments

Hardware Required: C (Flat Head Screw Ø4,0 x 14 mm) (x4)

This step details how to adjust the doors and drawers for proper alignment. It shows diagrams for "Height Adjustment", "Internal Adjustment", and "Depth Adjustment" for the doors using the hinges. It also shows "Drawer Adjustment" and "Drawer Lock" mechanisms, likely referring to the drawer runners and their locking features. Hardware C (Screws) are shown in relation to these adjustments.

Diagram: Illustrates various adjustment mechanisms for the wardrobe doors and drawers. Includes controls for height, internal, and depth adjustments of doors, and adjustments for drawers. Close-ups show specific adjustment screws (C) on hinges and drawer runners.

Step 32: Final Product View

The wardrobe is now fully assembled and ready for use.

Diagram: An isometric view of the completed 3 Door 2 Drawer Wardrobe.

Models: scbn1002, W111024381, W111024381 3 Doors Wardrobe High Gloss, W111024381, 3 Doors Wardrobe High Gloss, Wardrobe High Gloss, High Gloss

PDF preview unavailable. Download the PDF instead.

owner manual scbn1002

Related Documents

PreviewAssembly Instructions for Latitude Run 3-Door Mirror Wardrobe (Model becn5486)
Comprehensive assembly guide for the Latitude Run 3-Door Mirror Wardrobe (Model becn5486). Includes detailed parts list, hardware inventory, and step-by-step instructions with textual descriptions of diagrams for easy setup.
PreviewAssembly Instructions for Latitude Run Long Closet Rods Closet with Open Drawers
Comprehensive assembly instructions for the Latitude Run Long Closet Rods Closet with Open Drawers. This guide provides a detailed breakdown of parts, hardware, and step-by-step instructions for building your closet system.
PreviewCloset System Assembly Instructions - Latitude Run
Comprehensive assembly guide for the Latitude Run Closet System, featuring detailed part lists, hardware identification, step-by-step instructions, and safety tips for building your storage unit.
PreviewLatitude Run Wardrobe Assembly Instructions and Manual
Comprehensive assembly guide for the Latitude Run Wardrobe, including step-by-step instructions, parts list, warranty, and returns information.
PreviewLatitude Run Closet System Assembly Instructions - Model aebp1499
Detailed assembly instructions for the Latitude Run closet system with open drawers, model aebp1499. Includes a comprehensive parts list, hardware list, and step-by-step visual guidance for assembly.
PreviewLatitude Run Collins Modern 6-Drawer Dresser Assembly Instructions
Detailed assembly instructions for the Latitude Run Collins Modern 6-Drawer Dresser, including parts list, hardware guide, and safety tips for proper installation.
PreviewLatitude Run Modular Storage Drawer Base Cabinet Assembly Instructions
Detailed assembly instructions for the Latitude Run modular storage drawer base cabinet, including parts list, hardware, tools, safety warnings, and step-by-step guidance for model nnit1180.
PreviewAssembly Instructions for Latitude Run NNIT1164 Tall Storage Cabinet
Comprehensive assembly instructions for the Latitude Run NNIT1164 tall storage cabinet. This guide includes safety warnings, a detailed parts list, hardware identification, recommended tools, and step-by-step assembly procedures for building your furniture.