Installation Guide for sunways models including: STS 3 6kW Series Grid-connected PV Inverter Single Phase Dual MPPT, STS 3 6kW Series, Grid-connected PV Inverter Single Phase Dual MPPT
Download Center | Home
File Info : application/pdf, 2 Pages, 11.59MB
DocumentDocumentPacking List Inverter×1 Wall Bracket×1 Expansion Bolt×4 3Pin Terminal×1 PV Terminal×2 Monitoring Device × 1 (Optional) AC Terminal×1 Ground Terminal×1 6Pin Terminal×1 User Manual Quick Guide Inspection Report User Manual×1 Quick Guide×1 Inspection Report×1 Figure 1 Packing list Note Export limit & control version 2pcs; RS485 and DRED version 1pcs (This connector is already pre-installed inside the inverter). DRED version only (This connector is already pre-installed inside the inverter). Installation Spacing 500mm 410mm 300mm 300mm Logo 360mm Display 500mm Figure 2 Installation spacing(Single Inverter Figure 3 Front view Bracket Dimensions Use the wall bracket as the template to mark the position of 4 holes on the wall. 220mm 16mm 110mm 10mm 110mm 104mm 150mm Figure 4 Dimensions of wall bracket Figure 5 Mark the holes on the wall Mounting the Inverter Insert the expansion tubes into the holes and tighten them, then fix the bracket onto the wall with expansion screws by using a cross screwdriver. Lift up the inverter with both hands, hang the back rail on the fixed wall bracket carefully. Figure 6 Fix the wall bracket Figure 7 Mounting the inverter DC Connector Assembly Procedure Use a 2.5-4mm² PV cable, strip off the cable sheath for 7mm, insert the stripped head into the metal terminal and use a crimping plier to press it tight, insert the metal terminal into the corresponding PV connector and tighten the nut. + 2.5-4.0mm² Length:7mm _ Figure 8 Strip off the cable sheath Figure 9 Press the metal terminal Figure 10 Tighten the DC connector DC Connector Connection Ground Terminal Connection Figure 11 DC connector connection Insert the positive and negative connectors into the inverter PV connectors respectively. Note:1. Disconnect the AC breaker on the grid side when connecting the PV connectors. 2. The DC switch must be switched to "OFF" position. Figure 12 Ground terminal connection Note:Inverter must be well-grounded for resisting surge voltage shock and improving EMI performance. AC Connector Assembly Insert the stripped end of L/N/PE cable Strip off the AC cable sheath for 50mm, into the AC terminal head. Tighten the and strip off the end of L/N/PE each screws in the terminal with an Allen-key cable for 8mm. to ensure a reliable connection. Wire Diameter10-14mm 8mm 50mm Cable cross-setional area:2.5-4.0mm² Figure 13 Recommended AC cable info Allen-key Figure 14 AC connector assembly AC Connector Connection An AC breaker must be connected on the AC side of the inverter. The recommended AC cable and breaker for Sunways STS 3-6kW series single-phase inverters are shown in the following table: Connect the AC connector to the inverter AC terminal, and the slight"click" represents the connection is in place. Model Copper wire Breaker STS-3KTL 4mm² 20A STS-3.6KTL 4mm² 25A STS-4.2KTL 4mm² 32A STS-4.6KTL 4mm² 32A STS-5KTL 6mm² 40A STS-6KTL 6mm² 40A Note: Check the local standards for more details. Figure 15 AC connector connection Grid Connection Steps 1. Check whether all connectors are correctly connected. 2. Switch the AC breaker on. 3. Turn the DC Switch to "ON" position. 4. The inverter starts self-checking and the screen displays"checking". 5. After self-checking is completed, the inverter will start to generate power. The power indicator will be light up and the real-time power will be displayed on the screen. QUICK INSTALLATION GUIDE STS 3~6kW Series Grid-connected PV Inverter Single Phase Dual MPPT Sunways Technologies Co.,Ltd. S11-00033-00 Monitoring Device Configuration Guide Monitoring Device Installation Insert the module into the COM port at the inverter bottom and pay attention to the direction of the module when assembling (the side with indicator light is facing up). A "click" sound heard represents the assembly is in place. 3. Log in to the "System" interface. Note: Click the"Chinese/English"in the upper right corner to switch the interface language. | English 4. Select "STA setting" and click "Scan". A list of WiFi network will show up. STA Setting Scan Figure 16 Monitoring device installation For first time use, the WiFi module needs to be configured. Following the "WiFi Configuration Guide" below. If the WiFi password has changed. The WiFi dongle will need to be reconfigured. WiFi module configuration guide 1. WiFi module configuration. A. Insert the WiFi module into the COM port at the bottom of the inverter and power on the inverter. B. Using a laptop or Smartphone and turn on the WLAN connection. C. Search for the WiFi name "sunways-WiFi********"(*represents the last 8 numbers of the inverter SN) and click the WiFi name. D. WiFi connection succeeded as shown in Figure 17. Figure 17 2. Open the Website http://10.10.100.254, see the following picture, the username and password are all"admin"and click"Sign in". Figure 18 Figure 21 5. Select the household's WiFi name and click "OK". Note: Only support 2.4GHz WiFi. Figure 22 6. In the pop-up window, click "OK" to key in the WiFi password. OK Figure 23 7. Input the password in the blank and click"Save". Note: Password is case sensitive. OK Figure 24 8. The system will show"Saved Successfully!", click"Restart"to complete the WiFi configuration. Save Restart Figure 25 Figure 26 9. After the reboot, the green indicator on the WiFi module will be always on. Figure 19 admin Sign in Figure 20 Figure 27 GRID-CONNECTED PV INVERTER +61 2 8188 2450 Sunways Technologies Co.,Ltd. Sunways AU Support: Phone: +61 2 8188 2450 Website: www.suntech-power.com.au Email: services@suntech-power.com.au Address: Suite 1203, Level 12, Tower 2, 475 Victoria Avenue, Chatswood, NSW 2067 Australia WeChat SunwaysHome SunwaysPro Sunways LinkedIn Sunways Suntech Australia PC Monitor