待确认FTPLCG-0222-0223-0224-0299-0300-0301-LHHY-V3

[PDF] 10X10 FT HARDTOP GAZEBO

Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement ...

10X10 FT HARDTOP GAZEBO

4 de abr. de 2024 — Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement ...

PDF preview unavailable. Download the PDF instead.

4ee7748f-18af-41f4-b2ee-53f4e5d22a04
ASSEMBLY INSTRUCTIONS 10X10 FT HARDTOP GAZEBO

1. Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement weather. 4. Do not leave up this unit for extended periods of time, as it is not a permanent structure or designed to withstand sustained wind or rain. It is a temporary, portable shelter that shields you from sunlight and rain. The screens also block flying insects. 5. Do not use candles, matches, or any open flames near the tent. 6. To better align the screws for practical situations, do not fully tighten screws initially. 7.Professional installation is highly recommended.

BOX 1

Item no.

Reference Image

Qty.

A

X4

V1

X2

V2

X2

E

X4

E1

X4

F1

X8

G1

X4

G3

X4

G5

X4

G6

X4

1

BOX 1

Item no. Reference Image Qty. Item no. Reference Image Qty.

H

X4 Z

X56

H1

X4 Z1

X24

J

X4

Y

X92

K

X4 1

X144

M6X16mm

K1

X4 2

X56

M6X23mm

N

X12 3

X9

M6X25mm

N1

X4 4

X24

ST4.8X12mm

P

X4 5

X8

M6X10mm

W

X4

6

X4

M6X42mm

W1

X4

7

X24

M6X47mm

W2

X4

8

X16

M6X15mm

W3

X4

9

X12

U

X96 10

X20

M5X12mm

2

BOX 1

BOX 3

Item no. Reference Image Qty. Item no. Reference Image Qty.

11

X1 S

X4

S4

12

X1 Sa

X4

13

X1 Q1

X4

S6

Q2

X4

Q3

X4

BOX 2 Q4

X4

Item no. Reference Image Qty. Q5

X4

B

X4 Q6

X4

B1

X4

T

X4

T1

X4

L

X1

M

X1

3

1

X4

A 4pcs

J 4pcs 1 12pcs

A

1

A

1

1 J

J

4

2
X4 B 4pcs B1 4pcs P 4pcs 1 32pcs
When connecting B and B1 via P, make sure that 1 holes on part P (as shown in the picture) should be facing upwards. Do not install it upside down.

P B1
1
B1
5

B 1
B

3 U 96pcs
B1 B
B1

B B

B1 B
B1

B or B1

x6

x6

6

4 1 16pcs 8 16pcs B B1
B B1
A

B1 B

A B1

B

A

B1

B

AB

8 8A

8 8
7

B1 1

5

H 4pcs H14pcs 1 16pcs

H

H1

H1 H

H1

H

H H1

A

H 1

H1 1

8

6

K 4pcs K1 4pcs

4 24pcs 10 4pcs
K

K1 K1

K

K

K1

K1

K

4 4

K1 10

K
4
9

7
X4 E 4pcs W34pcs 10 8pcs
E 10
W3
E
10

8 L 1pc 1 8pcs E
L E
E

E

E

L

1E

11

9 1 4pcs E

E E

E

E
1 A
12

10
X4 E14pcs

W24pcs 10 8pcs

E1
10
W2
E1

13

11

1 8pcs

E

E1 E E1

E1 E E1
E

L E
E1 1E

E1 1
14

12 M 1pc 3 1pc

M
L 3

15

13 G34pcs N 4pcs 1 8pcs

1

11

G3

E N G3 E1

Do not tighten the screw 1 before completing step 18. It's view from the bottom inside gazebo.

G3 G3

16

14 Q14pcs Q24pcs Q34pcs Q44pcs Q54pcs Q64pcs
X4 S 4pcs Sa4pcs Z 56pcs Z124pcs

Z Z1

Z Z1

Z

Z1 S

Z1

Sa Z

Z1

Q1 Q2 Q3 Q4

Q5

Attach Z and Z1 by lightly tapping with a screwdriver.

Q6

Z Z Z1

Z
or

Z or Z1

Z1

17

15

S Sa

Sa S

Sa
E

Sa S
18

16 G14pcs N 4pcs 1 8pcs

G1

G1

G1

G1

N

E

1

G1

E1

1

G1 G1
G1 G1

19

17 F1 8pcs W 4pcs W14pcs 1 24pcs

W

F1

F1

F1

F1

F1

F1 E

1

W1
F1 1

E1 F1

F1 F1 F1
F1
20

F1 F1 F1
F1

18 V1 4pcs

V2 4pcs 5 8pcs

V1 5

The marked parts use the same screws as in step 13.
V2 1

E1 1 E N

5

E1

It's view from the bottom inside gazebo. 21

19
Q1 Q2 Q3
Q4 Q5 Q6

Q1 Q2 Q3

Q4 Q5 Q6

22

20

Q1 Q2 Q3
Y Y
F1

Q4 Q5 Q6

Y

E1

D

F1

D1
23

21 Y 92pcs

2 56pcs 3 8pcs

6 4pcs 7 24pcs

3

1

3

1

2

2

4

4

33

2 4

2 4

Notes:

1. When installing the ceiling, fix the screws on

the central beam first to prevent the iron sheet

from falling and causing injury.

2. Do not fully secure the screw until all screws

are properly in position.

3. Two persons are needed when installing

Part Y. One should secure Part Y's position

from inside the gazebo, while the other inserts

screws into Part Y from outside the gazebo.

6

3

7

2

Y

Y

Y

Y

1

2

3

4

24

22 G5 4pcs G6 4pcs N 4pcs N14pcs 1 8pcs

G6

N1

G5

1

G6

G5

G6

G5

G6

G5

N

A

G6

G5

1

G5 G6
25

23 T 4pcs
The other part has 6 holes hanging on Part B.
One part of the curtain has 6 holes hanging on Part B1.

The other part has 6 holes hanging on Part B1.

One part of the curtain has 6 holes hanging on Part B.

One part of the curtain has 6 holes hanging on Part B1.

One part of the curtain has 6 holes hanging on Part B.

The other part has 6 holes hanging on Part B1.

The other part has 6 holes hanging on Part B.

26

24

T T
U
Pay attention to the sidewall curtain's installation position.
27

T
T
U T

25 T14pcs

The other part has 6 holes hanging on Part B.
One part of the netting has 6 holes hanging on Part B1.

The other part has 6 holes hanging on Part B1.

One part of the netting has 6 holes hanging on Part B.

One part of the netting has 6 holes hanging on Part B1.

One part of the netting has 6 holes hanging on Part B.

The other part has 6 holes hanging on Part B1.

The other part has 6 holes hanging on Part B.

28

26

T1
U
Pay attention to the sidewall netting's installation position.

T1

2

3

1

Note: Attach 1 to 2 to secure parts T1 and T (curtains) together. Attach 1 to 3 to secure the back curtain (T). Attach 1 to 3 to secure the front netting (T1).

U T1

Hang the hook attached to the netting on Part A.
29

27 9 12pcs

A J

To improve wind resistance,

9

9

be sure to complete this installation

step. If expansion screws or ground

nails are not installed,strong winds

may topple the gazebo.

Expansion screws are essential for

stability on cement surfaces, and

ground nails are for grassy surfaces.

All are included in the accessories

package.

30

A J


Adobe PDF library 15.00 Adobe Illustrator 24.0 (Windows)