Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement ...
4 de abr. de 2024 — Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement ...
ASSEMBLY INSTRUCTIONS 10X10 FT HARDTOP GAZEBO 1. Two or more people are required for assembly. 2. A ladder and electric drill may be necessary. 3. Do not erect the structure in heavy winds or inclement weather. 4. Do not leave up this unit for extended periods of time, as it is not a permanent structure or designed to withstand sustained wind or rain. It is a temporary, portable shelter that shields you from sunlight and rain. The screens also block flying insects. 5. Do not use candles, matches, or any open flames near the tent. 6. To better align the screws for practical situations, do not fully tighten screws initially. 7.Professional installation is highly recommended. BOX 1 Item no. Reference Image Qty. A X4 V1 X2 V2 X2 E X4 E1 X4 F1 X8 G1 X4 G3 X4 G5 X4 G6 X4 1 BOX 1 Item no. Reference Image Qty. Item no. Reference Image Qty. H X4 Z X56 H1 X4 Z1 X24 J X4 Y X92 K X4 1 X144 M6X16mm K1 X4 2 X56 M6X23mm N X12 3 X9 M6X25mm N1 X4 4 X24 ST4.8X12mm P X4 5 X8 M6X10mm W X4 6 X4 M6X42mm W1 X4 7 X24 M6X47mm W2 X4 8 X16 M6X15mm W3 X4 9 X12 U X96 10 X20 M5X12mm 2 BOX 1 BOX 3 Item no. Reference Image Qty. Item no. Reference Image Qty. 11 X1 S X4 S4 12 X1 Sa X4 13 X1 Q1 X4 S6 Q2 X4 Q3 X4 BOX 2 Q4 X4 Item no. Reference Image Qty. Q5 X4 B X4 Q6 X4 B1 X4 T X4 T1 X4 L X1 M X1 3 1 X4 A 4pcs J 4pcs 1 12pcs A 1 A 1 1 J J 4 2 X4 B 4pcs B1 4pcs P 4pcs 1 32pcs When connecting B and B1 via P, make sure that 1 holes on part P (as shown in the picture) should be facing upwards. Do not install it upside down. P B1 1 B1 5 B 1 B 3 U 96pcs B1 B B1 B B B1 B B1 B or B1 x6 x6 6 4 1 16pcs 8 16pcs B B1 B B1 A B1 B A B1 B A B1 B AB 8 8A 8 8 7 B1 1 5 H 4pcs H14pcs 1 16pcs H H1 H1 H H1 H H H1 A H 1 H1 1 8 6 K 4pcs K1 4pcs 4 24pcs 10 4pcs K K1 K1 K K K1 K1 K 4 4 K1 10 K 4 9 7 X4 E 4pcs W34pcs 10 8pcs E 10 W3 E 10 8 L 1pc 1 8pcs E L E E E E L 1E 11 9 1 4pcs E E E E E 1 A 12 10 X4 E14pcs W24pcs 10 8pcs E1 10 W2 E1 13 11 1 8pcs E E1 E E1 E1 E E1 E L E E1 1E E1 1 14 12 M 1pc 3 1pc M L 3 15 13 G34pcs N 4pcs 1 8pcs 1 11 G3 E N G3 E1 Do not tighten the screw 1 before completing step 18. It's view from the bottom inside gazebo. G3 G3 16 14 Q14pcs Q24pcs Q34pcs Q44pcs Q54pcs Q64pcs X4 S 4pcs Sa4pcs Z 56pcs Z124pcs Z Z1 Z Z1 Z Z1 S Z1 Sa Z Z1 Q1 Q2 Q3 Q4 Q5 Attach Z and Z1 by lightly tapping with a screwdriver. Q6 Z Z Z1 Z or Z or Z1 Z1 17 15 S Sa Sa S Sa E Sa S 18 16 G14pcs N 4pcs 1 8pcs G1 G1 G1 G1 N E 1 G1 E1 1 G1 G1 G1 G1 19 17 F1 8pcs W 4pcs W14pcs 1 24pcs W F1 F1 F1 F1 F1 F1 E 1 W1 F1 1 E1 F1 F1 F1 F1 F1 20 F1 F1 F1 F1 18 V1 4pcs V2 4pcs 5 8pcs V1 5 The marked parts use the same screws as in step 13. V2 1 E1 1 E N 5 E1 It's view from the bottom inside gazebo. 21 19 Q1 Q2 Q3 Q4 Q5 Q6 Q1 Q2 Q3 Q4 Q5 Q6 22 20 Q1 Q2 Q3 Y Y F1 Q4 Q5 Q6 Y E1 D F1 D1 23 21 Y 92pcs 2 56pcs 3 8pcs 6 4pcs 7 24pcs 3 1 3 1 2 2 4 4 33 2 4 2 4 Notes: 1. When installing the ceiling, fix the screws on the central beam first to prevent the iron sheet from falling and causing injury. 2. Do not fully secure the screw until all screws are properly in position. 3. Two persons are needed when installing Part Y. One should secure Part Y's position from inside the gazebo, while the other inserts screws into Part Y from outside the gazebo. 6 3 7 2 Y Y Y Y 1 2 3 4 24 22 G5 4pcs G6 4pcs N 4pcs N14pcs 1 8pcs G6 N1 G5 1 G6 G5 G6 G5 G6 G5 N A G6 G5 1 G5 G6 25 23 T 4pcs The other part has 6 holes hanging on Part B. One part of the curtain has 6 holes hanging on Part B1. The other part has 6 holes hanging on Part B1. One part of the curtain has 6 holes hanging on Part B. One part of the curtain has 6 holes hanging on Part B1. One part of the curtain has 6 holes hanging on Part B. The other part has 6 holes hanging on Part B1. The other part has 6 holes hanging on Part B. 26 24 T T U Pay attention to the sidewall curtain's installation position. 27 T T U T 25 T14pcs The other part has 6 holes hanging on Part B. One part of the netting has 6 holes hanging on Part B1. The other part has 6 holes hanging on Part B1. One part of the netting has 6 holes hanging on Part B. One part of the netting has 6 holes hanging on Part B1. One part of the netting has 6 holes hanging on Part B. The other part has 6 holes hanging on Part B1. The other part has 6 holes hanging on Part B. 28 26 T1 U Pay attention to the sidewall netting's installation position. T1 2 3 1 Note: Attach 1 to 2 to secure parts T1 and T (curtains) together. Attach 1 to 3 to secure the back curtain (T). Attach 1 to 3 to secure the front netting (T1). U T1 Hang the hook attached to the netting on Part A. 29 27 9 12pcs A J To improve wind resistance, 9 9 be sure to complete this installation step. If expansion screws or ground nails are not installed,strong winds may topple the gazebo. Expansion screws are essential for stability on cement surfaces, and ground nails are for grassy surfaces. All are included in the accessories package. 30 A JAdobe PDF library 15.00 Adobe Illustrator 24.0 (Windows)