MWJG-7 Assembly Manual
Product: 1 Large Drawer Wood Filing Cabinet
Model: MWJG-7
⏰ Approximate Assembly Time: 120 Minutes
??? Assembly Requirement: 2 Persons Recommended
? Number of Packages: 1
? Required Assembly Space: 1M x 2M (2 M²)
Maintenance & Tools
Maintenance Skills
- Use a clean and soft cloth to remove dust regularly; do not use solvents.
- If in a humid environment for a long time, ventilate and exhaust moisture to avoid furniture damage.
- Keep away from high temperature sources (stoves, radiators) to prevent deforming.
Tools Needed:
? Crosshead Screwdriver
? Hammer
(Both not included in package)
Important Notes & Warnings
⚠️ WARNING: Keep all parts out of the children's reach.
- You need to have a crosshead screwdriver and hammer beforehand.
- Place all panels on a clean and smooth surface, such as a rug or carpet, to prevent scratching.
- Make sure that all parts in your product package match those listed in the Panels & Accessories list.
- Do not tighten screws or bolts until all pieces are fitted.
- It is recommended to have 2 persons to complete the assembly.
Contact Us
If you have any issue regarding the product, please contact us at: pananaus@163.com
Please read this manual carefully before any operation and keep it properly for future use.
[Diagram: Hands holding an object carefully] Handle with care, protective layer is required.
[Diagram: People carrying a box] Safe carriage, multi-people are needed.
[Diagram: Question mark] In case of any doubts, contact Panana.
Panel List
Please check the Panel List first.
Number | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Quantity | 1 | 1 | 1 | 1 | 1 | 1 | 2 | 1 | 1 | 1 | 1 | 1 |
Number | 13 | 14 | 15 |
---|---|---|---|
Quantity | 1 | 1 | 1 |
Accessories List
Please check the Accessories List.
NO. | Hardware List | QTY | NO. | Hardware List | QTY | NO. | Hardware List | QTY |
---|---|---|---|---|---|---|---|---|
A | Cam Screws | 23 | D | Wood Dowel Pins | 10 | G | File Lever | 4 |
B | Cam Lock Nuts | 18 | E | Small Screw E | 12 | H | Small Screw H | 5 |
C | Mini Cam Lock Nuts | 5 | F(A)L / F(A)R | 3-Section Ball Bearing Drawer Slide Rail Kit | 1 | I | Back plate nail | 14 |
F(B)L / F(B)R | ||||||||
J | Three-in-one Connector Cover | 23 | M | Handle Kit | 2 | |||
K | Anti rollover parts | 2 | L | Shelf Support Nails | 4 |
Note: The accessories list is classified by the smallest packaging unit, and the kit accessories represent the matching accessories and are packed in a separate package. In order to facilitate installation, the panel has pre-drilled positioning holes for the accessories. When installing, only need to match the mounting holes of the accessories with the pre-drilled holes on the panel and lock them with the matching screws. For details, see the relevant installation instructions.
Handle Kits: M1, M2
Assembly Instructions
IMPORTANT PRECAUTIONS
Use Accessory "F"
3-Section Ball Bearing Drawer Slide Rail Kit:
Before installing the drawer slide rail, F must be split into two parts, F(A) and F(B). F(A) is fixed on the side panel of the cabinet, and F(B) is fixed to the bottom of the drawer side panel.
[Diagram: Drawer slide rail parts F(A) and F(B) being separated by pressing and pulling.]
Step 1: Press the plastic part and pull out F(B) to separate the drawer slides.
Step 2: Grip the F(A) part while sliding the F(B) part.
Installation Note: F(A)L/R is fixed on the side panel of the cabinet. F(B)L/R is fixed to the bottom of the drawer side panel. The same method is used for the left and right slide rails.
Diagram Description: Shows how to split the drawer slide rail (F) into F(A) and F(B). F(A) attaches to the cabinet side panel, and F(B) attaches to the drawer side panel. The diagram illustrates pressing a release tab and sliding the parts apart. It also shows the normal status of the assembled slide.
IMPORTANT PRECAUTIONS
Use Accessory "A", "B"/"C", "D"
B for cabinet body, C(mini) for drawer.
Cam Screws (A): Screw accessories "A" vertically into the pre-drilled hole in the panel by hand as shown in the figure.
Wood Dowel Pins (D): Insert D into pre-drilled holes.
Cam Lock Nuts (B or C): Insert B or C into larger holes and turn to lock.
Note: Ensure there is no gap between the panels. Turn cam lock nuts right until tight.
Diagram Description: Illustrates the use of Cam Screws (A) inserted into panels, Wood Dowel Pins (D) inserted into panels, and Cam Lock Nuts (B or C) used to secure panels together. It emphasizes turning the cam lock nuts until tight and ensuring no gaps.
STEP 1 Panel ②, ③ Installation (a)
Attach drawer slide rails F(A)L/R and screws E to panels ② and ③. Pull out the inner part of the slide rail until it stops to reveal all mounting holes.
Diagram Description: Shows panels ② and ③ with drawer slide rails F(A)L/R and screws E being attached. An arrow indicates pulling out a section of the slide rail to access mounting holes.
STEP 1 Panel ②, ③ Installation (b)
Detailed view of pre-drilled holes on panels ② and ③ matching the mounting holes of F(A).
Dimensions: Unit: mm (1in=1mm/25.4)
Parts Used: F(A) 1x(Kit), E 6x
Diagram Description: Shows panels ② and ③ with specific measurements and pre-drilled hole locations. It highlights that the pre-drilled holes match the F(A) mounting holes.
STEP 1 Panel ②, ③ Installation (c)
Using accessories A (Cam Screws, 10x) and D (Wood Dowel Pins, 4x) to connect panels ② and ③.
Note: The direction is relative to the installed state.
Diagram Description: Illustrates the use of Cam Screws (A) and Wood Dowel Pins (D) to join panels ② and ③. Arrows indicate insertion points and orientation.
STEP 2 Panel ①, ⑤ Installation
Using accessory A (Cam Screws, 8x) to connect panels ① and ⑤.
Note: The direction is relative to the installed state.
Diagram Description: Shows panels ① and ⑤ being joined using Cam Screws (A). Arrows indicate the connection points and orientation.
STEP 3 Panel ⑦, ⑧ Installation
Using accessory D (Wood Dowel Pins, 6x) to connect panels ⑦ and ⑧.
Diagram Description: Illustrates panels ⑦ and ⑧ being joined using Wood Dowel Pins (D).
STEP 4 Panel ④, ⑤ Assembly
Using accessory B (Cam Lock Nuts, 2x) to connect panels ④ and ⑤.
Note: The direction is relative to the installed state. Turn cam lock nuts right until tight. Ensure there is no gap between the panels.
Diagram Description: Shows panels ④ and ⑤ being joined using Cam Lock Nuts (B). An illustration demonstrates tightening the cam lock nut with a screwdriver.
STEP 5 Cabinet-body Assembly (a)
Connecting panels ②, ③, ④, ⑤, ⑦, ⑧ using accessory B (Cam Lock Nuts, 10x).
Note: The direction is relative to the installed state.
Diagram Description: Shows the assembly of the cabinet body by connecting various panels using Cam Lock Nuts (B). Arrows indicate connection points and orientation.
STEP 5 Cabinet-body Assembly (b)
Continuing the cabinet body assembly, connecting panels ①, ②, ③, ④, ⑤, ⑦ using accessory B (Cam Lock Nuts, 6x).
Note: In order to explain clearly, this step is divided into 2 steps. In fact, these 2 steps can be carried out at the same time. The direction is relative to the installed state. Turn cam lock nuts right until tight.
Diagram Description: Shows further assembly of the cabinet body, connecting more panels with Cam Lock Nuts (B). It illustrates multiple connection points and the sequence of assembly.
STEP 6 Check whether the cabinet is installed normally
Verify that all corners are at ? 90° angles to ensure the cabinet is installed correctly and square.
Diagram Description: An exploded view of the cabinet structure with lines indicating 90-degree angles at all corners, emphasizing squareness.
STEP 7 The panel ⑮ installation
The panel ⑮ (back panel) plays a great role in the stability of the whole cabinet. If panel ⑮ is not in the state indicated by "Picture 1" after ordering, please remove the back panel and adjust it before ordering panel ⑮, otherwise it will affect the alignment of the panel and the smoothness of the drawer opening.
Hardware Used: I (Back plate nail), 14x
Diagram Description: Shows the back panel (15) being attached to the cabinet using back plate nails (I). It includes a detail showing the correct alignment of the back panel.
STEP 8 Lower drawer installation
Assemble the lower drawer components using accessories A (Cam Screws, 5x), C (Mini Cam Lock Nuts, 5x), E (Small Screw E, 6x), F(B) (Drawer Slide Rail part, 1x), H (Small Screw H, 5x), M1 (Handle Screw), M2 (Handle Screw), and Handle Kit (2x).
Steps:
Step 1: Attach components using A, C, M1, M2.
Step 2: Attach components using H, M2.
Step 3: Attach F(B) to the drawer side panel using E. Pre-drilled holes are for accessory positioning.
Diagram Description: Illustrates the step-by-step assembly of the drawer box. It shows how to connect drawer sides, bottom, and front using various screws, cam locks, and drawer slides. It also shows handle attachment.
STEP 9 Lower drawer assembly
Insert the assembled lower drawer into the cabinet. Use accessory J (Three-in-one Connector Cover, 32x) if applicable for drawer slides.
Diagram Description: Shows the assembled drawer being slid into the cabinet. An inset shows how the drawer slides engage with the cabinet runners.
STEP 10 Remove the lower drawer
Instructions on how to remove the lower drawer from the cabinet, likely by disengaging the drawer slides.
Diagram Description: Shows the drawer partially removed, with arrows indicating how to disengage the drawer slides to fully remove it.
STEP 11 Panel "G" assembly
Assemble Panel "G" (4x), likely a decorative or functional piece for the drawer front or cabinet.
Instructions: First open the drawer, then insert the "G" part in order and put it down.
Diagram Description: Shows Panel "G" being attached to the drawer front. It involves opening the drawer and then fitting the panel.
STEP 12 Panel "K" assembly
Install anti-rollover parts (K, 2x). This involves fixing accessories to the wall and the side panel.
Step 1: Set the hole position near the wall.
Step 2: Put the embedded part into the hole.
Step 3: Fix the accessories on the wall and side panel respectively.
After: Confirm the cabinet and lock the tie.
Diagram Description: Illustrates the installation of an anti-tip safety strap. It shows marking the wall, drilling, inserting wall anchors, and securing the strap to the cabinet and the wall.
STEP 13 Active shelf assembly (a)
Install adjustable shelf supports (L, 4x) and shelf (6).
Step 1: Select the desired height and put it in L.
Step 2: Aim the board gaps down L.
Diagram Description: Shows how to insert shelf support pins (L) into the pre-drilled holes inside the cabinet at the desired height, and then placing the shelf (6) onto the pins.
STEP 14 Active shelf assembly (b)
You can adjust the position of parts (shelves) according to your choice.
WARNING: ⚠️ IMPORTANT: Tipping can injure young children.
Diagram Description: Shows the cabinet with the adjustable shelf placed in different positions (left or right side). It reiterates the warning about tipping.