EHD DROP STEP
Part #: TAC-EHD-T08
Fits: 2005-2023 Toyota Tacoma Double Cab Estimated Install Time: 60-120 minutes Requirements: Cutting Not Required, Drilling Not Required Verify all parts are present before starting installation. Diagram Description: The diagram illustrates the components, showing the front of the vehicle indicated by an arrow (⬆️). It labels the "L" marking for the Left/Driver Side and "R" marking for the Right/Passenger Side. The parts list includes front and center/rear mounting brackets for both sides, and the running boards themselves. REMOVE CONTENTS FROM BOX. VERIFY ALL PARTS ARE PRESENT. READ INSTRUCTIONS CAREFULLY BEFORE STARTING INSTALLATION. ASSISTANCE IS RECOMMENDED. Starting on the Driver/Left front of the vehicle, remove the plastic plugs or factory hex bolts (if equipped) covering the threaded holes in the body panel. Diagram Description (Fig 1): Illustrates the driver/left front of the vehicle's body panel, highlighting the threaded holes covered by plastic plugs or hex bolts that need to be removed. Select the Driver/Left Front Mounting Bracket. Attach the bracket to the vehicle's front mounting location using (2) 8mm Hex Bolts, (2) 8mm Lock Washers, and (2) 8mm Flat Washers. Do not tighten hardware at this time. Diagram Description (Fig 2): Shows the Driver/Left Front Mounting Bracket being secured to the vehicle's front mounting point with the specified hardware (8mm Hex Bolts, Lock Washers, Flat Washers). Move along the body panel to the center and rear mounting locations. Select the remaining (2) Driver/Left Center/Rear Mounting Brackets. Repeat Step 2 to install these brackets on the center and rear mounting locations. Do not tighten hardware. Diagram Description (Figs 3 & 4): Depicts the driver/left center and rear mounting locations on the vehicle body panel where the center/rear brackets are to be attached. Select the Driver/Left Running Board. NOTE: The Driver/Left Running Board will have a "L" marking beneath the step. Carefully place the Running Board onto the installed brackets. IMPORTANT: Do not slide the Running Board front to back, as this may damage the finish. Attach the Running Board to the (3) Mounting Brackets using (6) 8mm Combo Bolts. Do not tighten hardware. Diagram Description (Figs 5 & 6): Shows the Driver/Left Running Board being positioned on the brackets and then secured with (6) 8mm Combo Bolts. Fig 5 shows bracket attachment, Fig 6 shows running board attachment. Level and adjust the Running Board, then fully tighten all hardware. Repeat Steps 1–5 to attach the Passenger/Right Running Board. Ensure the board is marked with "R" for the right side. Do periodic inspections of the installation to ensure that all hardware remains secure and tight. To protect your investment, do not use any type of polish or wax that may contain abrasives that could damage the finish. Mild soap may be used to clean the Running Boards.Installation Overview
Torque & Tools
Fastener Size Tightening Torque (ft-lbs) Wrench Required Allen Wrench Required 6mm 7-8.5 10mm 4mm 8mm 18-20 13mm 5mm 10mm 35-40 16mm 6mm 12mm 60-70 18mm 8mm Parts List
Before Installation
Installation Steps
Step 1: Prepare Front Mounting Location
Step 2: Attach Driver/Left Front Mounting Bracket
Step 3: Attach Driver/Left Center and Rear Mounting Brackets
Step 4: Attach Driver/Left Running Board
Step 5: Tighten Hardware
Step 6: Install Passenger/Right Running Board
Step 7: Final Inspection
Attention