Installation
Geberit
Step 1: Mounting the Frame
This section illustrates the initial steps for installing the Geberit sanitary system. It shows the components being attached to the wall, including the mounting plate and the initial pipe connections. The diagram indicates the use of screws and a connecting piece (labeled 1 and 2) to secure the frame to the wall and prepare for the toilet bowl attachment.
Diagram Description:
- A mounting plate is shown being fixed to a tiled wall.
- A circular component (labeled 1) is inserted into the plate.
- A pipe fitting (labeled 2) is attached to the plate, with another fitting (labeled 2) connected to it.
- A toilet bowl is depicted in the background, suggesting the eventual placement.
Step 2: Connecting the Toilet Bowl
This part of the installation focuses on connecting the toilet bowl to the prepared sanitary system. It shows how the toilet bowl is positioned and secured to the mounting frame.
Diagram Description:
- A toilet bowl is shown being positioned against the wall.
- A lever or handle mechanism (labeled 3) is being attached to the front of the toilet bowl.
- A mounting bracket or support is shown extending from the wall to hold the toilet bowl.
Step 3: Final Adjustments and Leveling
The final steps involve ensuring the toilet bowl is correctly positioned and leveled. This section shows the toilet bowl in its final mounted position.
Diagram Description:
- The toilet bowl is shown fully installed and mounted on the wall.
- A spirit level is placed on top of the toilet bowl to ensure it is horizontal.
- Additional mounting hardware (labeled 3) is shown in an inset, indicating final securing points.
- Labels 'A' point to the mounting points of the toilet bowl to the frame.
Manufacturer Information
Geberit International AG
Schachenstrasse 77
CH-8645 Jona
Switzerland
Website: www.geberit.com
Email: dokumentation@geberit.com
Document Reference: D15734-001&BDC 11-2006
Page 1 of 1