User Guide for AVIGILON models including: OP-16EM Elevator Board, OP-16EM, Elevator Board, Board
Product documentation
File Info : application/pdf, 2 Pages, 15.38MB
DocumentDocumentElevator Board Quick Start Guide OP-16EM What's Included Elevator Board Mounting standoffs Screws and washers Overview Power cable USB cable Board Status LED Solid green Solid red Connected and communicating with the Avigilon Access Control Core board. Connection error. Try the following: l Power cycle the Elevator Board. l Unplug and replug the USB cable. l Restart the device in the Avigilon Alta Control Center. 1 Power input 2 Reader Power LEDs 3 USB port 4 Board Status LED 5 Board Power LED 6 ADMIN button 7 Relay LEDs 1 - 16 8 Inputs 1 - 16 9 RESET button 10 Board ID LED 11 OVERRIDE SWITCH terminals (future use) 1 - Installing 1. Screw the included standoffs into the holes labeled '1' on the back of the Elevator Board mounting plate. 2. Fasten the board to an enclosure by inserting the included mounting screws and washers into the back of the enclosure, and then screwing them into the standoffs. 3. Connect the Elevator Board to the Access Control Core using the included USB cable. 4. Connect the Elevator Board to the power supply using the included power cable. Warning: Do not apply power during wiring. Ensure the power supply is unplugged until all wiring is complete. 5. Apply power to the power supply. Example: North American power cord and outlet 2 - Connecting Readers and Elevator Buttons 3 - Connecting Inputs Certifications CE, IC, FCC, MET, RCM, UL294, WEEE For More Information Scan the following QR codes: OP-16EM Video Library 1. For each elevator floor, connect one of the signal wires from an elevator button to one of the relay ports. 2. Wire the relays to an elevator controller with the corresponding NO or NC contact. Note: The total output rating is 60VDC maximum, 1A @ 24VDC (resistive), 0.5A @ 125VAC (resistive). General purpose inputs require a voltage between 3V and 24V. 4 - Provisioning Sign in to Alta Control Center, and follow the steps to add and configure the Elevator Board. control.openpath.com/login control.eu.openpath.com/login QuickStartGuide-OP-16EM-Rev3 © 2024, Avigilon Corporation. All rights reserved. AVIGILON and the AVIGILON logos are trademarks or registered trademarks of Avigilon Corporation. All other trademarks are the property of their respective owners. Unless stated explicitly and in writing, no license is granted with respect to any copyright, industrial design, trademark, patent or other intellectual property rights of Avigilon Corporation or its licensors.