Assembly Instruction
This document provides detailed instructions for assembling your Latitude Run Makeup Vanity.
Product Overview
The main illustration on the first page depicts a fully assembled makeup vanity. It features a large mirror surrounded by light bulbs, a spacious tabletop with compartments, multiple drawers on the sides, and an accompanying stool. The overall design suggests a functional and stylish dressing table.
Parts List
The following parts are included in the package:
- Part 1: Mirror Panel (1148x649x15 mm) - Quantity: 1
- Part 2: Top Shelf (1028x248x6 mm) - Quantity: 1
- Part 3: Drawer Front Panel (1149x399x15 mm) - Quantity: 1
- Part 4: Drawer Side Panel (734x386x15 mm) - Quantity: 1
- Part 5: Drawer Side Panel (295x149x15 mm) - Quantity: 1
- Part 6: Drawer Side Panel (295x385x15 mm) - Quantity: 2
- Part 7: Drawer Bottom Panel (302x498 mm) - Quantity: 2
- Part 8: Drawer Back Panel (295x79x15 mm) - Quantity: 2
- Part 9: Drawer Bottom Panel (295x79x15 mm) - Quantity: 2
- Part 10: Drawer Base Panel (734x386x15 mm) - Quantity: 1
- Part 11: Drawer Side Panel (505x156 mm) - Quantity: 1
- Part 12: Drawer Side Panel (498x385x15 mm) - Quantity: 1
- Part 13: Drawer Base Panel (734x386x15 mm) - Quantity: 1
- Part 14: Drawer Front Panel (295x149x15 mm) - Quantity: 1
- Part 15: Drawer Base Panel (734x386x15 mm) - Quantity: 1
- Part 16: Drawer Side Panel (298x119x12 mm) - Quantity: 3
- Part 17: Drawer Side Panel (298x119x12 mm) - Quantity: 3
- Part 18: Drawer Side Panel (246x119x12 mm) - Quantity: 8
- Part 19: Drawer Bottom Panel (253x292 mm) - Quantity: 2
- Part 20: Drawer Side Panel (324x160x12 mm) - Quantity: 8
- Part 21: Drawer Front Panel (449x119x12 mm) - Quantity: 1
- Part 22: Drawer Bottom Panel (456x292 mm) - Quantity: 1
- Part 23: Drawer Front Panel (492x160x12 mm) - Quantity: 1
- Part 24: Drawer Side Panel (348x119x12 mm) - Quantity: 6
- Part 25: Drawer Side Panel (348x119x12 mm) - Quantity: 6
- Part 26: Drawer Bottom Panel (253x342 mm) - Quantity: 6
- Part 27: Drawer Front Panel (398x297x40 mm) - Quantity: 1
- Part 28: Drawer Base Panel (398x296x15 mm) - Quantity: 2
- Part 29: Drawer Side Panel (367x115x15 mm) - Quantity: 2
Hardware List
The following hardware is provided for assembly:
- Hardware A: Screw (6x35mm) - Quantity: 84+6
- Hardware B: Screw (15x10mm) - Quantity: 84+6
- Hardware C: Screw (6x30mm) - Quantity: 15+2
- Hardware D: Screw (4x35mm) - Quantity: 36+4
- Hardware E: Screw (3x12mm) - Quantity: 110+11
- Hardware F: Screw (4x12mm) - Quantity: 8+1
- Hardware G: Screw (5x40mm) - Quantity: 12+1
- Hardware H: Screw (4x16mm) - Quantity: 9
- Hardware H-1, H-2: Components of Hardware H
- Hardware I: Screw (6x50mm) - Quantity: 4
- Hardware J: Screw (3x12mm) - Quantity: 12+2
- Hardware K: Small Part - Quantity: 1
- Hardware L: Small Part - Quantity: 16+2
- Hardware M: Small Part - Quantity: 4
- Hardware N, N-1, N-2: Components - Quantity: 12+2
- Hardware O, O-1, O-2, O-3: Components - Quantity: 2
- Hardware P: Screw (4x45mm) - Quantity: 2
- Hardware Q: Round Component (21mm) - Quantity: 24
- Hardware R: Ring Component - Quantity: 12
- Hardware S: Chain/Wire Component - Quantity: 1
- Hardware T: Screw (3.5x16mm) - Quantity: 16+1
- Hardware U: Connector Component - Quantity: 2
- Drawer Slides CL: Length L300 - Quantity: (See steps)
- Drawer Slides CR: Length L350 - Quantity: (See steps)
- Drawer Slides DL: Length L350 - Quantity: (See steps)
- Drawer Slides DR: Length L380 - Quantity: (See steps)
Assembly Steps
Step 1: Prepare Drawer Sides
Prepare two sets of drawer side panels (Part 6). Attach drawer slides to the inner and outer sides of each Part 6 panel.
The diagram shows two Part 6 panels. On the inner side, a CL drawer slide (L300) is attached using screws A (total 23) and E (total 12). On the outer side, a CR drawer slide (L350) is attached using screws CL (total 1) and CR (total 3). This process is repeated for both Part 6 panels.
Components Used: Part 6 (x2), Drawer Slides CL (L300), Drawer Slides CR (L350), Hardware A (x23), Hardware E (x12), Hardware CL (x1), Hardware CR (x3).
Step 2: Assemble Drawer Box 1
Assemble the first drawer box using Part 3 (drawer front) and Part 4 (drawer side).
The diagram shows Part 3 being attached to Part 4. Drawer slides (CL, L300) are attached to the sides of the assembled drawer box using screws A (total 9) and E (total 15). The drawer box is then rotated 180 degrees.
Components Used: Part 3, Part 4, Drawer Slides CL (L300), Hardware A (x9), Hardware E (x15).
Step 3: Assemble Drawer Box 2
Assemble the second drawer box using Part 13 (drawer base) and Part 4 (drawer side).
The diagram shows Part 13 being attached to Part 4. Drawer slides (CL, L300) are attached to the sides of the assembled drawer box using screws A (total 9) and E (total 15). The drawer box is then rotated 180 degrees.
Components Used: Part 13, Part 4, Drawer Slides CL (L300), Hardware A (x9), Hardware E (x15).
Step 4: Assemble Drawer Box 3
Assemble the third drawer box using Part 23 (drawer front) and Part 20 (drawer side).
The diagram shows Part 23 being attached to Part 20. Drawer slides (CR, L350) are attached to the sides of the assembled drawer box using screws A (total 43), H (x12), H-1 (x9), CR (x1), and L350 (x3). This assembly is repeated 8 times (indicated by 'x8' next to Part 20).
Components Used: Part 23, Part 20 (x8), Drawer Slides CR (L350), Hardware A (x43), Hardware H (x12), Hardware H-1 (x9), Hardware CR (x1), Hardware L350 (x3).
Step 5: Assemble Drawer Box 4
Assemble the fourth drawer box using Part 18 (drawer side) and Part 17 (drawer side).
The diagram shows two Part 17 panels being joined by Part 18. Drawer slides (DR, L300) are attached to the sides of the assembled drawer box using screws D (total 8). This assembly is repeated 2 times (indicated by 'x2' next to Part 17).
Components Used: Part 17 (x2), Part 18, Drawer Slides DR (L300), Hardware D (x8).
Step 6: Assemble Drawer Box 5
Assemble the fifth drawer box using Part 20 (drawer side) and Part 26 (drawer bottom).
The diagram shows Part 20 being attached to Part 26. Drawer slides (DL, L300) are attached to the sides of the assembled drawer box using screws B (total 8) and E (total 12). Drawer slides (DR, L300) are also attached using screws B (total 8) and E (total 12). This assembly is repeated 2 times (indicated by 'x2' next to Part 20).
Components Used: Part 20 (x2), Part 26, Drawer Slides DL (L300), Drawer Slides DR (L300), Hardware B (x8), Hardware E (x12).
Step 7: Assemble Drawer Box 6
Assemble the sixth drawer box using Part 17 (drawer side) and Part 21 (drawer front).
The diagram shows Part 17 being attached to Part 21. Drawer slides (DR, L300) are attached to the sides of the assembled drawer box using screws D (total 4). This assembly is repeated 4 times (indicated by 'x4' next to Part 17).
Components Used: Part 17 (x4), Part 21, Drawer Slides DR (L300), Hardware D (x4).
Step 8: Assemble Drawer Box 7
Assemble the seventh drawer box using Part 23 (drawer front) and Part 23 (drawer front).
The diagram shows Part 23 being attached to Part 23. Drawer slides (DL, L300) are attached to the sides of the assembled drawer box using screws B (total 4) and E (total 6). Drawer slides (DR, L300) are also attached using screws B (total 4) and E (total 6). This assembly is repeated 1 time (indicated by 'x1' next to Part 23).
Components Used: Part 23 (x1), Drawer Slides DL (L300), Drawer Slides DR (L300), Hardware B (x4), Hardware E (x6).
Step 9: Assemble Drawer Box 8
Assemble the eighth drawer box using Part 18 (drawer side) and Part 25 (drawer side).
The diagram shows two Part 25 panels being joined by Part 18. Drawer slides (DR, L350) are attached to the sides of the assembled drawer box using screws D (total 24). This assembly is repeated 6 times (indicated by 'x6' next to Part 25).
Components Used: Part 25 (x6), Part 18, Drawer Slides DR (L350), Hardware D (x24).
Step 10: Assemble Drawer Box 9
Assemble the ninth drawer box using Part 20 (drawer side) and Part 26 (drawer bottom).
The diagram shows Part 20 being attached to Part 26. Drawer slides (DL, L350) are attached to the sides of the assembled drawer box using screws B (total 24) and E (total 36). Drawer slides (DR, L350) are also attached using screws B (total 24) and E (total 36). This assembly is repeated 6 times (indicated by 'x6' next to Part 20).
Components Used: Part 20 (x6), Part 26, Drawer Slides DL (L350), Drawer Slides DR (L350), Hardware B (x24), Hardware E (x36).
Step 11: Assemble Main Frame Supports
Attach vertical supports to the base panels.
The diagram shows Part 5 being attached to Part 6 using screws B (x9) and I (x2). Part 10 is also shown being attached to Part 6 using screws B (x9) and I (x2). This forms the main structure of the vanity base.
Components Used: Part 5, Part 6, Part 10, Hardware B (x9), Hardware I (x2).
Step 12: Attach Base to Frame
Attach the assembled frame to the base panel.
The diagram shows the structure from Step 11 being placed onto Part 7 and secured. This step seems to be a continuation of building the main vanity structure.
Components Used: Structure from Step 11, Part 7.
Step 13: Attach Drawer Runners to Main Frame
Attach drawer runners to the main vanity frame.
The diagram shows Part 4 being attached to the main frame (likely the structure from Step 12) using screws B (x7) and C (x2). This indicates the attachment of drawer runners or support panels for drawers.
Components Used: Part 4, Main Frame, Hardware B (x7), Hardware C (x2).
Step 14: Attach More Drawer Runners
Continue attaching drawer runners to the main vanity frame.
The diagram shows Part 6 and Part 14 being attached to the main frame using screws B (x9) and C (x2). Part 8 and Part 9 are also shown being attached with screws B and C. This step adds more support structures for drawers.
Components Used: Part 6, Part 14, Part 8, Part 9, Main Frame, Hardware B (x9), Hardware C (x2).
Step 15: Insert Drawer Base
Insert a drawer base panel into the assembled frame.
The diagram shows Part 7 being inserted into the main frame structure. This is likely the base for the drawers or a shelf.
Components Used: Part 7, Main Frame.
Step 16: Attach Drawer Runners to Frame
Attach drawer runners to the main vanity frame.
The diagram shows Part 13 being attached to the main frame using screws B (x7) and I (x2). This continues the process of building the drawer support structure.
Components Used: Part 13, Main Frame, Hardware B (x7), Hardware I (x2).
Step 17: Connect Main Vanity Sections
Connect the two main sections of the vanity.
The diagram shows two large sections of the vanity being joined. Part 12 and Part 13 are attached to Part 10 and Part 11 using screws B (x4) and J (x8). This likely connects the left and right drawer units to a central support or tabletop structure.
Components Used: Part 12, Part 13, Part 10, Part 11, Hardware B (x4), Hardware J (x8).
Step 18: Insert Drawers and Top
Insert the assembled drawers into the vanity frame and place the top panel.
The diagram shows the assembled vanity frame with drawers being slid into place. The top panel (Part 1) is indicated to be placed on top, with an arrow showing insertion.
Components Used: Assembled Vanity Frame, Assembled Drawers, Part 1 (Mirror Panel).
Step 19: Attach Mirror Support
Attach the mirror support structure to the vanity top.
The diagram shows Part 3 being attached to Part 1 (Mirror Panel) using screws C (x3) and G (x4). This forms the frame for the mirror assembly.
Components Used: Part 1 (Mirror Panel), Part 3, Hardware C (x3), Hardware G (x4).
Step 20: Attach Mirror Assembly to Vanity
Attach the mirror assembly to the main vanity structure.
The diagram shows the mirror assembly (from Step 19) being attached to the main vanity structure. Screws B (x12), C (x4), E (x2), L (x8), and K (x1) are used. This step connects the illuminated mirror unit to the main body of the vanity.
Components Used: Mirror Assembly, Main Vanity Structure, Hardware B (x12), Hardware C (x4), Hardware E (x2), Hardware L (x8), Hardware K (x1).
Step 21: Connect Lighting and Power
Connect the lighting components and power supply.
The diagram shows the light bulbs being connected via a chain/wire (S) and connectors (U). Screws T (x16) and Q (x12) are used to secure components. This step involves wiring the lights.
Components Used: Light Bulbs, Hardware S (x1), Hardware U (x2), Hardware T (x16), Hardware Q (x12).
Step 22: Connect Power Adapters and Cables
Connect the power adapters and internal wiring.
The diagram shows power adapters (N-1, N-2) and connectors (O-1, O-2, O-3) being plugged in. These are secured with hardware N (x12) and O (x2). This step finalizes the electrical connections for the lights and any integrated power outlets.
Components Used: Power Adapters (N-1, N-2), Connectors (O-1, O-2, O-3), Hardware N (x12), Hardware O (x2).
Step 23: Insert Drawers into Vanity
Insert the remaining assembled drawers into the vanity.
The diagram shows the main vanity structure with multiple drawer openings. Assembled drawers (parts 16, 20, 24, 29) are shown being inserted into their respective slots. Hardware Q (x12) and R (x12) are indicated for securing drawer fronts or components.
Components Used: Main Vanity Structure, Assembled Drawers, Hardware Q (x12), Hardware R (x12).
Step 24: Assemble Drawer Bases
Assemble the bases for the remaining drawers.
The diagram shows Part 29 and Part 28 being joined. Drawer slides (F, M) are attached to the sides using screws F (x4) and M (x4). This step prepares more drawer components.
Components Used: Part 29, Part 28, Drawer Slides F, Drawer Slides M, Hardware F (x4), Hardware M (x4).
Step 25: Assemble Drawer Sides
Assemble the sides of the drawers.
The diagram shows Part 28 and Part 29 being joined by Part 7. Drawer slides (G, L) are attached to the sides using screws C (x4), G (x8), and L (x8). This forms more drawer boxes.
Components Used: Part 28, Part 29, Part 7, Drawer Slides G, Drawer Slides L, Hardware C (x4), Hardware G (x8), Hardware L (x8).
Step 26: Attach Drawer Runners to Frame
Attach drawer runners to the main vanity frame.
The diagram shows Part 7 being attached to the main frame using screws J (x4). This step likely reinforces the drawer support system.
Components Used: Part 7, Main Frame, Hardware J (x4).
Step 27: Secure Vanity Base
Secure the base of the vanity.
The diagram shows Part 27 being attached to the main frame using screws F (x4) and M (x4). This likely forms the front base or a decorative element.
Components Used: Part 27, Main Frame, Hardware F (x4), Hardware M (x4).
Step 28: Wall Mounting
Secure the vanity to the wall for stability.
The diagram shows the fully assembled vanity. It indicates wall mounting using parts P (P-1, P-2, P-3). The inset shows the wall mounting process, where screws P-1, P-2, and P-3 are used to fix the vanity to the wall. This is a safety measure.
Components Used: Assembled Vanity, Hardware P (P-1, P-2, P-3).