Philips PV Vertical Panel 200Wp Installation

This document provides instructions for the installation of the Philips PV Vertical Panel 200Wp.

Safety Precautions

  • ℹ️ The system must be installed by qualified personnel only.
  • ⚠️ Disconnect luminaire battery and photovoltaic panel before installing.
  • ⚠️ Use gloves while any operation.
  • ℹ️ Follow this document for system installation.
  • ⚠️ Do not modify the fixation procedure.
  • ⚠️ Risk of accident if any incorrect torque tightening.

Product Identification and Ordering

The photovoltaic vertical panel and the kit for the installation can be ordered by these two codes:

  • 911401822202: 200Wp Vertical Panel Subsystem Vmpp 36V
  • 912300058711: Kit for the installation of the PV Vertical Panel in SunStay PRO Upgrade

Included Components:

  • PV panel module (1x)
  • Fixing holders (2x Male & 2x Female)
  • MC4 adapter (1 Male & 1 Female)
  • Mounting Instructions
  • Cables extensions (1x Male & 1x Female)
  • 1 x Grey cable gland
  • 1 x Sleeve 1200mm (47in)
  • 1 x Sleeve 650mm (25in)

Contact your local Signify employee for further information.

Dimensions and Specifications

Panel Dimensions:

  • Length: 2000 mm (78.75 in)
  • Pole range: Ø75-160 mm (Ø3-6 in)
  • Width: 200 mm (7.87 in)
  • Height: 228 mm (8.98 in)

Component Specifications:

ComponentWeightEPA
Vertical Photovoltaic panel59.1 lbs3.953 ft²

Electrical Specifications:

  • All MC4 male connectors are positive 18/36V+.
  • All MC4 female connectors are negative 18/36V-.
  • MC4 adapters (30cm) must be used only in case of installation of more than two Vertical PV Panels.
  • The MC4 connectors at the end of the red cables are to connect master-module and sub-module.
  • Do not connect the MC4 male and female connectors from the last master module.

Installation Height Recommendation:

The minimum recommended height to prevent from vandalism is 8.2 feet (2500 mm). This height can be reconsidered by the installer according the specific conditions.

Installation Steps

Step 1: Fixation to the Pole

Attach the fixing holders to the pole. Ensure they are positioned correctly for panel mounting.

Step 2: Secure Panel

Place the panel and secure it using the fixing holders. Tighten bolts to the specified torque (M8 16Nm) using a calibrated torque wrench.

Step 3: Connect Cables

Connect the cables to the PV panel module. Ensure correct polarity.

Step 4: Mount Panel Assembly

Attach the panel assembly securely to the pole.

Step 5: Cable Management

Route and secure the cables along the pole.

Step 6: Electrical Connections

Connect the extension cables. Ensure connections are secure.

Step 7: Final Cable Securing

Secure all connected cables, paying attention to the connector details shown in the close-up view.

Step 8: Completed Connection

The electrical connections are now complete for this stage.

Step 9: Panel Orientation

Adjust the panel's orientation as required.

Step 10: Final Torque Tightening

Perform final tightening of the panel mounting bolts to the specified torque (M8 16Nm).

Step 11: Luminaire Connection

Connect the panel cables to the luminaire. Attention: Do not connect the MC4 male and female connectors from the last master module.

Step 12: Multi-Panel Installation

In case of more than one Photovoltaic Vertical Panel, use the MC4 adapters for series connection.

Step 13: Luminaire Wiring

Connect the PV Vertical Panel to the luminaire. This may involve drilling a hole (Ø20mm) in the pole at a distance of 150mm-500mm (5.9in-19.7in) from the top.

Step 14: Internal Luminaire Connections

Make the internal electrical connections within the luminaire. Ensure correct torque for M20 connections (2.2Nm).

Step 15: Detailed Luminaire Wiring

Follow the detailed wiring diagram for connecting the panel to the luminaire's internal components. Ensure correct torque for M20 connections (1.8Nm).

Step 16: Final Luminaire Assembly

Complete the internal wiring and secure the luminaire components.

Step 17: Internal PV Connections

Observe the internal connections for PV1 and PV2, noting positive (+) and negative (-) terminals.

Step 18: Final Connection to Luminaire

Make the final connection to the luminaire. Attention: Do not connect the cables incorrectly.

General Warnings

Important: All storage, installation, use, operation, and maintenance of the products must be performed exactly according to the instructions in this manual and/or other instructions provided by Signify to guarantee safe use over its entire lifetime. Failure to adhere to these instructions will invalidate your entitlement to warranty. Bolts with torque indication on the drawing need to be tightened using a calibrated torque wrench. Pre-assembled bolts need to be retightened again to the required torque specification to assure maximum strength over lifetime.

Models: 911401822202, 912300058711, 912300058711 SolarForm Gen3 Off Grid Luminaires, 912300058711, SolarForm Gen3 Off Grid Luminaires, Gen3 Off Grid Luminaires, Grid Luminaires, Luminaires

File Info : application/pdf, 13 Pages, 1.01MB

PDF preview unavailable. Download the PDF instead.

SolarForm-G3-Vertical-Panels-MI

References

Microsoft PowerPoint for Microsoft 365

Related Documents

PreviewSignify SolarForm Gen2 Solar Street Lighting Installation Guide
Detailed installation instructions for the Signify SolarForm Gen2 off-grid solar street lighting luminaire. Includes safety warnings, required tools, hardware, step-by-step mounting procedures, dimensions, and maintenance recommendations.
PreviewDay-Brite CFI EM Kit - LED Panel (10W) SBP Installation Guide
Installation instructions for the Day-Brite CFI SBP LED Panel Emergency Kit (10W), model 442295573971, detailing mounting, wiring, and safety precautions. Features include color tuning and auxiliary power supply placement.
PreviewSignify BPP750 LED Solar Post Top Luminaire Specifications
Detailed technical specifications for the Signify BPP750 LED All-in-One Solar Post Top Luminaire series, covering various models with different luminous flux, color temperatures, battery capacities, and performance parameters.
PreviewSignify Sunstay Pro gen2 VGP726 Installation and Safety Guide
Installation and safety information for the Signify Sunstay Pro gen2 VGP726 outdoor LED luminaire. Details on component replacement and handling.
PreviewAl Azhar Kindergarten Lighting Project by Signify
Signify illuminates Al Azhar Kindergarten in Sragen, Central Java, Indonesia, with theatrical lighting inspired by Disneyland, creating a magical learning environment.
PreviewPhilips Maxos Fusion LL500E Gen2 Installation Guide and Specifications
Detailed installation guide and technical specifications for the Philips Maxos Fusion LL500E Gen2 LED lighting system, including wiring, DALI connection, and detection area information.
PreviewSignify North America Corporation Limited Warranty for Lighting Components
This document outlines the limited warranty provided by Signify North America Corporation for its branded lighting components, including lamps, drivers, ballasts, and modules. It details the warranty periods, conditions, exclusions, and remedies for product defects.
PreviewSignify Share Repurchase Period Update - June 30, 2025
Signify, a global leader in lighting, announced an update on its share repurchase program. The company repurchased 184,956 shares between June 23 and June 27, 2025, at an average price of EUR 21.72 per share, totaling EUR 4.0 million. These repurchased shares will be used to reduce the company's capital. The total number of shares repurchased under the program since its announcement on February 4, 2025, is 3,224,101 shares for a total consideration of EUR 65.2 million.