YITAHOME GZPFK-V1
ASSEMBLY INSTRUCTIONS
TV STAND
Notice
? 1. Follow the installation instructions. Please confirm all accessories are preset before installation.
2. Do not fully tighten the screws during initial assembly. Fully tighten screws only once all pieces which are correctly assembled.
3. If you encounter any problems during installation, please contact customer service.
Parts List
Label | Description | Quantity |
---|---|---|
A | M5X42 Screw | 34 PCS |
B | Ø15X12 Screw | 34 PCS |
C | M7X50 Screw | 16 PCS |
D | M3.5X14 Screw | 24 PCS |
E | Ø8X40 Screw | 8 PCS |
F | M3.5X30 Screw | 18 PCS |
G | Cam Lock Screw | 4 PCS |
H | Foot Pad | 4 PCS |
I | Cam Lock Nut | 8 PCS |
J | Dowel | 4 PCS |
K | Bracket | 1 PCS |
L | LED Light Strip Connector | 5 PCS |
M | LED Light Strip | 10 PCS |
N | Cable Clip | 2 SETS |
O | LED Light Strip (0.4M) | 1 PCS |
P | LED Light Strip (2M) | 1 PCS |
Q | M6x25 Screw | 6 PCS |
Assembly Steps
Step 1
Attach part 4 to part 5 twice, using hardware A.
Step 2
Attach part 16 to part 1, using hardware B and Q.
Step 3
Attach part 5 to part 4, using hardware B (12 PCS).
Step 4
Attach parts 6 and 7 to part 5, using hardware A (2 PCS) and B (2 PCS).
Step 5: Method 1 for Installing LED Light Strip
Tear off the tape and apply the LED light strip (M) to the plate. Press it firmly with your hand. Use hardware D (8 PCS) and M (8 PCS) for attachment.
Step 6: Method 2 for Installing LED Light Strip
Tear off the tape and apply the LED light strip (P) to the plate. Press it firmly with your hand. Use hardware P.
Step 7
Attach part 1 to part 7, using hardware A (8 PCS).
Step 8
Attach part 1 to part 6, using hardware B (8 PCS).
Step 9
Tear off the tape and apply the LED light strip to the plate. Press it firmly with your hand. Use hardware D (6 PCS), M (2 PCS), N (2 SETS), and P.
Step 10
Attach part 2 to parts 6 and 7, using hardware C (8 PCS).
Step 11
Attach part 2 to part 1, using hardware A (8 PCS).
Step 12
Attach parts 9, 10, 11, and 14 to the base (part 2), using hardware B (8 PCS) and E (8 PCS). This step involves using the Cam Lock Fastening System: insert the screw, then turn the cam lock to secure.
Step 13
Attach parts 12 and 13, using hardware G (4 PCS) and N (2 SETS). Insert N into holes and secure with G.
Step 14
Attach part 3 to the assembled structure (parts 7, 9, 11, 12, 13, 14), using hardware C (8 PCS).
Step 15
Attach parts 3, 4, 5, 6, and 7 to the main body, using hardware F (18 PCS), J (5 PCS), K (5 PCS), and L (1 PCS).
Step 16
Attach part 14 to the base, using hardware D (8 PCS) and I (8 PCS).
Step 17
Attach part 1 to the top, using hardware D (2 PCS).
Step 18
Attach part H (4 PCS) to the top.
Step 19
Insert a component into the designated slot.
Step 20
Connect cables. Ensure arrow marks are on the same side before connecting. The infrared receiver must be placed in front to receive the signal.
Step 21
Installation Completed.