HOMCOM 835-539 Tall Kitchen Cabinet Assembly Instructions
Important Information
Please retain these instructions for future reference. Read carefully.
Estimated assembly time: 120 minutes. Number of steps: 21.
Packing Details: Total 2 Boxes
Box-1/2
No. | Parts | Qty |
---|---|---|
1 | [Part 1] | x1 |
6 | [Part 6] | x2 |
7 | [Part 7] | x1 |
11 | [Part 11] | x1 |
12 | [Part 12] | x1 |
14 | [Part 14] | x2 |
15 | [Part 15] | x1 |
Box-2/2
No. | Parts | Qty |
---|---|---|
2 | [Part 2] | x1 |
3 | [Part 3] | x1 |
4 | [Part 4] | x1 |
5 | [Part 5] | x1 |
8 | [Part 8] | x1 |
9 | [Part 9] | x1 |
10 | [Part 10] | x1 |
13 | [Part 13] | x1 |
16 | [Part 16] | x1 |
17 | [Part 17] | x1 |
18 | [Part 18] | x1 |
19 | [Part 19] | x1 |
20 | [Part 20] | x1 |
21 | [Part 21] | x1 |
22 | [Part 22] | x1 |
23 | [Part 23] | x1 |
24 | [Part 24] | x1 |
25 | [Part 25] | x1 |
26 | [Part 26] | x1 |
Hardware Kit
A x21 (Ø6x35), B x21 (Ø15x10), C x26 (Ø6x30), D x13 (Ø4x40), E x12 (Ø3x12), F x6 (Ø15mm), G x2, H x8, J x6, K x2, M x8, N x48 (Ø3.5x14), O x2, CL x1, CR x1, DL x1, DR x1.
Note: Do not confuse similar screws.
Assembly Steps
Step 1: Drawer Slide Installation
Ensure the exact hole is used for installation to prevent misalignment. The screws on the drawer slide must be leveled to ensure smooth drawer operation.
Diagram Description: Shows parts labeled 8, 9, CL, CR, E, and A being assembled. Part 8 is a side panel. Part 9 is a drawer slide. Screws A and E are used for attachment. CL and CR are also shown as components.
Step 2: Drawer Assembly
Diagram Description: Shows parts labeled 8, 10, 12, 13, B, and C being assembled to form a drawer box. Screws B and C are used.
Step 3: Drawer Assembly Continued
Diagram Description: Similar to Step 2, showing parts 8, 10, 12, 13, 9, B, and C being assembled. Part 9 is a drawer slide.
Step 4: Drawer Assembly with Screws F
Diagram Description: Shows parts 8, 12, 9, 13, and F being assembled. Screw F is used for attachment.
Step 5: Attaching Drawer Slides
Diagram Description: Shows parts 8, 12, 9, and C being assembled. Screw C is used for attachment.
Step 6: Attaching Shelves
Diagram Description: Shows parts 7, 2, and 3 being attached to other components using screws A.
Step 7: Assembling Drawer Sides
Diagram Description: Shows parts 2, 5, and 3 being assembled using screws A, B, and C.
Step 8: Attaching Part 1
Diagram Description: Shows part 1 being attached using screws G and C.
Step 9: Assembling with Screws D and C
Diagram Description: Shows parts 1, 2, and 3 being assembled using screws D and C.
Step 10: Assembling with Screws C and D
Diagram Description: Shows parts 2, 5, 3, and 7 being assembled using screws C and D.
Step 11: Attaching Handles and Drawer Slides
Diagram Description: Shows parts 5, 14, M, N, L, and hardware components being used to attach handles to drawers and drawer slides.
Step 12: Assembling Main Frame
Diagram Description: Shows the main cabinet structure being assembled using parts 8, 12, 9, 13, and B.
Step 13: Attaching Back Panels
Diagram Description: Shows parts 9, 2, 5, 3, and 7 being attached to the main structure using screws 24, 25, and 26.
Step 14: Attaching Side Panels
Diagram Description: Shows parts 1, 3, 7, 9, 20, 21, 22, 23, 24, 25, and 26 being attached. Screws J, E, and D are used.
Step 15: Attaching Top Shelf
Diagram Description: Shows part 11 being attached to the cabinet using hardware H.
Step 16: Attaching Doors
Diagram Description: Shows doors (part 14) being attached to the cabinet using hardware N and M. The buckles have 3 optional adjustment positions.
Step 17: Attaching Shelves
Diagram Description: Shows parts 2, 3, and 4 being placed into the cabinet.
Step 18: Attaching Doors to Cabinet
Diagram Description: Shows doors (part 6) being attached to the cabinet using hardware M and N.
Step 19: Attaching Upper Cabinet Doors
Diagram Description: Shows upper cabinet doors (part 6) being attached using hardware N and M. The buckles have 3 optional adjustment positions.
Step 20: Assembling Base Unit
Diagram Description: Shows parts 15, 16, 17, 18, 19, 20, DL, and DR being assembled using screws A, B, C, D, and E.
Step 21: Wall Mounting (Anti-Dumping Belt)
This is an anti-dumping belt that fixes the product to the wall. It can be used or not, depending on your needs. If it is a solid wall, use expansion and self-tapping screws. If it is a wooden wall, use only self-tapping screws and do not overtighten.
Diagram Description: Shows the anti-dumping belt (K) being attached to the wall and the cabinet using screws.
Step 22: Final Check
Be careful to push in the board when both sides slide way have been aligned.