Radiators 4u

Est 2002

Installation Guide – Central Heating Vertical Hook Hung Radiators Short Column

1. Overview

This guide provides instructions for the following configurations of Hook Hung towel rails and Radiators.

  1. Central Heating System and Radiator installed on Masonry Walls.

IMPORTANT NOTE: Please read the guide in full before attempting Installation. It is also recommended that you read the User Manual and Warranty Document prior to installing.

IMPORTANT NOTE: These instructions cater for Masonry Walls that are assumed to be sufficiently strong, while it may be possible to install into other wall types, the installation engineer will need to adapt the instructions and fixings to suit the location that the radiator/towel rail is being installed in.

2. Contents of Package

The contents of your package will include 1 x Radiator and the below items. Please check that these parts are included, if there is anything missing, please contact your retailer for further assistance.

Contents (Included)DescriptionReference
[Image of Blanking Plug]1 x Blanking PlugA
[Image of Air Vent]1 x Air VentB
[Image of Masonry Wall Plugs]8 x Masonry Wall PlugsC
[Image of Long Screws]8 x Long ScrewsD
[Image of Hooks]4 x HooksE
[Image of Rubber rings]2 x Rubber ringsF

3. Tools and Parts Required

The following tools and parts may be required dependant on installation location. These are not included as part of the Radiator/towel rail package, although some may have been purchased at the same time.

Note: Where images are provided for the below, they are simply visual aid examples and may not reflect exactly the part or tool you are using.

Tool / PartDescription
[Image of Measuring Tape]Measuring Tape
[Image of Pencil]Pencil
[Image of PTFE Tape]PTFE Tape
[Image of Philips Screwdriver]Philips Screwdriver (cross head)
[Image of Flat Head Screwdriver]Flat Head Screwdriver
[Image of Spanner]Spanner
[Image of 8mm Masonry Drill Bit]8mm Masonry Drill Bit
[Image of Tile and Glass Drill Bit]Tile and Glass Drill Bit (If the wall is tiled, you may need to use one of these prior to using the masonry drill bit.)
[Image of Electric Drill]Electric Drill
[Image of Spirit Level]Spirit Level
[Image of Manual or Thermostatic Valves]Manual or Thermostatic Valves

4. Locating the Flow Blocker

Vertical Radiators have a flow blocker to help the water circulate around the radiator accounting for the additional height. This makes them work just as well as horizontal radiators.

The side with the flow diverter is usually marked with a small sticker, however, in the instance that this is not on the radiator, look into the connection points (a light source may be needed).

When the radiator is mounted, the block should be on the Hot Water Flow side of the radiator.

[Diagram of radiator showing flow blocker and hot water flow pipe connection]

Hot Water Flow Pipe

Flow Blocker

5. Central Heating Installation

Step 1

Attach rubber rings (F) (if not already applied) and apply PFTE tape to Blanking Plug (A) and Air Vent (B). Insert into top 2 threads of radiator and tighten with Spanner. [Image showing step 1]

Step 2

(Check Valve Instructions) – If appropriate, apply PFTE tape to Valve Tails and insert into bottom 2 threads of Radiator and tighten. [Image showing step 2]

Step 3

In your desired location, mark the two drill points for each of the 4 Hooks (E) using a pencil. These should install at least 1 column from either end, the brackets go around the column. Ensure your markings are level using a spirit level before proceeding. [Image showing step 3]

Step 4

  1. Using the drill and 8mm masonry drill bit, drill a hole in the 2 marked locations for each Hook(E). (Note: on tiled walls you may need to use a tile drill bit prior to masonry).
  2. Insert the two Wall Plugs (C) for each hook.
  3. Insert the two screws(D) for each hook. Fully tighten the 2 screws for the top 2 hooks, and partially tighten the 2 screws for the bottom 2 hooks. [Image showing step 4]

Step 5

Hang the radiator on the top 2 hooks. Adjust the bottom 2 hooks and fully tighten the 2 screws with a spanner. [Image showing step 5]

Step 6

You are now ready to run, adjust and connect your piping and valve to the radiator valve tail inserted into the radiator during step 2.

Step 7

Prior to operating the radiator, you may need to flush the system to clear any residue.

Step 8

Prior to operating the Radiator, please review the User Manual.

Step 9

When the heating system is turned on for the first time, you may need to bleed the radiator using the air vent installed on the top thread per step 1. You may need to do this several times and if on a pressurised system, you may need to top up the pressure each time the radiator is bled.

Step 10

You may now also need to balance the central heating system to account for this radiator.

Step 11

If there are any issues with the radiator, please first consult the User Manual including the troubleshooting section.

Models: Vertical Hook Hung Radiators, Hook Hung Radiators, Hung Radiators, Radiators

PDF preview unavailable. Download the PDF instead.

Cheltenham Vertical Radiator Installation Guide LibreOffice 25.2.2.2 (X86 64) / LibreOffice Community Draw

Related Documents

PreviewInstallation Guide for Central Heating Hook Hung Radiators
A comprehensive installation guide for Central Heating Hook Hung Radiators, detailing the process for central heating systems and radiators installed on masonry walls. Includes a list of required tools and parts, and step-by-step instructions for central heating installation.
PreviewGoodwood White Radiator Fixing and Installation Guide
Official fixing and installation instructions for the Goodwood White 2 Column Vertical Radiator from Radiators 4u. Includes technical specifications, contents, and terms.
PreviewRadiator User Manual - Installation, Operation, and Troubleshooting
Comprehensive user manual for Radiators 4u radiators, covering installation, operation, maintenance, and troubleshooting for central heating, dual fuel, and electric-only systems.
PreviewCast Iron Radiators: Handling, Installation, and Care Guide
Comprehensive guide on the proper handling, installation, and care of cast iron radiators, including delivery instructions, system water treatment, valve installation, and assembly procedures.
PreviewRadiator Manufacturer's Warranty - Terms, Coverage & Claims | Radiators 4u
Detailed manufacturer's warranty information for Radiators 4u products. Covers warranty terms, what's included, exclusions, how to make a claim, and troubleshooting for heating and noise issues. Learn about your consumer rights.
PreviewClassic Colour Radiator Fixing and Installation Guide | Radiators 4u
Comprehensive fixing and installation instructions for the Classic Colour Radiator by Radiators 4u. Includes specifications, what's in the box, installation steps, and terms and conditions.
PreviewAluminium Radiator Installation Guide - Infinity Aluminium Radiator
A comprehensive installation guide for the Infinity Aluminium Radiator, covering hanging, flow diverter installation, reducing bushes, and water treatment for central heating systems.
PreviewInfinity Radiator Fixing and Installation Instructions
Comprehensive guide for fixing and installing the Infinity Radiator, including specifications, content list, installation steps, and terms and conditions from Radiators 4U.